Traffic – KVIA https://kvia.com Where News Comes First Sun, 08 Sep 2024 14:52:38 +0000 en-US hourly 1 https://wordpress.org/?v=6.4.3 https://kvia.b-cdn.net/2019/10/kvia-favicon.ico Traffic – KVIA https://kvia.com 32 32 Pump Patrol https://kvia.com/traffic/2022/07/25/pump-patrol/ https://kvia.com/traffic/2022/07/25/pump-patrol/#respond Mon, 25 Jul 2022 13:22:50 +0000 https://kvia.com/?p=1013606

The post Pump Patrol appeared first on KVIA.

]]>

The post Pump Patrol appeared first on KVIA.

]]>
https://kvia.com/traffic/2022/07/25/pump-patrol/feed/ 0 ]]>
Traffic Cams https://kvia.com/traffic/2022/07/25/traffic-track/ https://kvia.com/traffic/2022/07/25/traffic-track/#respond Mon, 25 Jul 2022 13:26:08 +0000 https://kvia.com/?p=1013613

The post Traffic Cams appeared first on KVIA.

]]>

The post Traffic Cams appeared first on KVIA.

]]>
https://kvia.com/traffic/2022/07/25/traffic-track/feed/ 0 ]]>
Bridge Wait Times  https://kvia.com/traffic/2022/07/25/bridge-wait-times/ https://kvia.com/traffic/2022/07/25/bridge-wait-times/#respond Mon, 25 Jul 2022 13:28:57 +0000 https://kvia.com/?p=1013617

The post Bridge Wait Times  appeared first on KVIA.

]]>

The post Bridge Wait Times  appeared first on KVIA.

]]>
https://kvia.com/traffic/2022/07/25/bridge-wait-times/feed/ 0 ]]>
Play 2 Win https://kvia.com/traffic/2022/07/25/play-2-win/ https://kvia.com/traffic/2022/07/25/play-2-win/#respond Mon, 25 Jul 2022 13:31:40 +0000 https://kvia.com/?p=1013621

The post Play 2 Win appeared first on KVIA.

]]>

The post Play 2 Win appeared first on KVIA.

]]>
https://kvia.com/traffic/2022/07/25/play-2-win/feed/ 0 ]]>
Pellicano to see road closures through September https://kvia.com/traffic/2024/09/08/pellicano-to-see-road-closures-through-september/ https://kvia.com/traffic/2024/09/08/pellicano-to-see-road-closures-through-september/#respond Sun, 08 Sep 2024 14:52:36 +0000 https://kvia.com/?p=1285260

EL PASO, Texas (KVIA) -- A road closure could impact your commute if you are driving on the east side this weekend. Pellicano will see road closures between its intersections with Aircoupe, and with Darrington, starting Sunday. The closures are expected to last until at least the end of the month. El Paso Electric will

The post Pellicano to see road closures through September appeared first on KVIA.

]]>

EL PASO, Texas (KVIA) -- A road closure could impact your commute if you are driving on the east side this weekend.

Pellicano will see road closures between its intersections with Aircoupe, and with Darrington, starting Sunday. The closures are expected to last until at least the end of the month.

El Paso Electric will be installing electrical poles and hardware to service new development within the immediate area.

The company will be working nights from 7 p.m. to 6 a.m., from Sunday nights to Friday mornings. The east bound lane closure will be in effect during that time frame.

Officials said drivers should be aware that the closure may extend beyond these times if unforeseen issues or delays occur.

The post Pellicano to see road closures through September appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/09/08/pellicano-to-see-road-closures-through-september/feed/ 0 ]]>
I-10 East closure will last until Monday https://kvia.com/news/2024/09/08/i-10-east-closure-will-last-until-monday/ https://kvia.com/news/2024/09/08/i-10-east-closure-will-last-until-monday/#respond Sun, 08 Sep 2024 14:20:57 +0000 https://kvia.com/?p=1285246

EL PASO, Texas (KVIA) -- If you were driving on I-10 East in West El Paso Saturday, you may have encountered a lot of traffic due to the Texas Department of Transportation's closure for road work. And if you're planning on driving in the area Sunday, you may encounter the same issue. That's because the

The post I-10 East closure will last until Monday appeared first on KVIA.

]]>

EL PASO, Texas (KVIA) -- If you were driving on I-10 East in West El Paso Saturday, you may have encountered a lot of traffic due to the Texas Department of Transportation's closure for road work.

And if you're planning on driving in the area Sunday, you may encounter the same issue. That's because the closure lasts a total of 48 hours: until 5 a.m. Monday.

If you are unable to avoid driving in the area before the closure ends, you'll want to know the detour put in place: You will need to take South Desert Boulevard, to re-enter I-10, past Mesa.

This is to allow TXDOT crews to re-strip parts of the main lanes, and relocate concrete safety barriers on the freeway between Transmountain Road and North Mesa Street.

The post I-10 East closure will last until Monday appeared first on KVIA.

]]>
https://kvia.com/news/2024/09/08/i-10-east-closure-will-last-until-monday/feed/ 0 ]]>
ABC-7 Traffic Alert: 49-Hour closure to impact west El Paso drivers https://kvia.com/traffic/2024/09/06/abc-7-traffic-alert-49-hour-closure-to-impact-west-el-paso-drivers/ https://kvia.com/traffic/2024/09/06/abc-7-traffic-alert-49-hour-closure-to-impact-west-el-paso-drivers/#respond Fri, 06 Sep 2024 23:30:00 +0000 https://kvia.com/?p=1284732

El Paso, TX (KVIA-TV)—Tx Dot El Paso crews will begin widening the freeway in the median between Mesa Street and Redd Road. According to TX Dot El Paso, the operation will begin in the eastbound lanes, requiring a 49-hour closure of I-10 from Redd to Mesa. The closure will start at 4 am on Saturday, September 7,

The post ABC-7 Traffic Alert: 49-Hour closure to impact west El Paso drivers appeared first on KVIA.

]]>
traffic alert
KVIA

El Paso, TX (KVIA-TV)—Tx Dot El Paso crews will begin widening the freeway in the median between Mesa Street and Redd Road. According to TX Dot El Paso, the operation will begin in the eastbound lanes, requiring a 49-hour closure of I-10 from Redd to Mesa. The closure will start at 4 am on Saturday, September 7, and be in place until 5 am on Monday, September 9. All traffic will exit at Redd and take the south desert past Mesa. The following weekend, a  49-hour closure will begin in the westbound lanes between Mesa and Redd. TX Dot officials explain that crews will work on widening two bridges between Vinton Road and Transmountain Road. Then, a 56-hour closure of the eastbound lanes will go into effect the weekend of September 13. South Desert will temporarily reopen to just one lane for the eastbound detour. TX Dot officials say you should plan to avoid the area and take an alternate route if possible.

The post ABC-7 Traffic Alert: 49-Hour closure to impact west El Paso drivers appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/09/06/abc-7-traffic-alert-49-hour-closure-to-impact-west-el-paso-drivers/feed/ 0 ]]>
Train derailment South of Juárez leaves multiple migrants injured; one child dead https://kvia.com/news/border/2024/09/04/train-derailment-south-of-juarez-leaves-multiple-migrants-injured-one-child-dead/ https://kvia.com/news/border/2024/09/04/train-derailment-south-of-juarez-leaves-multiple-migrants-injured-one-child-dead/#respond Wed, 04 Sep 2024 23:19:46 +0000 https://kvia.com/?p=1283459

JUAREZ, Chihuahua (KVIA) -- Juárez, Chihuahua, and Mexican authorities responded to reports of a train derailment Tuesday night. According to a statement sent by the City of Juárez, personnel from the Civil Protection Department responded to a call at 11:01 p.m. last night. "The train derailment happened at kilometer 302 of the Juárez-Chihuahua highway, between

The post Train derailment South of Juárez leaves multiple migrants injured; one child dead appeared first on KVIA.

]]>

JUAREZ, Chihuahua (KVIA) -- Juárez, Chihuahua, and Mexican authorities responded to reports of a train derailment Tuesday night.

According to a statement sent by the City of Juárez, personnel from the Civil Protection Department responded to a call at 11:01 p.m. last night.

"The train derailment happened at kilometer 302 of the Juárez-Chihuahua highway, between Villa Ahumada and Samalayuca," said Sergio Rodríguez, Director of Juárez Civil Protection.

Officials reported that in this incident left 13 train cars overturned, of which five were transporting sulfuric acid.

A leak was detected in one of these tanks with a capacity of approximately 53,000 liters, identified with the number 1830. The leak was provisionally controlled using a wooden stake.

Rodriguez also said a tank car transporting chlorine gas suffered structural damage, although no leaks of this chemical were reported.

The director of Civil Protection added that during the search efforts in the area, it was reported that several migrants were traveling on top of the train.

After a pedestrian search, they located four people, to whom pre-hospital care was provided.

Local and federal reports said the injured people are:

  • A woman originally from Venezuela, with a right foot amputation and hip pain. She was transferred to the General Hospital
  • A 17-year-old male was also transported to the General Hospital
  • A 7-year-old boy had direct trauma in the head; he was turned over to the National Migration Institute along with his dad

Rodríguez said that members of the Fire Department, the Municipal Rescue Department, the Red Cross, URGE, Chihuahua State Police, Chihuahua Attorney General's Office, as well as the National Migration Institute, the National Guard, participated in the operation, and Ferromex which oversees all cargo trains in Mexico.

Authorities continue with the investigations to determine the causes of the derailment and ensure that no more people are affected.

The post Train derailment South of Juárez leaves multiple migrants injured; one child dead appeared first on KVIA.

]]>
https://kvia.com/news/border/2024/09/04/train-derailment-south-of-juarez-leaves-multiple-migrants-injured-one-child-dead/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of September 2 to 6 https://kvia.com/traffic/2024/09/02/road-closures-in-el-paso-county-las-cruces-for-the-week-of-september-2-to-6/ https://kvia.com/traffic/2024/09/02/road-closures-in-el-paso-county-las-cruces-for-the-week-of-september-2-to-6/#respond Mon, 02 Sep 2024 11:52:11 +0000 https://kvia.com/?p=1282171

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures September 2 to September 6. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information

The post Road closures in El Paso County, Las Cruces for the week of September 2 to 6 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures September 2 to September 6. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

I-10 Widening West

Tuesday, September 3, through Saturday, September 7

9 a.m. to 4 p.m.

  • Alternating lane closures are possible on Redd Road between North Desert Boulevard and South Desert Boulevard.

Crews are conducting electrical work.

Tuesday, September 3, through Saturday, September 7

9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed.

Crews will be working on retaining walls.

Tuesday, September 3, through Thursday, September 5

9 p.m. to 5 a.m.

  • I-10 East will be reduced to one lane between Vinton Road and Los Mochis Drive.

Crews will be working on concrete paving and placing deck panels

Tuesday, September 3, through Thursday, September 5

9 p.m. to 5 a.m.

  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard

EASTBOUND REDD DETOUR: South Desert to Mesa Street Turnaround to North Desert.

WESTBOUND REDD DETOUR: North Desert to Artcraft to South Desert.

Crews will be placing bridge deck panels.

US-54 & State Line Project

Tuesday, September 2 through Friday, September 6

7:00 a.m. to 4:00 p.m.

  • US-54 south- and northbound from State Line Road reduced to one lane

Crews will be working demolition and preparation of the new turnaround of side shoulders.

Montana Mill & Inlay Project

Sunday, September 1 through Friday, September 6

9 p.m. to 6 a.m. (Nightly)

  • Montana Avenue (US-62) eastbound alternating lane closures Hawkins Boulevard to Airway Boulevard

Monday, September 2 through Friday, September 6

9 a.m. to 4 p.m. (Daily)

  • Montana Avenue (US-62) eastbound alternating lane closures Hawkins Boulevard to Airway Boulevard

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential / business access locations may be temporarily shifted due to milling/paving activities.

North Mesa Street Lighting Improvement Project

Tuesday, September 3 through Friday, September 6

9 a.m. to 4 p.m.

  • Mobile/Moving Traffic Operation –Mesa (SH-20) northbound and southbound alternating left and right lane closures I-10 to Doniphan Drive
  • If Needed – Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Sunland Park Drive
  • If Needed – Mesa (SH-20) northbound and southbound left lane closures Executive Center Boulevard to Festival Drive
  • If Needed – Mesa (SH-20) northbound and southbound alternating left and right lane closures Mesita Drive/Sun Bowl Drive to Executive Center Boulevard
  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, installing new lighting poles, removing existing poles, electrical inspection, and Concrete sidewalk and landscape repairs.

Traffic Signal Improvements Project

Monday, September 2 through Friday, September 6

9 a.m. to 4 p.m.

  • Dyer (BUS-54) north and southbound right lane closures at the Tetons Drive intersection.
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection
  • If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn-around closures at Martin Luther King Boulevard/Kenworthy Street intersection
  • If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn-around closures at Sun Valley Drive intersection

Crews will be working on intersection improvements.

Tuesday, September 2 through Friday, September 6

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures

Crews will be potholing and boring to line locate.

Wednesday, September 4 and Thursday, September 5

9 p.m. to 5 a.m. (Nightly)

  • Mesa east- and westbound at Belvidere intersection alternate lane closures

Crews will be striping.

Tuesday, September 2 through Friday, September 6

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be working on traffic signals.

Wednesday, September 4 and Thursday, September 5

9 p.m. to 5 a.m. (Nightly)

  • Zaragoza and George Dieter intersection alternate lane closures

Crews will be striping.

Guardrail Repair Project

Tuesday, September 3

9:00 a.m. to 4:00 p.m.

  • I-10 eastbound between Hawkins and Viscount right lane closed with a complete off-ramp closure at Viscount

Wednesday, September 4

9:00 a.m. to 4:00 p.m.

  • I-10 westbound between Mesa and Porfirio Diaz right lane closed with a complete off-ramp closure at Porfirio Diaz

Thursday, September 5

9:00 a.m. to 4:00 p.m.

  • Gateway South southbound between Broaddus and Fred Wilson right lane closed to Ft. Bliss entrance

Paisano Bridge Replacement

Monday, September 16, 2024 through Tuesday, September 16, 2025

Continuous closure

  • US-62 (Paisano) eastbound between Doniphan and Executive

Crews will be working on demolition and bridge work.

Spall Repair Project

Tuesday, September 3 through Thursday, September 5

9 p.m. to 5 a.m. (Nightly)

  • I-10 westbound between McRae overpass and Cotton overpass alternate lane closures

Crews will be working on spall repairs.

North Mesa Street Rehabilitation Project

Monday, September 2 through Friday, September 6

9 a.m. to 4 p.m.

  • If Needed - Mesa (SH-20) northbound and southbound alternating lane closures Yandell Drive to Glory Road / East Baltimore Drive

Crews will be working on finishing items, striping, and small concert work

Maintenance

Tuesday, September 3 through Friday, September 6

9 a.m. to 3 p.m.

  • Spur 601 westbound between Chaffee and Loop 375 shoulder closed

Crews will be working on shoulder.

  • US-54 southbound at Montana exit closed.
  • Porfirio Diaz overpass east- and westbound complete closure

Crews will be working on bridge deck.

Montana Widening Project

Monday, August 26 to Monday, September 30

Daily, 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure from Dominican Street to Leticia Street.

Crews will be working on exporting material.

Tuesday, September 3 to Tuesday, September 10

Nightly, 9 a.m. to 5 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road full closure from Lee Boulevard to Loop 375

Crews will be working on removing barrier.

Purple Heart Widening Project

Friday, September 6 to Friday, September 13

Daily, 9 a.m. to 4:30 p.m.

  • Purple Heart Highway (SL 375) northbound left lane closure from Montana Avenue to Iron Medics Drive

Crews will be paving in median.

Continuous closure until further notice

  • Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601

Crews will be widening main lanes and constructing north and southbound frontage road.

Loop 375 Widening Project

Tuesday, September 3 to Thursday, September 5

Nightly, 9:00 p.m. to 5:00 a.m.

·       Loop 375 (Americas Highway) northbound main lane closure between Zaragoza (POE) and North Loop

Crews will be working on installing delineators, embankment, and roadway structures.

Horizon/Darrington Reconstruction Project

Tuesday, September 3 to Friday, September 6

Daily, 9 a.m. to 4 p.m.

  • Horizon Boulevard (FM1281) east- and westbound right lane closure at Darrington Road intersection.
  • Darrington Road north- and southbound right lane and turn lane closure at Horizon Boulevard (FM1281) intersection.

Crews will be setting up wire and signal heads on temporary poles.

Tuesday, September 3 to Friday, September 6

Daily, 9 a.m. to 4 p.m.

  • Horizon Boulevard (FM1281) east and westbound intermittent lane closures
  • Darrington Road north- and southbound left lane and left turn lane closure from Horizon Boulevard (FM1281) intersection to Delake Drive

Crews will be working on the median demolition.

Monday, March 25 until further notice

  • Horizon Boulevard (FM1281) westbound lane closure from Torrey Pines to Desert Mesa Drive, lanes reduced to one lane.
  • Horizon Boulevard (FM1281) hike/bike trail from Torrey Pines to Desert Mesa Drive will be closed indefinitely.

Friday, June 28 until further notice

  • Horizon Boulevard (FM 1281) westbound lane from Desert Mesa to Rodman Street will be shifted to the median and transitioned back on Rodman Street
  • Horizon Boulevard (FM 1281) and Lago Del Esta intersection closure

Crews will be working on final subgrade, pavement operations and excavating ponding areas.

Alameda Raised Medians Project

Monday, September 2 to Thursday, September 5

Nightly, 9 p.m. to 6 a.m.

  • Alameda Avenue (SH-20) east and westbound inside lane closures between Rio Vista Road and Passmore Road

Crews will be installing concrete medians.

Monday, September 2 to Friday, September 6

Daily, 9 a.m. to 4 p.m.

  • Alameda Avenue (SH-20) east and westbound inside lane closures between Rio Vista Road and Passmore Road

Crews will be installing concrete medians and electrical items.

Loop 375 Mill and Inlay Project

Thursday, August 29

9 a.m. to 4 p.m.

  • Americas Avenue (frontage road) southbound left lane closure between South Side Road and South Americas Avenue Underpass.

Crews will be saw-cutting roadway asphalt.

Tuesday, September 3 to Thursday, September 5

Nightly, 7:30 p.m. to 6 a.m.

  • Joe Battle Boulevard north and southbound alternating lane closures between Pellicano Drive and Montana Avenue
  • Company E Highway (Loop 375) exit and entrance ramps will be closed between Pellicano Drive and Edgemere Boulevard

Crews will be pouring concrete and placing hot mix asphalt.

The post Road closures in El Paso County, Las Cruces for the week of September 2 to 6 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/09/02/road-closures-in-el-paso-county-las-cruces-for-the-week-of-september-2-to-6/feed/ 0 ]]>
TXDOT closures happening this week https://kvia.com/traffic/2024/09/01/txdot-closures-happening-this-week/ https://kvia.com/traffic/2024/09/01/txdot-closures-happening-this-week/#respond Sun, 01 Sep 2024 11:29:45 +0000 https://kvia.com/?p=1281925

EL PASO, Texas (KVIA) -- There are four closures happening this week that El Paso drivers should be aware of. All of them start Tuesday. CLOSURES STARTING AT 9 A.M. TUESDAY Two closures will take place from 9 a.m. to 4 p.m. starting Tuesday: Alternating lane closures are possible on Redd Road between North Desert

The post TXDOT closures happening this week appeared first on KVIA.

]]>

EL PASO, Texas (KVIA) -- There are four closures happening this week that El Paso drivers should be aware of. All of them start Tuesday.

CLOSURES STARTING AT 9 A.M. TUESDAY

Two closures will take place from 9 a.m. to 4 p.m. starting Tuesday:

  • Alternating lane closures are possible on Redd Road between North Desert Boulevard and South Desert Boulevard. Crews will be conducting electrical work. This closure will last until Saturday.
  • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed. Crews will be working on retaining walls. This closure will last through Thursday.

CLOSURES STARTING AT 9 P.M. TUESDAY

Two closures will take place from 9 p.m. to 5 a.m. starting Tuesday:

  • I-10 East will be reduced to one lane between Vinton Road and Los Mochis Drive. Crews will be working on concrete paving and placing deck panels. This closure will last through Thursday.
  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard. There are two detours to be aware of: the eastbound detour at South Desert to Mesa Street Turnaround to North Desert, and the westbound detour at North Desert to Artcraft to South Desert. Crews will be placing bridge deck panels.

The post TXDOT closures happening this week appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/09/01/txdot-closures-happening-this-week/feed/ 0 ]]>
Traffic Alert: El Paso Fire responding to six vehicles stuck in flooded streets so far https://kvia.com/traffic/2024/08/30/traffic-alert-el-paso-police-txdot-and-el-paso-fire-warn-drivers-of-flooding-at-i-10-west-and-cotton/ https://kvia.com/traffic/2024/08/30/traffic-alert-el-paso-police-txdot-and-el-paso-fire-warn-drivers-of-flooding-at-i-10-west-and-cotton/#respond Sat, 31 Aug 2024 02:32:48 +0000 https://kvia.com/?p=1281507

UPDATE: TxDOT say the flooding among some roads are dissipating, however Missouri is still flooded. TxDOT posted crews are working to clear drains to allow the water to flow out of the roadway. UPDATE: El Paso Fire crews have been busy responding to reports of vehicles stuck on flooded streets after Friday's storm. So far

The post Traffic Alert: El Paso Fire responding to six vehicles stuck in flooded streets so far appeared first on KVIA.

]]>

UPDATE: TxDOT say the flooding among some roads are dissipating, however Missouri is still flooded.

TxDOT posted crews are working to clear drains to allow the water to flow out of the roadway.

UPDATE: El Paso Fire crews have been busy responding to reports of vehicles stuck on flooded streets after Friday's storm.

So far they have responded to six calls, most in the central and downtown area.

El Paso Fire reminds drivers to avoid driving on flooded roads. Turn around, don't drown.

EL PASO, Texas (KVIA) - Emergency crews are responding to a vehicle stuck in on Missouri West and I-10 West after Friday's rain flooded the area.

El Paso Police say the right four lanes at I-10 West at Cotton are closed, and the traffic is backed up past Copia. Clearing time is estimated at 2 hours.

TxDOT posted a vehicle was stuck in the high waters along Missouri, and urges drivers to seek an alternate route and higher ground.

The post Traffic Alert: El Paso Fire responding to six vehicles stuck in flooded streets so far appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/08/30/traffic-alert-el-paso-police-txdot-and-el-paso-fire-warn-drivers-of-flooding-at-i-10-west-and-cotton/feed/ 0 ]]>
ABC-7 at 4: Labor Day Drive Sober No Regrets https://kvia.com/traffic/2024/08/30/abc-7-at-4-labor-day-drive-sober-no-regrets/ https://kvia.com/traffic/2024/08/30/abc-7-at-4-labor-day-drive-sober-no-regrets/#respond Fri, 30 Aug 2024 21:23:51 +0000 https://kvia.com/?p=1281233

El Paso, TX (KVIA-TV)-Labor Day weekend is a time to celebrate the unofficial end of summer with friends and family. It should be a fun and relaxing holiday, but because people choose to drink and drive, it can often be a dangerous one. Tx Dot El Paso closures: https://its.txdot.gov/its/District/ELP/lane-closures

The post ABC-7 at 4: Labor Day Drive Sober No Regrets appeared first on KVIA.

]]>

El Paso, TX (KVIA-TV)-Labor Day weekend is a time to celebrate the unofficial end of summer with friends and family. It should be a fun and relaxing holiday, but because people choose to drink and drive, it can often be a dangerous one.

Tx Dot El Paso closures: https://its.txdot.gov/its/District/ELP/lane-closures

The post ABC-7 at 4: Labor Day Drive Sober No Regrets appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/08/30/abc-7-at-4-labor-day-drive-sober-no-regrets/feed/ 0 ]]>
El Paso County Commissioners approve $1 million contribution to advance Downtown Deck Plaza project https://kvia.com/news/el-paso/2024/08/28/el-paso-county-commissioners-approve-1-million-contribution-to-advance-downtown-deck-plaza-project/ https://kvia.com/news/el-paso/2024/08/28/el-paso-county-commissioners-approve-1-million-contribution-to-advance-downtown-deck-plaza-project/#respond Wed, 28 Aug 2024 17:39:14 +0000 https://kvia.com/?p=1280026

EL PASO, Texas (KVIA) -- El Paso County Commissioners Court voted 3-1 Monday to contribute $1 million from the county, to go towards the proposed Downtown Deck Plaza. County Commissioner for Precinct 3 Iliana Holguin was the only member of the body to vote against the measure. Since 2018, the Paso del Norte Community Foundation

The post El Paso County Commissioners approve $1 million contribution to advance Downtown Deck Plaza project appeared first on KVIA.

]]>

EL PASO, Texas (KVIA) -- El Paso County Commissioners Court voted 3-1 Monday to contribute $1 million from the county, to go towards the proposed Downtown Deck Plaza.

County Commissioner for Precinct 3 Iliana Holguin was the only member of the body to vote against the measure.

Since 2018, the Paso del Norte Community Foundation has been seeking to build a unique deck plaza over Interstate-10 in Downtown El Paso.

The county said it was asked to put up the $1 million it agreed to contribute. Officials said the contribution would serve as half of a $2 million match required by a grant being sought by the project's stakeholders.

That grant, which was applied for by stakeholders in El Paso last year but not won, is being sought once again from the Reconnecting Communities program. If won, El Paso would receive an additional $5 million to go towards detailed designs for the proposed deck plaza.

It is unclear where the rest of the required match could come from at this point.

ABC-7 is working to gather more information from county officials, and other parties involved. We will update this article once we learn more.

The post El Paso County Commissioners approve $1 million contribution to advance Downtown Deck Plaza project appeared first on KVIA.

]]>
https://kvia.com/news/el-paso/2024/08/28/el-paso-county-commissioners-approve-1-million-contribution-to-advance-downtown-deck-plaza-project/feed/ 0 ]]>
Overturned semi-trailer cleared on I-10 east and westbound https://kvia.com/news/abc-7-alert-center/2024/08/27/overturned-semi-trailer-blocking-several-lanes-on-i-10-east-and-westbound/ https://kvia.com/news/abc-7-alert-center/2024/08/27/overturned-semi-trailer-blocking-several-lanes-on-i-10-east-and-westbound/#respond Tue, 27 Aug 2024 12:27:16 +0000 https://kvia.com/?p=1279239

Update: The scene is now clear. EL PASO, Texas (KVIA) -- An overturned semi-trailer is blocking east and westbound lanes on I-10 in Central El Paso. According to fire dispatch, the call of the crash came after 3:30 a.m. on Tuesday. It's happening between Paisano Dr. and Chelsea St. Fortunately, no injuries are being reported.

The post Overturned semi-trailer cleared on I-10 east and westbound appeared first on KVIA.

]]>

Update: The scene is now clear.


EL PASO, Texas (KVIA) -- An overturned semi-trailer is blocking east and westbound lanes on I-10 in Central El Paso.

According to fire dispatch, the call of the crash came after 3:30 a.m. on Tuesday.

It's happening between Paisano Dr. and Chelsea St.

Fortunately, no injuries are being reported.

Roads have been reduced to one lane in both directions, according to El Paso Police.

Crews are working to clear the semi-trailer from the interstate.

The post Overturned semi-trailer cleared on I-10 east and westbound appeared first on KVIA.

]]>
https://kvia.com/news/abc-7-alert-center/2024/08/27/overturned-semi-trailer-blocking-several-lanes-on-i-10-east-and-westbound/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of August 26 to 30 https://kvia.com/traffic/2024/08/26/road-closures-in-el-paso-county-las-cruces-for-the-week-of-august-26-to-30/ https://kvia.com/traffic/2024/08/26/road-closures-in-el-paso-county-las-cruces-for-the-week-of-august-26-to-30/#respond Mon, 26 Aug 2024 12:05:44 +0000 https://kvia.com/?p=1278684

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures August 26 to August 30. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information

The post Road closures in El Paso County, Las Cruces for the week of August 26 to 30 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures August 26 to August 30. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20)

Guardrail Repair Project

Monday, August 26

9 a.m. to 4 p.m.

  • Loop 375 eastbound between Cordova bridge and weight station right lane closed

Tuesday, August 27

9 a.m. to 4 p.m.

  • I-10 westbound between Paisano and US-54 right lane closure with a right lane closure at I-10 to US-54 connector

Wednesday, August 28

9 a.m. o 4 p.m.

  • CD lanes westbound between Sunland Park and Resler left and right lane closures at Resler exit

Thursday, August 29

9 a.m. to 4 p.m.

  • I-10 eastbound between Copia and Raynolds right lane closure with a complete off-ramp closure at Raynolds

Friday, August 30

9 a.m. to 4 p.m.

  • I-10 westbound between Sunland Park and Mesa right lane closed
  • I-10 westbound between Sunland Park and Mesa left lane closed

Crews will be working on guardrail.

Miscellaneous Concrete

Tuesday, August 27

9 a.m. to 4 p.m.

  • Loop 375 eastbound between Railroad and Alcan right lane closed

Wednesday, August 28

9 a.m. to 4 p.m.

  • US 54 northbound between Diana and Sun Valley left lane closed

Thursday, August 29

9 a.m. to 4 p.m.

  • Gateway South between Ellerthorpe and Fred Wilson left lane closed

Friday, August 30

9 a.m. to 4 p.m.

  • Woodrow Bean eastbound between Kenworthy and Girl Scout shoulder closed

Crews will be repairing concrete.

Flexible Pavement

Thursday, August 29

9 a.m. to 4 p.m.

  • FM 259 between SH-20 (Doniphan) and Strahan complete bridge closure

Crews will be repairing asphalt.

Spall Repair Project

Sunday, August 25 through Thursday, August 29

9 p.m. to 5 a.m. (Nightly)

  • I-10 westbound between McRae overpass and Cotton overpass alternate lane closures

Crews will be working on spall repairs.

North Mesa Street Rehabilitation Project

Monday, August 26 through Friday, August 30

9 a.m. to 4 p.m.

  • If Needed - Mesa (SH-20) northbound and southbound alternating lane closures Resler Drive to Remcon Circle

Crews will be working on finishing items, striping, and small concert work.

US-62 Rehabilitation Project

Sunday, August 25 through Friday, August 30

9 p.m. to 6 a.m. (Nightly)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures Hawkins Boulevard to Airway Boulevard

Monday, August 26 through Friday, August 30

9 a.m. to 4 p.m. (Daily)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures Hawkins Boulevard to Airway Boulevard

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential / business access locations may be temporarily shifted due to milling/paving activities.

North Mesa Street Lighting Improvement Project

Monday, August 26 through Friday, August 30

9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound alternating left lane closures Crossroads Drive to Doniphan Drive
  • Mesa (SH-20) northbound and southbound right lane closures I-10 to Crossroads Drive
  • Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Sunland Park Drive
  • Mesa (SH-20) northbound and southbound left lane closures Executive Center Boulevard to Festival Drive
  • Mesa (SH-20) northbound and southbound alternating left and right lane closures Mesita Drive/Sun Bowl Drive to Executive Center Boulevard
  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, installing new lighting poles, removing existing poles, electrical inspection, and Concrete sidewalk and landscape repairs.

Traffic Signal Improvements Project

Monday, August 26 through Friday, August 30

9 a.m. to 4 p.m.

  • Dyer (BUS-54) north and southbound right lane closures at the Tetons Drive intersection.
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection
  • If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn around closures at Martin Luther King Boulevard/Kenworthy Street intersection
  • If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn around closures at Sun Valley Drive intersection

Crews will be working on intersection improvements.

Mesa Street at Belvidere Street Improve Traffic Signals Project

Monday, August 26 through Friday, August 30

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures

Crews will be potholing and boring to line locate.

Delta/Alameda & Zaragoza/George Dieter Traffic Signal Improvement Project

Monday, August 26 through Friday, August 30

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be working on traffic signals.

Green Ribbon Project

Monday, August 26 through Friday, August 30

9 a.m. to 4 p.m.

  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed
  • Crews will be working on median improvements.

US-54 & State Line Project

Monday, August 26 through Friday August 30

7:00 a.m. to 4:00 p.m.

  • US-54 south- and northbound from State Line Road reduced to one lane

Crews will be working demolition and preparation of the new turnaround of side shoulders.

FY 25 Bridge Maintenance Design Project

Wednesday, August 28

9 a.m. to 4 p.m.

  • I-10 eastbound to US-54 Ramps E, D, and A at I-10 eastbound to US-54 northbound shoulder closure
  • US-54 northbound off-ramp at US 54 northbound on-ramp shoulder closure
  • Durazno, Rosa, Marr, Rad GT at I-110 northbound to I-10 eastbound shoulder closure
  • US-54 on-ramp (Ramp A) at I-10 westbound (Ramp L) shoulder closure

Thursday, August 29

9 a.m. to 4 p.m.

  • I-10 westbound at East Missouri shoulder closure
  • I-10 eastbound at Piedras alternate right and left lane closure

Crews will be performing condition assessments for certain structures in the west area boundary.

Maintenance

Monday, August 26 through Friday, August 30

9 a.m. to 3 p.m.

  • Spur 601 westbound between Chaffee and Loop 375 shoulder closed

Crews will be working on shoulder.

  • Loop 375 westbound (Border West) between Spur 1966 and Executive right lane closed

Crews will be working on retaining wall.

I-10 Widening West

Monday, August 26, through Friday, August 30
9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed.

Crews will be working on retaining walls.

Monday, August 26
9 p.m. to 4 a.m.

  • Loop 375 (Transmountain Road) will be closed between North Desert Boulevard.
  • EASTBOUND DETOUR: South Desert Boulevard to Artcraft to North Desert Boulevard.
  • WESTBOUND DETOUR: North Desert Boulevard to Vinton Road to South Desert Boulevard.

Crews will be cleaning bridge joints.

Tuesday, August 27
9 p.m. to 4 a.m.

  • Eastbound I-10 will be reduced to one lane at Redd Road.
  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard.
  • All traffic on South Desert must turn right on Redd Road.
  • All traffic on Redd Road must turn right on South Desert.

Crews will be placing bridge beams.

Wednesday, August 28
9 p.m. to 4 a.m.

  • Westbound I-10 will be reduced to one lane at Redd Road.
  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard.
  • All traffic on North Desert must turn right on Redd Road.
  • All traffic on Redd Road must turn right on North Desert.

Crews will be placing bridge beams.

Thursday, August 29
9 p.m. to 4 a.m.

  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard
  • EASTBOUND REDD DETOUR: South Desert to Mesa Street Turnaround to North Desert.
  • WESTBOUND REDD DETOUR: North Desert to Artcraft to South Desert.

Crews will be placing bridge deck panels.

Tuesday, September 3, through Saturday, September 7
9 p.m. to 4 a.m.

  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard
  • EASTBOUND REDD DETOUR: South Desert to Mesa Street Turnaround to North Desert.
  • WESTBOUND REDD DETOUR: North Desert to Artcraft to South Desert.

Crews will be placing the bridge deck.

Upcoming high-impact closures

48-hour closures of I-10 East and West are scheduled between North Mesa Street and Redd Road on the weekends of September 6 and 13. Crews will relocate concrete barriers and restripe the mainlanes to give crews more room to work in the median of the freeway. I-10 will be re-open with two lanes in both directions following the closures.

Loop 375 Widening Project

Monday, August 26

Nightly, 9:00 p.m. to 3:00 a.m.

  • Americas Highway (Loop 375) northbound main lane closure between Zaragoza (POE) and North Loop Overpass.

Crews will be working on moving concrete barrier.

Tuesday, August 27 and Wednesday, August 28

Nightly, 9:00 p.m. to 3:00 a.m.

  • Americas Highway (Loop 375) southbound main lane closure between Zaragoza (POE) and North Loop Overpass.

Crews will be working on moving concrete barrier.

Monday, August 26, through Thursday, August 29

Nightly, 9:00 p.m. to 5:00 a.m.

  • Americas Avenue (frontage road) North Loop Road Underpass complete intersection closure.

Crews will be working on installing concrete rip rap, bridge structures and cleaning of underpass.

Continuous closure, from present through 5:00 am Tuesday, August 26

  • Americas Highway (Loop 375) Zaragoza Exit Ramp southbound closed.
  • Americas Avenue (frontage road) northbound right lane closure between Joe Rodriguez Road and South Side.

Crews will be installing concrete paving, performing bridge joint repairs and securing roadway until required asphalt repair work is complete and drainage utilities are installed.

SH 20 Raised Medians Project

Sunday, August 25

Overnight 9 p.m. to 6 a.m.

  • Alameda Avenue (SH-20) east and westbound inside lane closures between Settler Road and Oden Road

Crews will be installing concrete medians.

Monday, August 26 to Friday, August 30

Daily, 9 a.m. to 4 p.m.

  • Alameda Avenue (SH-20) east and westbound inside lane closures between Rio Vista Road and Passmore Road

Crews will be installing concrete medians and finishing installing electrical conduits.

SL 375 Mill and Inlay Project

Sunday, August 25 to Thursday, August 29

Nightly, 7:30 p.m. to 6 a.m.

  • Joe Battle Boulevard northbound alternating lane closures between Pellicano Drive and Edgemere Boulevard
  • Company E Highway (Loop 375) exit and entrance ramps will be closed between Pellicano Drive and Edgemere Boulevard

Crews will be performing milling operations, pouring concrete, base repairs and placing hot mix asphalt.

The post Road closures in El Paso County, Las Cruces for the week of August 26 to 30 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/08/26/road-closures-in-el-paso-county-las-cruces-for-the-week-of-august-26-to-30/feed/ 0 ]]>
Socorro Police respond to crash, all lanes open https://kvia.com/news/abc-7-alert-center/2024/08/25/socorro-police-respond-to-crash-ask-drivers-to-use-alternate-routes/ https://kvia.com/news/abc-7-alert-center/2024/08/25/socorro-police-respond-to-crash-ask-drivers-to-use-alternate-routes/#respond Sun, 25 Aug 2024 19:15:58 +0000 https://kvia.com/?p=1278469

UPDATE: First responders and police have cleared the crash at Passmore and Alameda. All lanes are now open. EL PASO, Texas (KVIA) - The City of Socorro is asking drivers to be cautious and use alternative routes after a multi-vehicle crash at Passmore and Alameda in the Lower Valley. Police responded to the crash and

The post Socorro Police respond to crash, all lanes open appeared first on KVIA.

]]>

UPDATE: First responders and police have cleared the crash at Passmore and Alameda. All lanes are now open.

EL PASO, Texas (KVIA) - The City of Socorro is asking drivers to be cautious and use alternative routes after a multi-vehicle crash at Passmore and Alameda in the Lower Valley.

Police responded to the crash and say the east bound lane is currently open, but suggest driver use Jesus Barrera, Vineyard, and Socorro Road to avoid the congestion.

No word yet on any injuries.

The post Socorro Police respond to crash, all lanes open appeared first on KVIA.

]]>
https://kvia.com/news/abc-7-alert-center/2024/08/25/socorro-police-respond-to-crash-ask-drivers-to-use-alternate-routes/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of August 19 to 23 https://kvia.com/traffic/2024/08/19/road-closures-in-el-paso-county-las-cruces-for-the-week-of-august-19-to-23/ https://kvia.com/traffic/2024/08/19/road-closures-in-el-paso-county-las-cruces-for-the-week-of-august-19-to-23/#respond Mon, 19 Aug 2024 10:25:49 +0000 https://kvia.com/?p=1275580

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures August 19 to August 23. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information

The post Road closures in El Paso County, Las Cruces for the week of August 19 to 23 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures August 19 to August 23. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

WEST AREA OFFICE PROJECTS

I-10 Widening West

Beginning Sunday, August 18 at 1pm, and continuing until further notice

  • North Desert Boulevard will be closed at Enchanted Hills Drive.

NOTE: All traffic on North Desert Boulevard must turn right on Enchanted Hills.

DETOUR: Enter I-10 West past Transmountain Road.

Monday, August 19, through Saturday August 24

9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed.

Crews will be working on retaining walls.

Tuesday, August 20

9 a.m. to 4 p.m.

  • The right lane on Loop 375 West (Transmountain Road) will be closed at North Desert Boulevard.
  • One left turn lane will be closed on South Desert Boulevard at Transmountain.

Crews will be repairing a crash cushion.

The following closures and detours will continue until further notice:

  • The westbound mainlanes of I-10 are detoured onto North Desert Boulevard at Los Mochis Drive.
  • The eastbound mainlanes of I-10 are detoured onto South Desert Boulevard at Los Mochis Drive.
  • South Desert Boulevard is closed to all traffic south of Spur 37 (Vinton Road).
  • Thorn Avenue is closed to all traffic between North Desert Boulevard and South Desert Boulevard.
  • Alternating daytime lane closures are possible on North Desert Boulevard and South Desert Boulevard between Redd Road and Vinton Road.
  • Alternating daytime lane closures are possible on Redd Road between North Desert Boulevard and South Desert Boulevard.
  • Both turnarounds at Redd Road are closed.

Montana Mill & Inlay

Sunday, August 18 through Friday, August 23

9 p.m. to 6 a.m. (Nightly)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures Hawkins Boulevard to Airway Boulevard

Monday, August 19 through Friday, August 23

9 a.m. to 4 p.m. (Daily)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures Hawkins Boulevard to Airway Boulevard

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential / business access locations may be temporarily shifted due to milling/paving activities.

North Mesa Street Mill & Inlay

Monday, August 19 through Friday, August 23

9 a.m. to 4 p.m.

  • If Needed - Mesa (SH-20) northbound and southbound alternating lane closures Resler Drive to Remcon Circle

Crews will be working on finishing items, striping, and concrete work.

North Mesa Street Illumination Project

Monday, August 19 through Friday, August 23

9 a.m. to 4 p.m.

  • If Needed – Mesa north- and southbound right lane closures I-10 to Crossroads Drive
  • Mobile/Moving Traffic Operation –Mesa north- and southbound alternating left and right lane closures I-10 to Doniphan Drive
  • North-and southbound right lane closures Festival Drive to Sunland Park Drive
  • North- and southbound left lane closures Executive Center Boulevard to Festival Drive
  • North- and southbound alternating left and right lane closures Mesita Drive/Sun Bowl Drive to Executive Center Boulevard
  • North- and southbound left lane closures Glory Road/East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, installing new lighting poles, removing existing poles, electrical inspection, and Concrete sidewalk and landscape repairs.

Traffic Signal Improvement Project

Monday, August 19 through Friday, August 23

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures along with left turn lane closures at the Camille Drive intersection.
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection
  • If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn around closures at Martin Luther King Boulevard/Kenworthy Street intersection

Crews will be working on intersection improvements.

Monday, August 19 through Friday, August 24

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures

Crews will be potholing and boring to line locate.

Monday, August 19 through Friday, August 24

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be working on traffic signals.

Guardrail Repair

Monday, August 19

9 a.m. to 4 p.m.

  • Loop 375 eastbound between Main Gap and US 54 right lane closed

Tuesday, August 20

9 a.m. to 4 p.m.

  • US-54 northbound between Altura and Pershing right lane closed

Wednesday, August 21

9 a.m. o 4 p.m.

  • I-10 eastbound between Resler and Mesa Park right lane closed

Thursday, August 22

9 a.m. to 4 p.m.

  • US-54 northbound between Hondo Pass and Sun Valley right lane closed

Friday, August 23

9 a.m. to 4 p.m.

  • I-10 westbound between Geronimo and Paisano right lane and on-ramp at Geronimo and complete off-ramp at Paisano closed

Spall Repair

Sunday, August 18 through Thursday, August 22

9 p.m. to 5 a.m. (Nightly)

  • I-10 westbound between McRae and Cotton alternate lane closures

Crews will be repairing spall.

Maintenance

Monday, August 19 through Friday, August 24

9 a.m. to 3 p.m.

  • Spur 601 westbound between Chaffee and Loop 375 shoulder closed

Crews will be working on shoulder.

Green Ribbon Project

Monday, August 19 through Friday, August 24

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be working on median improvements.

EAST AREA OFFICE PROJECTS

Montana Widening Project

Monday, August 19 to Wednesday, August 21

Nightly, 9 p.m. to 5 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road complete closure from George Dieter Drive to Lee Boulevard

Crews will be working on removing concrete barrier to open the eastbound frontage road.

Purple Heart Widening Project

Tuesday, August 20

Daily, 8 a.m. to 3:30 p.m.

  • Purple Heart Highway (Loop 375) southbound right lane closure from Iron Medics to Montana Avenue

Crews will be installing bridge girders.

Wednesday, August 21

Daily, 9 a.m. to 4 p.m.

  • Purple Heart Highway (Loop 375) northbound right lane closure from Montana Avenue to Iron Medics

Crews will be installing bridge girders.

Thursday, August 22

Nightly, 9 p.m. to 5 a.m.

  • Purple Heart Highway (Loop 375) northbound main lane closure from Montana Avenue to Spur 601
  • Purple Heart Highway (Loop 375) northbound entrance ramp at Montana Avenue will be closed.

Traffic heading northbound will have to use Montana Avenue to Global Reach to continue onto SL 375.

Crews will be installing bridge girders.

Saturday, August 24

Daily, 3 a.m. to 7 p.m.

  • Purple Heart Highway (Loop 375) north- and southbound main lane closure from Montana Avenue to Spur 601
  • Purple Heart Highway (Loop 375) entrance ramps at Montana Avenue northbound and Spur 601 southbound will be closed.

Crews will be installing bridge girders.

Continuous closure until further notice

  • Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601

Crews will be widening main lanes and constructing north and southbound frontage road.

Loop 375 Widening Project

Monday August 19 to Thursday August 22

Nightly 9 p.m. until 5 a.m.

·        Loop 375 northbound main lane closure between Zaragoza and North Loop

·        Americas Avenue (frontage road) North Loop Road Underpass full intersection closure

Crews will be working on moving concrete barrier and installing bridge structures. 

Monday August 19, to Friday August 23

Daily 9 a.m. until 4 p.m.

  • Joe Battle Boulevard (frontage road) northbound left lane closure between Pine Springs Drive and Paseo Del Este Boulevard

·        Americas Highway (Loop 375) northbound main lane shoulders only closure between Pine Springs Drive and Paseo Del Este Boulevard

·        North Loop underpass north and southbound turnaround will be completed closed.

Crews will be working on installing concrete rip rap, bridge structures and cleaning of underpass.

Continuous closure, from present through 5:00 am Tuesday, August 26

·        Americas Highway (Loop 375) Zaragoza Exit Ramp southbound closed

·        Americas Avenue (frontage road) northbound right lane closure between Joe Rodriguez Road and South Side 

Crews will be installing concrete paving, performing bridge joint repairs and securing roadway until required asphalt repair work is complete and drainage utilities are installed.

Horizon/Darrington Reconstruction Project

Monday August 19, to Friday August 23

9 a.m. to 4 p.m.

  • Horizon Boulevard (FM1281) east and westbound right lane closure at Darrington Road intersection
  • Darrington Road north and southbound right lane closure at Horizon Boulevard (FM1281) intersection

Crews will be drilling holes for traffic signals.

Continuous closures

Monday, March 25 until further notice

  • Horizon Boulevard (FM1281) westbound lane closure from Torrey Pines to Desert Mesa Drive, lanes reduced to one lane
  • Horizon Boulevard (FM1281) hike/bike trail from Torrey Pines to Desert Mesa Drive will be closed indefinitely.

Friday, June 28 until further notice

  • Horizon Boulevard (FM 1281) westbound lane from Desert Mesa to Rodman Street will be shifted to the median and transitioned back on Rodman Street
  • Horizon Boulevard (FM 1281) and Lago Del Esta intersection closure

Crews will be working on final subgrade, pavement operations and excavating ponding areas.

Alameda Raised Medians Project

Sunday, August 18

Overnight 9 p.m. to 6 a.m.

  • Alameda Avenue (SH-20) east and westbound inside lane closures between Settler Road and Oden Road

Crews will be installing concrete medians.

Monday, August 19 to Friday, August 23

Daily 9 a.m. to 4 p.m.

  • Alameda Avenue (SH-20) east and westbound inside lane closures between Rio Vista Road and Passmore Road

Crews will be installing concrete medians and finishing installing electrical conduits.

Joe Battle/Company E Mill and Inlay Project

Sunday, August 18 to Thursday, August 22

Nightly, 7:30 p.m. to 6 a.m.

  • Joe Battle Boulevard northbound alternating lane closures between Pellicano Drive and Edgemere Boulevard
  • Company E Highway (Loop 375) exit and entrance ramps will be closed between Pellicano Drive and Edgemere Boulevard

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

Darrington Road Safety Lighting Project

Monday, July 29 to Friday, September 27

Daily, from 9 a.m. to 4 p.m.

  • Darrington Road north and southbound alternating right lane closure between Alberton Street and LTV Road

Crews will be installing conduit, drilling light pole foundation, pulling wire, and setting light poles.

The post Road closures in El Paso County, Las Cruces for the week of August 19 to 23 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/08/19/road-closures-in-el-paso-county-las-cruces-for-the-week-of-august-19-to-23/feed/ 0 ]]>
I-10 East closed following three-vehicle crash; one person in the hospital with serious injuries https://kvia.com/app-alert/2024/08/18/i-10-east-closed-following-three-vehicle-crash-one-person-in-the-hospital-with-serious-injuries/ https://kvia.com/app-alert/2024/08/18/i-10-east-closed-following-three-vehicle-crash-one-person-in-the-hospital-with-serious-injuries/#respond Sun, 18 Aug 2024 13:29:44 +0000 https://kvia.com/?p=1275318

EL PASO, Texas (KVIA) -- I-10 East at Piedras is closed following a three-vehicle crash that sent one person to the hospital with serious injuries. El Paso Police says Special Traffic Investigators are investigating the crash. Police say the call came in at 2:26 a.m. Police also said a second crash also happened at the

The post I-10 East closed following three-vehicle crash; one person in the hospital with serious injuries appeared first on KVIA.

]]>

EL PASO, Texas (KVIA) -- I-10 East at Piedras is closed following a three-vehicle crash that sent one person to the hospital with serious injuries.

El Paso Police says Special Traffic Investigators are investigating the crash.

Police say the call came in at 2:26 a.m.

Police also said a second crash also happened at the scene, involving an unoccupied police car that was helping with traffic control. No injuries were reported from that crash.

Traffic is currently exiting on the Dallas exit.

This is a developing story and we will update you as we learn more information.

The post I-10 East closed following three-vehicle crash; one person in the hospital with serious injuries appeared first on KVIA.

]]>
https://kvia.com/app-alert/2024/08/18/i-10-east-closed-following-three-vehicle-crash-one-person-in-the-hospital-with-serious-injuries/feed/ 0 ]]>
ABC-7 at 4: School Zone Safety, and closures of I-10 West https://kvia.com/traffic/2024/08/16/abc-7-at-4-school-zone-safety-and-closures-of-i-10-west/ https://kvia.com/traffic/2024/08/16/abc-7-at-4-school-zone-safety-and-closures-of-i-10-west/#respond Fri, 16 Aug 2024 21:32:53 +0000 https://kvia.com/?p=1274878

El Paso, TX (KVIA-TV)-With children walking to school, dashing between cars, or hopping in and out of buses while parents in cars drop kids off. Last week on ABC-7 at 4 we offered tips for drivers, and this week, TXDot’s Jennifer Wright is here with tips you can share with your school-age children. Plus, everything

The post ABC-7 at 4: School Zone Safety, and closures of I-10 West appeared first on KVIA.

]]>
2_N Desert Closure 081824 until further
1_I-10 WB 40 Hour Closure 081624-081824

El Paso, TX (KVIA-TV)-With children walking to school, dashing between cars, or hopping in and out of buses while parents in cars drop kids off. Last week on ABC-7 at 4 we offered tips for drivers, and this week, TXDot’s Jennifer Wright is here with tips you can share with your school-age children. Plus, everything you need to know about the 40 hour closure in 1-10 west.

Here's the list of closures: (Courtesty of TX DOT El Paso)

I-10 Widening West has it’s 40-hour closure of I-10 West, and it’s convoluted in that at 9PM Friday, it closes at the end of the current detour by Los Mochis, and at 4AM Saturday the point of closure moves back to Artcraft. This is so we can open two lanes on I-10 until that detour. BUT, because the two-lane frontage road cannot merge into the two-lane main lanes, we have to revert to closing North Desert at Enchanted Hills until further notice. That closure will begin at 1PM Monday, August 19. There is an on-ramp just after Transmountain that you will need to use to get on I-10, else you will have missed the boat there and will enter the circle of doom through the neighborhood. Please pay attention so you don’t hassle the ‘hood. North Desert will be strictly for Enchanted Hills only. Maps attached.

Montana Mill & Inlay moves to the area from Hawkins to Airway next week. Mesa Mill & Inlay is still working on punch list items. The Mesa Illumination project has so far placed 130 of the 30’ poles, and 37 of the 40’ light poles along Mesa from Doniphan to Glory Road. Once all energized, no more dark driving along Mesa. Sweet. See below to find out where they’re working next week.

Here’s a quick rundown of the east side widening projects for you:

  • Montana Widening will have a complete closure of the eastbound frontage road Monday through Wednesday nights next week to remove barrier to completely open the eastbound frontage road. It’s a welcome event.
  • Purple Heart Widening will have daily lane closures, and Thursday night the northbound lanes will be closed at Montana from 9PM - 5AM, with the detour being Montana to Global Reach. Saturday, 8/24 from 3AM to 7PM the whole shebang, north-and southbound lanes will be closed so crews can place bridge girders.
  • Loop 375 Widening will have a northbound main lane closure from Zaragoza to North Loop, along with the North Loop underpass Monday through Thursday overnight starting at 9.

EP Water has closures on Montana by Bassett Center, Mesa Street downtown, and Gateway West by Yarbrough which they have shared with me and I include waaaay below. Check them out if they might affect you.

Happy Friday Eve. We are halfway through the month that ends the fiscal year, in case those of you on this calendar needed an extra jolt of anxiety.

Cheers.  

EMERGENCY NOTIFICATION

Spall Repair Project

Thursday, August 15

9 p.m. to 5 a.m. (Night)

  • I-10 westbound at Geronimo Exit three left lanes closed.

Crews will be repairing spall.

WEST AREA OFFICE PROJECTS

I-10 Widening West

40 Hour Closure

Friday, August 16 at 9pm, to Sunday, August 18 at 1pm

  • I-10 West will be closed at Vinton Road.

DETOUR: Continue on North Desert Boulevard, and re-enter I-10 past Vinton.

  • Beginning at 4am on Saturday, the closure will extend to Artcraft.

DETOUR: Take Exit 8 (SH 178/Artcraft Road), continue on North Desert Boulevard, and re-enter I-10 past Vinton.

Crews will be placing permanent concrete barriers and reopening I-10 West to two lanes.

Beginning Sunday, August 18 at 1pm, and continuing until further notice

  • North Desert Boulevard will be closed at Enchanted Hills Drive.

NOTE: All traffic on North Desert Boulevard must turn right on Enchanted Hills.

DETOUR: Enter I-10 West past Transmountain Road.

Monday, August 19, through Saturday August 24

9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed.

Crews will be working on retaining walls.

Tuesday, August 20

9 a.m. to 4 p.m.

  • The right lane on Loop 375 West (Transmountain Road) will be closed at North Desert Boulevard.
  • One left turn lane will be closed on South Desert Boulevard at Transmountain.

Crews will be repairing a crash cushion.

The following closures and detours will continue until further notice:

  • The westbound mainlanes of I-10 are detoured onto North Desert Boulevard at Los Mochis Drive.
  • The eastbound mainlanes of I-10 are detoured onto South Desert Boulevard at Los Mochis Drive.
  • South Desert Boulevard is closed to all traffic south of Spur 37 (Vinton Road).
  • Thorn Avenue is closed to all traffic between North Desert Boulevard and South Desert Boulevard.
  • Alternating daytime lane closures are possible on North Desert Boulevard and South Desert Boulevard between Redd Road and Vinton Road.
  • Alternating daytime lane closures are possible on Redd Road between North Desert Boulevard and South Desert Boulevard.
  • Both turnarounds at Redd Road are closed.

Montana Mill & Inlay

Sunday, August 18 through Friday, August 23

9 p.m. to 6 a.m. (Nightly)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures Hawkins Boulevard to Airway Boulevard

Monday, August 19 through Friday, August 23

9 a.m. to 4 p.m. (Daily)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures Hawkins Boulevard to Airway Boulevard

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential / business access locations may be temporarily shifted due to milling/paving activities.

North Mesa Street Mill & Inlay

Monday, August 19 through Friday, August 23

9 a.m. to 4 p.m.

  • If Needed - Mesa (SH-20) northbound and southbound alternating lane closures Resler Drive to Remcon Circle

Crews will be working on finishing items, striping, and concrete work.

North Mesa Street Illumination Project

Monday, August 19 through Friday, August 23

9 a.m. to 4 p.m.

  • If Needed – Mesa north- and southbound right lane closures I-10 to Crossroads Drive
  • Mobile/Moving Traffic Operation –Mesa north- and southbound alternating left and right lane closures I-10 to Doniphan Drive
  • North-and southbound right lane closures Festival Drive to Sunland Park Drive
  • North- and southbound left lane closures Executive Center Boulevard to Festival Drive
  • North- and southbound alternating left and right lane closures Mesita Drive/Sun Bowl Drive to Executive Center Boulevard
  • North- and southbound left lane closures Glory Road/East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, installing new lighting poles, removing existing poles, electrical inspection, and Concrete sidewalk and landscape repairs.

Traffic Signal Improvement Project

Monday, August 19 through Friday, August 23

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures along with left turn lane closures at the Camille Drive intersection.
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection
  • If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn around closures at Martin Luther King Boulevard/Kenworthy Street intersection

Crews will be working on intersection improvements.

Monday, August 19 through Friday, August 24

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures

Crews will be potholing and boring to line locate.

Monday, August 19 through Friday, August 24

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be working on traffic signals.

Guardrail Repair

Monday, August 19

9 a.m. to 4 p.m.

  • Loop 375 eastbound between Main Gap and US 54 right lane closed

Tuesday, August 20

9 a.m. to 4 p.m.

  • US-54 northbound between Altura and Pershing right lane closed

Wednesday, August 21

9 a.m. o 4 p.m.

  • I-10 eastbound between Resler and Mesa Park right lane closed

Thursday, August 22

9 a.m. to 4 p.m.

  • US-54 northbound between Hondo Pass and Sun Valley right lane closed

Friday, August 23

9 a.m. to 4 p.m.

  • I-10 westbound between Geronimo and Paisano right lane and on-ramp at Geronimo and complete off-ramp at Paisano closed

Spall Repair

Sunday, August 18 through Thursday, August 22

9 p.m. to 5 a.m. (Nightly)

  • I-10 westbound between McRae and Cotton alternate lane closures

Crews will be repairing spall.

Maintenance

Monday, August 19 through Friday, August 24

9 a.m. to 3 p.m.

  • Spur 601 westbound between Chaffee and Loop 375 shoulder closed

Crews will be working on shoulder.

Green Ribbon Project

Monday, August 19 through Friday, August 24

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be working on median improvements.

EAST AREA OFFICE PROJECTS

Montana Widening Project

Monday, August 19 to Wednesday, August 21

Nightly, 9 p.m. to 5 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road complete closure from George Dieter Drive to Lee Boulevard

Crews will be working on removing concrete barrier to open the eastbound frontage road.

Purple Heart Widening Project

Tuesday, August 20

Daily, 8 a.m. to 3:30 p.m.

  • Purple Heart Highway (Loop 375) southbound right lane closure from Iron Medics to Montana Avenue

Crews will be installing bridge girders.

Wednesday, August 21

Daily, 9 a.m. to 4 p.m.

  • Purple Heart Highway (Loop 375) northbound right lane closure from Montana Avenue to Iron Medics

Crews will be installing bridge girders.

Thursday, August 22

Nightly, 9 p.m. to 5 a.m.

  • Purple Heart Highway (Loop 375) northbound main lane closure from Montana Avenue to Spur 601
  • Purple Heart Highway (Loop 375) northbound entrance ramp at Montana Avenue will be closed.

Traffic heading northbound will have to use Montana Avenue to Global Reach to continue onto SL 375.

Crews will be installing bridge girders.

Saturday, August 24

Daily, 3 a.m. to 7 p.m.

  • Purple Heart Highway (Loop 375) north- and southbound main lane closure from Montana Avenue to Spur 601
  • Purple Heart Highway (Loop 375) entrance ramps at Montana Avenue northbound and Spur 601 southbound will be closed.

Crews will be installing bridge girders.

Continuous closure until further notice

  • Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601

Crews will be widening main lanes and constructing north and southbound frontage road.

Loop 375 Widening Project

Monday August 19 to Thursday August 22

Nightly 9 p.m. until 5 a.m.

·        Loop 375 northbound main lane closure between Zaragoza and North Loop

·        Americas Avenue (frontage road) North Loop Road Underpass full intersection closure

Crews will be working on moving concrete barrier and installing bridge structures. 

Monday August 19, to Friday August 23

Daily 9 a.m. until 4 p.m.

  • Joe Battle Boulevard (frontage road) northbound left lane closure between Pine Springs Drive and Paseo Del Este Boulevard

·        Americas Highway (Loop 375) northbound main lane shoulders only closure between Pine Springs Drive and Paseo Del Este Boulevard

·        North Loop underpass north and southbound turnaround will be completed closed.

Crews will be working on installing concrete rip rap, bridge structures and cleaning of underpass.

Continuous closure, from present through 5:00 am Tuesday, August 26

·        Americas Highway (Loop 375) Zaragoza Exit Ramp southbound closed

·        Americas Avenue (frontage road) northbound right lane closure between Joe Rodriguez Road and South Side 

Crews will be installing concrete paving, performing bridge joint repairs and securing roadway until required asphalt repair work is complete and drainage utilities are installed.

Horizon/Darrington Reconstruction Project

Monday August 19, to Friday August 23

9 a.m. to 4 p.m.

  • Horizon Boulevard (FM1281) east and westbound right lane closure at Darrington Road intersection
  • Darrington Road north and southbound right lane closure at Horizon Boulevard (FM1281) intersection

Crews will be drilling holes for traffic signals.

Continuous closures

Monday, March 25 until further notice

  • Horizon Boulevard (FM1281) westbound lane closure from Torrey Pines to Desert Mesa Drive, lanes reduced to one lane
  • Horizon Boulevard (FM1281) hike/bike trail from Torrey Pines to Desert Mesa Drive will be closed indefinitely.

Friday, June 28 until further notice

  • Horizon Boulevard (FM 1281) westbound lane from Desert Mesa to Rodman Street will be shifted to the median and transitioned back on Rodman Street
  • Horizon Boulevard (FM 1281) and Lago Del Esta intersection closure

Crews will be working on final subgrade, pavement operations and excavating ponding areas.

Alameda Raised Medians Project

Sunday, August 18

Overnight 9 p.m. to 6 a.m.

  • Alameda Avenue (SH-20) east and westbound inside lane closures between Settler Road and Oden Road

Crews will be installing concrete medians.

Monday, August 19 to Friday, August 23

Daily 9 a.m. to 4 p.m.

  • Alameda Avenue (SH-20) east and westbound inside lane closures between Rio Vista Road and Passmore Road

Crews will be installing concrete medians and finishing installing electrical conduits.

Joe Battle/Company E Mill and Inlay Project

Sunday, August 18 to Thursday, August 22

Nightly, 7:30 p.m. to 6 a.m.

  • Joe Battle Boulevard northbound alternating lane closures between Pellicano Drive and Edgemere Boulevard
  • Company E Highway (Loop 375) exit and entrance ramps will be closed between Pellicano Drive and Edgemere Boulevard

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

Darrington Road Safety Lighting Project

Monday, July 29 to Friday, September 27

Daily, from 9 a.m. to 4 p.m.

  • Darrington Road north and southbound alternating right lane closure between Alberton Street and LTV Road

Crews will be installing conduit, drilling light pole foundation, pulling wire, and setting light poles.

CONTINUOUS CLOSURES

Median Concrete Barrier Project

Continuous closure until further notice

  • Montana Avenue (US 62/180) east and westbound complete left lane closure between RM 124 and RM 126 (Guadalupe Peak)
  • Traffic will be reduced to one lane in work areas.

Closure is necessary for installation of median concrete barrier.

RM 652 Full Depth Rehabilitation Project

Continuous closure until further notice

  • RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line
  • Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.

Closure is necessary for the construction of new roadway consisting of full depth rehabilitation.

RM 652 Full Widening Project

Monday, March 11 until further notice

  • RM 652 westbound lanes reduces to one lane two-way traffic from FM 3541 to Kimble Draw Bridge

Closure is necessary for the reconstruction of the roadway.

EP WATER CLOSURES

Montana Avenue Cured-in-place Pipeline Project

24/7 until further notice

  • US 62/180 West (Montana Avenue) reduced to one lane between Airport Road and Paisano Drive.
  • Magruder Street, Geronimo Drive, and Airport Road are open at Montana.
  • All other median crossovers between Paisano and Airport are closed.

Crews are preparing to rehabilitate a 12-inch waterline.

Gateway Boulevard West and Yarbrough Drive Wastewater Improvements

24/7 until further notice

  • Gateway Boulevard West is reduced to two lanes between Vista de Oro Drive and North Yarbrough Drive.

Crews are replacing a wastewater main with a new PVC line.

Phase 2 - Mesa Street Stormwater Replacement

24/7 until further notice

  • SH 20 (Mesa Street) is closed between Main Street and Texas Avenue.
  • Mills Avenue is closed between Oregon Street and Stanton Street.

Crews are replacing stormwater infrastructure and fire hydrants.

Please follow the detour signs in place on all projects.  All work is dependent upon weather conditions.

The post ABC-7 at 4: School Zone Safety, and closures of I-10 West appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/08/16/abc-7-at-4-school-zone-safety-and-closures-of-i-10-west/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of August 12 to 16 https://kvia.com/traffic/2024/08/12/road-closures-in-el-paso-county-las-cruces-for-the-week-of-august-12-to-16/ https://kvia.com/traffic/2024/08/12/road-closures-in-el-paso-county-las-cruces-for-the-week-of-august-12-to-16/#respond Mon, 12 Aug 2024 10:42:39 +0000 https://kvia.com/?p=1272583

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures August 12 to 16. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click

The post Road closures in El Paso County, Las Cruces for the week of August 12 to 16 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures August 12 to 16. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

WEST AREA OFFICE PROJECTS

I-10 Widening West Project:

Monday, August 12, through Saturday, August 17

9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Transmountain Road and Vinton.

NOTE: Eastbound lane closure will not take place on Wednesday, August 14.

Crews will be working on retaining walls.

Monday, August 12

9 a.m. to 4 p.m.

  • I-10 East will be reduced to one lane between Redd Road and North Mesa Street

Crews will be removing wooden forms.

Monday, August 12 and Tuesday, August 13

9 p.m. to 5 a.m.

  • I-10 East will be closed between Redd Road and North Mesa Street

DETOUR: Take Exit 9 (Redd Road), continue on South Desert, re-enter I-10 past Mesa Street.

Crews will be removing wooden forms.

Wednesday, August 14

9 a.m. to 4 p.m.

  • Onramp to I-10 East at Vinton will be closed.

DETOUR: Take SH 20 South (Doniphan Drive), turn right on Talbot Avenue, turn left on Spur 16, turn right on South Desert Boulevard.

  • Turnaround from North Desert Boulevard to South Desert Boulevard at Vinton will be closed.
  • I-10 East will be reduced to one lane south of Vinton Road

Crews will be replacing a damaged guard rail.

Wednesday, August 14

9 p.m. to 5 a.m.

  • South Desert Boulevard will be closed at Redd Road.

DETOUR: Traffic must turn right on Redd Road.

  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard.

DETOUR: Traffic must turn right on South Desert Boulevard.

Crews will be placing bridge beams.

Thursday, August 15

9 p.m. to 5 a.m.

  • North Desert Boulevard will be closed at Redd Road.

DETOUR: Traffic must turn right on Redd Road.

  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard

DETOUR: Traffic must turn right on North Desert Boulevard.

Crews will be placing bridge beams.

40 Hour Closure

Friday, August 16 at 9pm, to Sunday, August 18 at 1pm

  • I-10 West will be closed at Vinton Road.

DETOUR: Continue on North Desert Boulevard, and re-enter I-10 past Vinton.

  • Beginning at 4am on Saturday, the closure will extend to Artcraft.

DETOUR: Take Exit 8 (SH 178/Artcraft Road), continue on North Desert Boulevard, and re-enter I-10 past Vinton.

Crews will be placing permanent concrete barriers and reopening I-10 West to two lanes.

Advance warning

Monday, August 19, through Wednesday August 21

9 p.m. to 5 a.m.

  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard

EASTBOUND DETOUR: Turn right on South Desert, use the turnaround at Mesa Street to North Desert, turn right on Redd Road.

WESTBOUND DETOUR: Turn right on North Desert, turn left on Artcraft Road, turn left on South Desert, turn right on Redd Road.

Crews will be placing bridge deck panels.

The following closures and detours will continue until further notice:

  • The westbound mainlanes of I-10 are detoured onto North Desert Boulevard at Los Mochis Drive.
  • The eastbound mainlanes of I-10 are detoured onto South Desert Boulevard at Los Mochis Drive.
  • South Desert Boulevard is closed to all traffic south of Spur 37 (Vinton Road).
  • Thorn Avenue is closed to all traffic between North Desert Boulevard and South Desert Boulevard.
  • Both turnarounds at Redd Road are closed.
  • Alternating daytime lane closures are possible on North Desert Boulevard and South Desert Boulevard between Redd Road and Vinton Road.

North Mesa Street Rehabilitation Project

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • If Needed - Mesa (SH-20) northbound and southbound alternating lane closures Resler Drive to Remcon Circle

Crews will be working on finishing items, striping, and small concert work.

Montana (US-62) Mill & Inlay Project

Sunday, August 11 through Friday, August 16

9 p.m. to 6 a.m. (Nightly)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures McRea Boulevard to Hawkins Boulevard

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m. (Daily)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures McRea Boulevard to Hawkins Boulevard

Thursday, August 15 and Friday, August 16 – McRea Boulevard Intersection alternating lanes closure

9 a.m. to 1 p.m. (Roughly 4 Hours)

  • Montana Avenue (US-62) westbound and eastbound at McRea Boulevard intersection alternating lane closures. No through traffic on McRea Boulevard or left turns from Montana Avenue (US-62) at the intersection

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential/business access locations may be temporarily shifted due to milling/paving activities.

North Mesa Street Lighting Improvement Project

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Sunland Park Drive
  • Mesa (SH-20) northbound and southbound left lane closures Executive Center Boulevard to Festival Drive
  • Mesa (SH-20) northbound and southbound alternating left and right lane closures Mesita Drive/Sun Bowl Drive to Executive Center Boulevard
  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, installing new lighting poles, removing existing poles, electrical inspection, and Concrete sidewalk and landscape repairs.

Traffic Signal Improvements Project

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures along with left turn lane closures at the Camille Drive intersection.
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection
  • If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn around closures at Martin Luther King Boulevard/Kenworthy Street intersection

Crews will be working on intersection improvements.

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures

Crews will be potholing and boring to line locate.

Monday, August 12 through Friday, August 16

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be working on traffic signals.

Spall Repair

Wednesday, August 14

9 p.m. to 5 a.m. (Night)

  • I-10 westbound at Geronimo Exit three left lanes closed.

Thursday, August 15

9 p.m. to 5 a.m. (Night)

  • I-10 eastbound at Piedras Exit alternate lane closures

Crews will be repairing spall.

Green Ribbon Project

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be working on median improvements.

Maintenance

Monday, August 12 through Friday, August 16

9 a.m. to 3 p.m.

  • Spur 601 westbound between Chaffee and Loop 375 shoulder closed

Crews will be working on shoulder.

EAST AREA OFFICE PROJECTS

Montana Widening Project

Monday, August 12 to Saturday, August 17

Nightly, 9 p.m. to 5 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road complete closure from Global Reach to George Dieter

Crews will be working on removing concrete barrier to open the eastbound frontage road.

Loop 375 Widening Project

Monday August 12, through Thursday August 15

Nightly, 9 p.m. to 5 a.m.

·         Loop 375 south- and northbound main lane closure between North Loop overpass and Zaragoza (POE) overpass

·         Loop 375, North Loop Road, South Americas Road, and Zaragoza Road underpass at intersection with alternating lane closures

Crews will be working on installing bridge and roadway structures. 

Monday August 12, through Friday August 16

Daily, 9 a.m. to 4 p.m.

  • Americas Highway (Loop 375) southbound frontage road to turnaround at UPRR Bridge underpass and North Loop Road right lane closure
  • Americas Highway (Loop 375) frontage road turnarounds will be closed at North Loop underpass, south to north and north to south

Crews will be working on installing concrete driveway and bridge structures.

Continuous 24-hour closure, beginning 5 a.m. Saturday, August 10, through 5 a.m. Sunday, August 11

  • Loop 375 southbound main lane closure between I-10 to Loop 375 Connectors and southbound Zaragoza exit ramp

Continuous closure, beginning 5 a.m. Saturday, August 10 through 5 a.m. Sunday, August 18

  • Loop 375 southbound Zaragoza exit ramp will be closed

Crews will be performing a traffic switch-over to facilitate installation of bridge structures, concrete paving, and bridge joint repairs.

Continuous closure from present through 5 a.m. Monday, August 19

  • Loop 375 northbound frontage road between Joe Rodriguez Road and South Side Road

right lane closure

Crews securing roadway until required asphalt repair work is complete and drainage utilities are installed.

Horizon (FM1281)/Darrington Reconstruction Project

Monday, August 12

9 a.m. to 4 p.m.

  • Darrington Road right lane closure at Pawling Drive
  • Darrington Road right lane closure at Eastlake Boulevard

Crews will be performing electrical work.

Thursday August 15

9 a.m. to 4 p.m.

  • Darrington Road right lane closure at Pawling Drive
  • Darrington Road right lane closure at Eastlake Boulevard

Darrington Road Safety Lighting Project

Monday, July 29 through Friday, August 23

Daily, from 9 a.m. to 4 p.m.

  • Darrington Road north and southbound alternating right lane closure between Alberton Street and LTV Road

Crews will be installing conduit, drilling light pole foundation, pulling wire and setting light poles.

SH 20 Raised Medians Project

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east and westbound inside lane closures between Rio Vista Road and Passmore Road

Crews will be installing concrete medians and finishing installing electrical conduits.

Joe Battle Mill and Inlay Project

Sunday, August 10 through Thursday, August 15

Nightly, 9 p.m. to 6 a.m.

  • Joe Battle Boulevard northbound alternating lane closures between Pellicano Drive and Edgemere Boulevard
  • Company E Highway (Loop 375) exit and entrance ramps will be closed between Pellicano Drive and Edgemere Boulevard

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

CONTINUOUS CLOSURES

Horizon (FM1281)/Darrington Reconstruction Project

Monday, March 25 until further notice

  • Horizon Boulevard (FM1281) westbound lane closure from Torrey Pines to Desert Mesa Drive, lanes reduced to one lane
  • Horizon Boulevard (FM1281) hike/bike trail from Torrey Pines to Desert Mesa Drive will be closed indefinitely

Friday, June 28 until further notice

  • Horizon Boulevard (FM 1281) westbound lane from Desert Mesa to Rodman Street will be shifted to the median and transitioned back on Rodman Street
  • Horizon Boulevard (FM 1281) and Lago Del Esta intersection closure

Crews will be working on final subgrade, pavement operations and excavating ponding areas.

Median Concrete Barrier Project

Continuous closure until further notice

  • Montana Avenue (US 62/180) east and westbound complete left lane closure between RM 124 and RM 126 (Guadalupe Peak)
  • Traffic will be reduced to one lane in work areas.

Closure is necessary for installation of median concrete barrier.

RM 652 Full Depth Rehabilitation Project

Continuous closure until further notice

  • RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line
  • Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.

Closure is necessary for the construction of new roadway consisting of full depth rehabilitation.

RM 652 Full Widening Project

Monday, March 11 until further notice

  • RM 652 westbound lanes reduces to one lane two-way traffic from FM 3541 to Kimble Draw Bridge

Closure is necessary for the reconstruction of the roadway.

Please follow the detour signs in place on all projects.  All work is dependent upon weather conditions.

The post Road closures in El Paso County, Las Cruces for the week of August 12 to 16 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/08/12/road-closures-in-el-paso-county-las-cruces-for-the-week-of-august-12-to-16/feed/ 0 ]]>
ABC-7 at 4: Tips for drivers in school zones https://kvia.com/news/2024/08/09/abc-7-at-4-tips-for-drivers-in-school-zones/ https://kvia.com/news/2024/08/09/abc-7-at-4-tips-for-drivers-in-school-zones/#respond Fri, 09 Aug 2024 23:13:07 +0000 https://kvia.com/?p=1271892

EL PASO, Texas—Many El Paso students said goodbye to summer break this week, ready to take on the new school year. TxDOT is asking everyone to stay alert and help keep kids safe. Here, Txdot's Jennifer Wright highlights what drivers can do. TX Dot Projects to look out for next week: WEST AREA OFFICE PROJECTS

The post ABC-7 at 4: Tips for drivers in school zones appeared first on KVIA.

]]>

EL PASO, Texas—Many El Paso students said goodbye to summer break this week, ready to take on the new school year. TxDOT is asking everyone to stay alert and help keep kids safe. Here, Txdot's Jennifer Wright highlights what drivers can do.

TX Dot Projects to look out for next week:

WEST AREA OFFICE PROJECTS

I-10 Widening West

Emergency Closure

Thursday, August 8

9 p.m. to 5 a.m.

  • I-10 East will be closed from Transmountain Road to Artcraft.

DETOUR: Continue on South Desert Boulevard, re-enter I-10 past Artcraft

Crews will be restriping to open a new eastbound onramp south of Transmountain Road.

Monday, August 12, through Saturday, August 17

9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Transmountain Road and Vinton.

NOTE: Eastbound lane closure will not take place on Wednesday, August 14.

Crews will be working on retaining walls.

Monday, August 12

9 a.m. to 4 p.m.

  • I-10 East will be reduced to one lane between Redd Road and North Mesa Street

Crews will be removing wooden forms.

Monday, August 12 and Tuesday, August 13

9 p.m. to 5 a.m.

  • I-10 East will be closed between Redd Road and North Mesa Street

DETOUR: Take Exit 9 (Redd Road), continue on South Desert, re-enter I-10 past Mesa Street.

Crews will be removing wooden forms.

Wednesday, August 14

9 a.m. to 4 p.m.

  • Onramp to I-10 East at Vinton will be closed.

DETOUR: Take SH 20 South (Doniphan Drive), turn right on Talbot Avenue, turn left on Spur 16, turn right on South Desert Boulevard.

  • Turnaround from North Desert Boulevard to South Desert Boulevard at Vinton will be closed.
  • I-10 East will be reduced to one lane south of Vinton Road

Crews will be replacing a damaged guard rail.

Wednesday, August 14

9 p.m. to 5 a.m.

  • South Desert Boulevard will be closed at Redd Road.

DETOUR: Traffic must turn right on Redd Road.

  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard.

DETOUR: Traffic must turn right on South Desert Boulevard.

Crews will be placing bridge beams.

Thursday, August 15

9 p.m. to 5 a.m.

  • North Desert Boulevard will be closed at Redd Road.

DETOUR: Traffic must turn right on Redd Road.

  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard

DETOUR: Traffic must turn right on North Desert Boulevard.

Crews will be placing bridge beams.

40 Hour Closure

Friday, August 16 at 9pm, to Sunday, August 18 at 1pm

  • I-10 West will be closed at Vinton Road.

DETOUR: Continue on North Desert Boulevard, and re-enter I-10 past Vinton.

  • Beginning at 4am on Saturday, the closure will extend to Artcraft.

DETOUR: Take Exit 8 (SH 178/Artcraft Road), continue on North Desert Boulevard, and re-enter I-10 past Vinton.

Crews will be placing permanent concrete barriers and reopening I-10 West to two lanes.

Advance warning

Monday, August 19, through Wednesday August 21

9 p.m. to 5 a.m.

  • Redd Road will be closed between North Desert Boulevard and South Desert Boulevard

EASTBOUND DETOUR: Turn right on South Desert, use the turnaround at Mesa Street to North Desert, turn right on Redd Road.

WESTBOUND DETOUR: Turn right on North Desert, turn left on Artcraft Road, turn left on South Desert, turn right on Redd Road.

Crews will be placing bridge deck panels.

The following closures and detours will continue until further notice:

  • The westbound mainlanes of I-10 are detoured onto North Desert Boulevard at Los Mochis Drive.
  • The eastbound mainlanes of I-10 are detoured onto South Desert Boulevard at Los Mochis Drive.
  • South Desert Boulevard is closed to all traffic south of Spur 37 (Vinton Road).
  • Thorn Avenue is closed to all traffic between North Desert Boulevard and South Desert Boulevard.
  • Both turnarounds at Redd Road are closed.
  • Alternating daytime lane closures are possible on North Desert Boulevard and South Desert Boulevard between Redd Road and Vinton Road.

North Mesa Street Rehabilitation Project

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • If Needed - Mesa (SH-20) northbound and southbound alternating lane closures Resler Drive to Remcon Circle

Crews will be working on finishing items, striping, and small concert work.

Montana (US-62) Mill & Inlay Project

Sunday, August 11 through Friday, August 16

9 p.m. to 6 a.m. (Nightly)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures McRea Boulevard to Hawkins Boulevard

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m. (Daily)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures McRea Boulevard to Hawkins Boulevard

Thursday, August 15 and Friday, August 16 – McRea Boulevard Intersection alternating lanes closure

9 a.m. to 1 p.m. (Roughly 4 Hours)

  • Montana Avenue (US-62) westbound and eastbound at McRea Boulevard intersection alternating lane closures. No through traffic on McRea Boulevard or left turns from Montana Avenue (US-62) at the intersection

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential/business access locations may be temporarily shifted due to milling/paving activities.

North Mesa Street Lighting Improvement Project

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Sunland Park Drive
  • Mesa (SH-20) northbound and southbound left lane closures Executive Center Boulevard to Festival Drive
  • Mesa (SH-20) northbound and southbound alternating left and right lane closures Mesita Drive/Sun Bowl Drive to Executive Center Boulevard
  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, installing new lighting poles, removing existing poles, electrical inspection, and Concrete sidewalk and landscape repairs.

Traffic Signal Improvements Project

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures along with left turn lane closures at the Camille Drive intersection.
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection
  • If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn around closures at Martin Luther King Boulevard/Kenworthy Street intersection

Crews will be working on intersection improvements.

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures

Crews will be potholing and boring to line locate.

Monday, August 12 through Friday, August 16

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be working on traffic signals.

Spall Repair

Wednesday, August 14

9 p.m. to 5 a.m. (Night)

  • I-10 westbound at Geronimo Exit three left lanes closed.

Thursday, August 15

9 p.m. to 5 a.m. (Night)

  • I-10 eastbound at Piedras Exit alternate lane closures

Crews will be repairing spall.

Green Ribbon Project

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be working on median improvements.

Maintenance

Monday, August 12 through Friday, August 16

9 a.m. to 3 p.m.

  • Spur 601 westbound between Chaffee and Loop 375 shoulder closed

Crews will be working on shoulder.

EAST AREA OFFICE PROJECTS

Montana Widening Project

Monday, August 12 to Saturday, August 17

Nightly, 9 p.m. to 5 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road complete closure from Global Reach to George Dieter

Crews will be working on removing concrete barrier to open the eastbound frontage road.

Purple Heart Loop 375 Widening

Tuesday, August 20

8 a.m. to 3:30 p.m.

  • Purple Heart Highway (Loop 375) southbound right lane closure from Iron Medics to Montana Avenue

Crews will be installing bridge girders.

Wednesday, August 21

9 a.m. to 4 p.m.

  • Purple Heart Highway (Loop 375) northbound right lane closure from Montana Avenue to Iron Medics

Crews will be installing bridge girders.

Thursday, August 22

Nightly, 9 p.m. to 5 a.m.

  • Purple Heart Highway (Loop 375) northbound main lane closure from Montana Avenue to Spur 601
  • Purple Heart Highway (Loop 375) northbound entrance ramp at Montana Avenue will be closed.

Traffic heading northbound will have to use Montana Avenue to Global Reach to continue onto SL 375.

Crews will be installing bridge girders.

Saturday, August 24

3 a.m. to 7 p.m.

  • Purple Heart Highway (Loop 375) north and southbound main lane closure from Montana Avenue to Spur 601
  • Purple Heart Highway (Loop 375) entrance ramps at Montana Avenue northbound and Spur 601 southbound will be closed.

Crews will be installing bridge girders.

Continuous closure until further notice

  • Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601

Crews will be widening main lanes and constructing north and southbound frontage road.

Loop 375 Widening Project

Monday August 12, through Thursday August 15

Nightly, 9 p.m. to 5 a.m.

·         Loop 375 south- and northbound main lane closure between North Loop overpass and Zaragoza (POE) overpass

·         Loop 375, North Loop Road, South Americas Road, and Zaragoza Road underpass at intersection with alternating lane closures

Crews will be working on installing bridge and roadway structures. 

Monday August 12, through Friday August 16

Daily, 9 a.m. to 4 p.m.

  • Americas Highway (Loop 375) southbound frontage road to turnaround at UPRR Bridge underpass and North Loop Road right lane closure
  • Americas Highway (Loop 375) frontage road turnarounds will be closed at North Loop underpass, south to north and north to south

Crews will be working on installing concrete driveway and bridge structures.

Continuous 24-hour closure, beginning 5 a.m. Saturday, August 10, through 5 a.m. Sunday, August 11

  • Loop 375 southbound main lane closure between I-10 to Loop 375 Connectors and southbound Zaragoza exit ramp

Continuous closure, beginning 5 a.m. Saturday, August 10 through 5 a.m. Sunday, August 18

  • Loop 375 southbound Zaragoza exit ramp will be closed

Crews will be performing a traffic switch-over to facilitate installation of bridge structures, concrete paving, and bridge joint repairs.

Continuous closure from present through 5 a.m. Monday, August 19

  • Loop 375 northbound frontage road between Joe Rodriguez Road and South Side Road

right lane closure

Crews securing roadway until required asphalt repair work is complete and drainage utilities are installed.

Horizon (FM1281)/Darrington Reconstruction Project

Monday, August 12

9 a.m. to 4 p.m.

  • Darrington Road right lane closure at Pawling Drive
  • Darrington Road right lane closure at Eastlake Boulevard

Crews will be performing electrical work.

Thursday August 15

9 a.m. to 4 p.m.

  • Darrington Road right lane closure at Pawling Drive
  • Darrington Road right lane closure at Eastlake Boulevard

Darrington Road Safety Lighting Project

Monday, July 29 through Friday, August 23

Daily, from 9 a.m. to 4 p.m.

  • Darrington Road north and southbound alternating right lane closure between Alberton Street and LTV Road

Crews will be installing conduit, drilling light pole foundation, pulling wire and setting light poles.

SH 20 Raised Medians Project

Monday, August 12 through Friday, August 16

9 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east and westbound inside lane closures between Rio Vista Road and Passmore Road

Crews will be installing concrete medians and finishing installing electrical conduits.

Joe Battle Mill and Inlay Project

Sunday, August 10 through Thursday, August 15

Nightly, 9 p.m. to 6 a.m.

  • Joe Battle Boulevard northbound alternating lane closures between Pellicano Drive and Edgemere Boulevard
  • Company E Highway (Loop 375) exit and entrance ramps will be closed between Pellicano Drive and Edgemere Boulevard

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

CONTINUOUS CLOSURES

Horizon (FM1281)/Darrington Reconstruction Project

Monday, March 25 until further notice

  • Horizon Boulevard (FM1281) westbound lane closure from Torrey Pines to Desert Mesa Drive, lanes reduced to one lane
  • Horizon Boulevard (FM1281) hike/bike trail from Torrey Pines to Desert Mesa Drive will be closed indefinitely

Friday, June 28 until further notice

  • Horizon Boulevard (FM 1281) westbound lane from Desert Mesa to Rodman Street will be shifted to the median and transitioned back on Rodman Street
  • Horizon Boulevard (FM 1281) and Lago Del Esta intersection closure

Crews will be working on final subgrade, pavement operations and excavating ponding areas.

Median Concrete Barrier Project

Continuous closure until further notice

  • Montana Avenue (US 62/180) east and westbound complete left lane closure between RM 124 and RM 126 (Guadalupe Peak)
  • Traffic will be reduced to one lane in work areas.

Closure is necessary for installation of median concrete barrier.

RM 652 Full Depth Rehabilitation Project

Continuous closure until further notice

  • RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line
  • Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.

Closure is necessary for the construction of new roadway consisting of full depth rehabilitation.

RM 652 Full Widening Project

Monday, March 11 until further notice

  • RM 652 westbound lanes reduces to one lane two-way traffic from FM 3541 to Kimble Draw Bridge

Closure is necessary for the reconstruction of the roadway.

The post ABC-7 at 4: Tips for drivers in school zones appeared first on KVIA.

]]>
https://kvia.com/news/2024/08/09/abc-7-at-4-tips-for-drivers-in-school-zones/feed/ 0 ]]>
TxDOT crews clean up gravel on US 54 ramp https://kvia.com/news/top-stories/2024/08/09/traffic-alert-gravel-on-us-54-ramp-prompts-closure-and-backs-up-traffic/ https://kvia.com/news/top-stories/2024/08/09/traffic-alert-gravel-on-us-54-ramp-prompts-closure-and-backs-up-traffic/#respond Fri, 09 Aug 2024 18:43:22 +0000 https://kvia.com/?p=1271751

UPDATE: Ramp to US 54 at I-10 reopens after crews cleared debris. EL PASO, Texas (KVIA) - The righter interchange ramp along I-10 to US 54 is blocked as TxDOT crews work to clear gravel on the roadway. Traffic on the ramp is backed up and can be seen on the TxDOT traffic cameras. No

The post TxDOT crews clean up gravel on US 54 ramp appeared first on KVIA.

]]>

UPDATE: Ramp to US 54 at I-10 reopens after crews cleared debris.

EL PASO, Texas (KVIA) - The righter interchange ramp along I-10 to US 54 is blocked as TxDOT crews work to clear gravel on the roadway.

Traffic on the ramp is backed up and can be seen on the TxDOT traffic cameras.

No injuries reported. Clearing time until further notice.

The post TxDOT crews clean up gravel on US 54 ramp appeared first on KVIA.

]]>
https://kvia.com/news/top-stories/2024/08/09/traffic-alert-gravel-on-us-54-ramp-prompts-closure-and-backs-up-traffic/feed/ 0 ]]>
ABC-7 at 4: TxDot El Paso reminds the community to “Look Before You Lock” https://kvia.com/news/2024/08/02/abc-7-at-4-txdot-el-paso-reminds-the-community-to-look-before-you-lock/ https://kvia.com/news/2024/08/02/abc-7-at-4-txdot-el-paso-reminds-the-community-to-look-before-you-lock/#respond Fri, 02 Aug 2024 23:10:36 +0000 https://kvia.com/?p=1268584

El Paso, TX (KVIA-TV)-The heat and the humidity have been brutal this summer. TxDOT El Paso wants to remind Borderland residents to look before they lock to prevent heatstroke-related deaths. Jennifer Wright talks about the risks of not protecting your children and pets from the dangerous heat. Here's a look at the closures: (courtesy of TX Dot

The post ABC-7 at 4: TxDot El Paso reminds the community to “Look Before You Lock” appeared first on KVIA.

]]>

El Paso, TX (KVIA-TV)-The heat and the humidity have been brutal this summer. TxDOT El Paso wants to remind Borderland residents to look before they lock to prevent heatstroke-related deaths. Jennifer Wright talks about the risks of not protecting your children and pets from the dangerous heat.

Here's a look at the closures:

(courtesy of TX Dot El Paso):

US-62 Rehabilitation Project

Sunday, August 4 through Friday, August 9

9 p.m. to 6 a.m. (Nightly)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures McRae Boulevard to Hawkins Boulevard

Monday, August 5 through Friday, August 9

9 a.m. to 4 p.m. (Daily)

  • Montana Avenue (US-62) westbound and eastbound alternating lane closures McRae Boulevard to Hawkins Boulevard

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential / business access locations may be temporarily shifted due to milling/paving activities.

North Mesa Street Lighting Improvement Project

Monday, August 5 through Friday, August 9

9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Sunland Park Drive
  • Mesa (SH-20) northbound and southbound left lane closures Executive Center Boulevard to Festival Drive
  • Mesa (SH-20) northbound and southbound alternating left and right lane closures Mesita Drive/Sun Bowl Drive to Executive Center Boulevard
  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, installing new lighting poles, removing existing poles, electrical inspection, and Concrete sidewalk and landscape repairs.

Traffic Signal Improvements Project

Monday, August 5 through Friday, August 9

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures at the Resler Drive intersection
  • Mesa (SH-20) north and southbound left turn lane closures at the Camille Drive intersection
  • Montana (US-62) east and westbound right lane closures at McRae Boulevard intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection

Crews will be working on intersection improvements.

Mesa Street at Belvidere Street Improve Traffic Signals Project

Monday, August 5 through Friday, August 9

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures

Crews will be potholing and boring to line locate.

Mill / Inlay From SH-20 (Alameda) to Global Reach

Monday, August 5 through Friday, August 9

9 a.m. to 4 p.m.

  • Montana east- and westbound between Paisano and Yarbrough alternate lane closures

Crews will be milling and paving.

Sunday, August 4 through Friday, August 9

8 p.m. to 6 a.m. (Nightly)

  • Montana (US-62) East and Westbound alternate lane closures between Global Reach and McRae Boulevard intersection

Crews will be milling and paving.

Mill / Inlay From SH-20 (Mesa) to Sunland Park

Monday, August 5

9 a.m. to 4 p.m.

  • I-10 eastbound Exit 13 Sunland Park between Mesa and Sunland Park closed
  • Turnaround east- to westbound between Sunland Park and North Desert closed
  • Intersection at Sunland Park and North Desert right turn lane closed

Crews will be installing roadway signs.

Tuesday, August 6

9 a.m. to 4 p.m.

  • Turnaround west- to eastbound between Sunland Park and South Desert closed
  • Intersection at Sunland Park and North Desert westbound right turn lane closed

Crews will be installing roadway signs.

Maintenance

Sunday, August 4

4 a.m. to 4 p.m.

•I-10 east between Buena Vista and Mesa Park four left lanes closed

•CD lanes to I-10 east entrance ramp closed

•Sunland Park entrance ramp closed

Crews will be working on bridge deck joint repairs.

 

 

Monday, August 5 through Friday, August 9

9 a.m. to 3 p.m.

  • Spur 601 westbound between Chaffee and Loop 375

Crews will be working on shoulder.

Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.

I-10 Widening West

Sunday, August 4, through Thursday, August 8

9 p.m. to 6 a.m.

  • I-10 East will be closed from Redd Road to Mesa Street.

DETOUR: Take Exit 9 (Redd Road), continue on South Desert Boulevard, and re-enter I-10 East after Mesa Street.

Crews will be working on reconstructing the Thorn Avenue Bridge

Monday, August 5, through Saturday, August 10

9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Transmountain Road and Vinton.

Crews will be working on retaining walls.

Tuesday, August 6

9 a.m. to 3 p.m.

  • Exit 6A (Loop 375/Spur 16/Transmountain Road) from I-10 West will be closed.

DETOUR: Take Exit 8 (SH 178/Artcraft Road) and continue on North Desert Boulevard to Transmountain Road.

Crews will be placing a drilled shaft

Monday, August 12

9 a.m. to 4 p.m.

  • I-10 East will be reduced to one lane at Thorn Avenue.

Crews will be removing forms used to work on the new Thorn Avenue overpass.

Monday, August 12, and Tuesday, August 13

9 p.m. to 5 a.m.

  • I-10 East will be closed from Redd Road to Mesa Street.

DETOUR: Take Exit 9 (Redd Road), continue on South Desert Boulevard, and re-enter I-10 East after Mesa Street.

Crews will be removing forms used to work on the new Thorn Avenue overpass.

Montana Frontage Road Project

Tuesday, August 6 to Friday, August 9

Daily, 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure from Lee Boulevard to Leticia Street

Survey crew will be working on walls.

Purple Heart Loop 375 Widening

Monday, July 15 through Friday, August 9

Daily, from 9 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be working on placing asphalt in the median.

Continuous closure until further notice

  • Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601

Crews will be widening main lanes and constructing north and southbound frontage road.

Tuesday, August 20

8 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) southbound right lane closure from Iron Medics to Montana Avenue

Crews will be installing bridge girders.

Wednesday, August 21

9 a.m. to 4 p.m.

  • Purple Heart Highway (SL 375) northbound right lane closure from Montana Avenue to Iron Medics

Crews will be installing bridge girders.

Thursday, August 22

(Night work) 9 p.m. to 5 a.m.

  • Purple Heart Highway (SL 375) northbound main lane closure from Montana Avenue to Spur 601
  • Purple Heart Highway (SL 375) northbound entrance ramp at Montana Avenue will be closed.
  • Traffic heading northbound will have to use Montana Avenue to Global Reach to continue onto SL 375.

Crews will be installing bridge girders.

Saturday, August 24

3 a.m. to 7 p.m.

  • Purple Heart Highway (SL 375) north and southbound main lane closure from Montana Avenue to Spur 601
  • Purple Heart Highway (SL 375) entrance ramps at Montana Avenue northbound and Spur 601 southbound will be closed.

Crews will be installing bridge girders.

Loop 375 Widening Project

Monday August 5, through Thursday August 8

Nightly 9 p.m. until 5 a.m.

  • Americas Highway (Loop 375) south and northbound main lane closure between North Loop overpass and Zaragoza (POE) overpass
  • Americas Avenue (frontage road) North Loop underpass complete closure at intersection

Crews will be working on installing bridge and roadway structures.

SH 20 Raised Medians Project

Monday, August 5 through Friday, August 9

Continuous closure

  • SH 20 (Alameda Avenue) east and westbound inside lane closures between Rio Vista Road and Passmore Road

Crews will be installing concrete medians and finish installing electrical conduits.

Wednesday, August 7

Night work, 9 p.m. to 3 a.m.

  • SH 20 (Alameda Avenue) eastbound main lane closure between Sun Park Road and Vineyard Road.

Eastbound traffic will be switched to westbound main lanes for two-way traffic.

Crews will be boring.

SL 375 Mill and Inlay Project

Sunday, August 4 through Thursday, August 8

Nightly, 9 p.m. to 6 a.m.

  • Joe Battle Boulevard (frontage road) northbound alternating right and left lane closures between Pellicano Drive and Edgemere Boulevard
  • Company E Highway (SL 375) exit and entrance ramps will be closed between Pellicano Drive and Edgemere Boulevard

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

Zaragoza (FM 659) Mill and Inlay

Monday, August 5

9 a.m. to 4 p.m.

  • Zaragoza Road (FM 659) northbound right lane closure from Pebble Hills to Laura Lane

Crews will be working on prepping subgrade.

Monday, August 5 to Monday, August 9

9 a.m. to 4 p.m.

  • Zaragoza Road (FM659) southbound right lane closure from Laura Lane to Pebble Hills

Closure Links:

West Area Project Closures

I-10 Widening West Closures

East Area Project Closures 

The post ABC-7 at 4: TxDot El Paso reminds the community to “Look Before You Lock” appeared first on KVIA.

]]>
https://kvia.com/news/2024/08/02/abc-7-at-4-txdot-el-paso-reminds-the-community-to-look-before-you-lock/feed/ 0 ]]>
ABC-7 XTRA SUNDAY – El Paso road projects: What’s happening now, what’s to come https://kvia.com/for/2024/08/02/abc-7-xtra-sunday-el-paso-road-projects-whats-happening-now-whats-to-come/ https://kvia.com/for/2024/08/02/abc-7-xtra-sunday-el-paso-road-projects-whats-happening-now-whats-to-come/#respond Fri, 02 Aug 2024 21:00:00 +0000 https://kvia.com/?p=1267952

EL PASO, Texas (KVIA) -- El Paso has seen a number of long-term road projects going on across the city, from I-10, to Montana, to Loop 375 and places in between. These are state projects overseen by TXDOT. But, we haven't seen the last of them. Even though our population has decreased slightly, there seems to

The post ABC-7 XTRA SUNDAY – El Paso road projects: What’s happening now, what’s to come appeared first on KVIA.

]]>

EL PASO, Texas (KVIA) -- El Paso has seen a number of long-term road projects going on across the city, from I-10, to Montana, to Loop 375 and places in between. These are state projects overseen by TXDOT. But, we haven't seen the last of them.

Even though our population has decreased slightly, there seems to be more traffic on our roads. And that means more road projects are coming that in the long term will make your drive easier. This week on ABC-7 Xtra Sunday, Jennifer Wright with TXDOT will talk about the projects currently underway, and what's coming down the road. 

ABC-7 Xtra Sunday airs at 10:35 pm, right after ABC-7 at Ten Weekend.

The post ABC-7 XTRA SUNDAY – El Paso road projects: What’s happening now, what’s to come appeared first on KVIA.

]]>
https://kvia.com/for/2024/08/02/abc-7-xtra-sunday-el-paso-road-projects-whats-happening-now-whats-to-come/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of July 29 to August 2 https://kvia.com/traffic/2024/07/29/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-29-to-august-2/ https://kvia.com/traffic/2024/07/29/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-29-to-august-2/#respond Mon, 29 Jul 2024 10:37:15 +0000 https://kvia.com/?p=1265898

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures July 29 to August 2. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information

The post Road closures in El Paso County, Las Cruces for the week of July 29 to August 2 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures July 29 to August 2. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

I-10 Widening West

Monday, July 29, through Saturday, August 3

9 a.m. to 4 p.m.

  • North and South Desert Boulevard will be reduced to one lane between Anthony, New Mexico state line and Redd Road.

Crews will be working on electrical and miscellaneous construction.

Monday, July 29, through Saturday, August 3

9 a.m. to 4 p.m.

  • I-10 West and East will be reduced to one lane between Vinton Road and Transmountain Road

Crews will be working on retaining wall construction

Monday, July 29, through Wednesday, July 31

9 a.m. to 4 p.m.

  • I-10 East will be reduced to one lane between Redd Road and North Mesa Street.

Crews will be widening the shoulder.

Monday, July 29, through Saturday, Aug 3

9 a.m. to 4 p.m.

  • I-10 West will be reduced to one lane at Thorn Avenue.

Crews will be working on columns

North Mesa Street Rehabilitation Project

Sunday, July 28 through Friday, August 02

8 p.m. to 6 a.m.

  • Rolling lane closure for permanent striping Yandell Drive to Glory Road / East Baltimore Drive

Monday, July 28 through Friday, August 02

9 a.m. to 4 p.m.

  • If Needed - Mesa (SH-20) northbound and southbound alternating lane closures Sunland Park Drive to Doniphan Drive

Crews will be working on finishing items, striping, and small concrete work.

Montana Mill & Inlay

Monday, July 29 through Friday, August 2

9 a.m. to 4 p.m.

  • Montana east- and westbound between Paisano and Yarbrough alternate lane closures

Crews will be milling and paving.

Sunday, July 28 through Friday, August 2

8 p.m. to 6 a.m. (Nightly)

  • Montana (US-62) East and Westbound alternate lane closures between Global Reach and McRae Boulevard intersection

Crews will be milling and paving.

I-10 Mill & Inlay

Monday, July 29

9 a.m. to 4 p.m.

  • I-10 eastbound between Mesa and Sunland Park right lane closed
  • CD lanes eastbound between Mesa and Sunland Park left lane closed
  • I-10 Exit 13 eastbound between I-10 eastbound and CD lanes closed

Crews will be installing DMS boards and small road signs.

Tuesday, July 30

9 a.m. to 4 p.m.

  • CD Lanes eastbound between Mesa and Sunland Park right shoulder closed
  • CD lanes eastbound between Resler on-ramp and Sunland Park exit right lane closed
  • Sunland Park turnaround east- to westbound closed

Crews will be installing CCTV’s and mall road signs.

Wednesday, July 31

9 a.m. to 4 p.m.

  • I-10 eastbound between Mesa and Sunland Park right lane closed
  • CD lanes eastbound between Mesa and Sunland Park left lane closed
  • Sunland Park eastbound intersection alternate lane closures

Crews will be installing DMS boards and small road signs.

Thursday, August 1

9 a.m. to 4 p.m.

  • I-10 westbound between Sunland and Mesa right lane closed
  • Sunland Park eastbound between Sunland Park on-ramp
  • I-10 to Executive exit left lane closed
  • Sunland Park turnaround west- and eastbound closed

Crews will be installing CCTV’s and mall road signs.

Friday, August 2

9 a.m. to 4 p.m.

  • I-10 westbound between Sunland and Mesa right lane closed
  • CD lanes westbound between Sunland and Mesa left lane closed
  • Sunland Park intersection westbound alternate lane closure

Crews will be installing DMS boards and small road signs.

North Mesa Street Lighting Improvement Project

Monday, July 28 through Friday, August 02

9 a.m. to 4 p.m.

  • As Needed: North- and southbound right lane and left lane closures Crossroads Drive to Doniphan Drive
  • As Needed: North- and southbound right lane closures I-10 to Crossroads Drive
  • North- and southbound right lane closures Festival Drive to Sunland Park Drive
  • North- and southbound left lane closures Executive Center Boulevard to Festival Drive
  • North- and southbound alternating left and right lane closures Mesita Drive/Sun Bowl Drive to Executive Center Boulevard
  • North- and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, installing new lighting poles, removing existing poles, electrical inspection, and Concrete sidewalk and landscape repairs.

Traffic Signals Project

Monday, July 29 through Friday, August 2

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures

Crews will be potholing and boring to line locate.

Monday, July 29 through Friday, August 2

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be working on traffic signals.

Green Ribbon Project

Monday, July 29 through Friday, August 2

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be working on median improvements.

Guardrail Repair

Monday, July 29

9 a.m. to 4 p.m.

  • I-10 eastbound between Stateline and Vinton right lane closed.

Tuesday, July 30

9 a.m. to 4 p.m.

  • I-10 eastbound between Resler and Mesa Park right lane closure.

Wednesday, July 31

9 a.m. to 4 p.m.

  • Executive westbound between Pinnacle and CD lanes right lane closure.

Crews will be working on guardrail.

Maintenance

Monday, July 29 through Friday, August 2

9 a.m. to 3 p.m.

  • Spur 601 east- and westbound between Chaffee and Loop 375 lane closed

Crews will be working on shoulder.

EAST AREA OFFICE PROJECTS

Montana Widening Project

Monday, July 18 through Saturday, August 03

Continuous closure until further notice

  • Alba Lane full closure access to Montana Avenue (US 62/180)
  • Smoke Signal full closure access to Montana Avenue (US 62/180)

Crews will be working on concrete pavement at intersection.

Monday, July 29 through Thursday, August 01

Nightly, from 9 p.m. to 5 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road complete closure and right lane onto northbound Purple Heart Highway (Loop 375)

Crews will be working on installing storm drains.

Thursday, August 01

9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound at George Dieter intersection lane closures

Crews will be switching traffic lights.

Purple Heart Widening Project

Monday, July 15 through Friday, August 09

Daily, from 9 a.m. to 3:30 p.m.

  • Purple Heart Highway (Loop 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be working on placing asphalt in the median.

Continuous closure until further notice

  • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601

Crews will be widening main lanes and constructing north- and southbound frontage road.

Loop 375 Widening Project

Monday July 29, through Thursday August 1

Nightly 9 p.m. until 5 a.m.

·         Loop 375 south- and northbound main lane closure between North Loop Overpass and Zaragoza (POE) Overpass

·         Americas Avenue (frontage road) North Loop underpass at intersection full closure

Crews will be working on installing bridge and roadway structures. 

The post Road closures in El Paso County, Las Cruces for the week of July 29 to August 2 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/07/29/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-29-to-august-2/feed/ 0 ]]>
I-10 eastbound at Copia shut down Thursday afternoon as electric cars catch fire on vehicle carrier https://kvia.com/news/abc-7-alert-center/2024/07/25/i-10-eastbound-at-copia-closed-due-to-18-wheeler-fire-traffic-backed-up-to-schuster/ https://kvia.com/news/abc-7-alert-center/2024/07/25/i-10-eastbound-at-copia-closed-due-to-18-wheeler-fire-traffic-backed-up-to-schuster/#respond Thu, 25 Jul 2024 19:46:42 +0000 https://kvia.com/?p=1264561

Update: Two electric cars loaded on a vehicle carrier trailer caught fire Thursday, causing a multi-hour shutdown on I-10 eastbound lanes through the afternoon, according to the El Paso Fire Department. In a post on the its Facebook page, the department says El Paso firefighters were able to quickly contain the fire. Pictures from the

The post I-10 eastbound at Copia shut down Thursday afternoon as electric cars catch fire on vehicle carrier appeared first on KVIA.

]]>

Update: Two electric cars loaded on a vehicle carrier trailer caught fire Thursday, causing a multi-hour shutdown on I-10 eastbound lanes through the afternoon, according to the El Paso Fire Department. In a post on the its Facebook page, the department says El Paso firefighters were able to quickly contain the fire. Pictures from the department show firefighters approaching a vehicle with a charred front-end, with parts of vehicles loaded above it melting.

According to the department, firefighters had to ensure the lithium batteries inside the cars were safe enough to be moved from the scene.

The El Paso Police Department was able to clear the road to reopen fully by 5 PM.


EL PASO, Texas (KVIA) -- Traffic is backed up on Interstate 10 eastbound to the Schuster Ave exit near the University of Texas at El Paso (UTEP) campus.

ABC-7 cameras show a tractor-trailer vehicle carrier on the right shoulder surrounded by emergency vehicles, causing all traffic to exit I-10.

View from the ABC-7 Mountain cam of the vehicle fire on I-10 near Copia

The El Paso Fire Department posted on x.com (formerly Twitter) that there were no injuries reported as of yet.

El Paso Police posted that the time to clear would not be until later in the afternoon.

The post I-10 eastbound at Copia shut down Thursday afternoon as electric cars catch fire on vehicle carrier appeared first on KVIA.

]]>
https://kvia.com/news/abc-7-alert-center/2024/07/25/i-10-eastbound-at-copia-closed-due-to-18-wheeler-fire-traffic-backed-up-to-schuster/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of July 22 to 26 https://kvia.com/traffic/2024/07/22/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-22-to-26/ https://kvia.com/traffic/2024/07/22/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-22-to-26/#respond Mon, 22 Jul 2024 11:24:06 +0000 https://kvia.com/?p=1262731

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures July 22 to July 26. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click

The post Road closures in El Paso County, Las Cruces for the week of July 22 to 26 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures July 22 to July 26. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

Guardrail Repair

Monday, July 22

9 a.m. to 4 p.m.

  • Gateway West between Chelsea and Raynolds left lane and on-ramp closed at Raynolds

Tuesday, July 23

9 a.m. to 4 p.m.

  • North Desert eastbound between West Frontage Road and Antonio right lane closed

Crews will be working on guardrail.

US-62 Rehabilitation Project

Sunday, July 21 through Friday, July 26

9 p.m. to 6 a.m. (Nightly)

  • Montana Avenue (US-62) westbound and eastbound right and middle lane closures Global Reach Drive/Yarbrough Drive to McRea Boulevard

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential / business access locations may be temporarily shifted due to milling/paving activities.

Delta/Alameda & Zaragoza/George Dieter Traffic Signal Improvement Project

Monday, July 22 through Friday, July 26

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be working on traffic signals.

Green Ribbon Project

Monday, July 22 through Friday, July 26

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be working on median improvements.

Mill/Inlay From SH-20 (Alameda) to Global Reach

Monday, July 22 through Friday, July 26

9 a.m. to 4 p.m.

  • Montana east- and westbound between Paisano and Yarbrough alternate lane closures

Crews will be milling and paving.

Sunday, July 21 through Friday, July 26

8 p.m. to 6 a.m. (Nightly)

  • Montana (US-62) East and Westbound alternate lane closures between Global Reach and McRae Boulevard intersection

Crews will be milling and paving.

Maintenance

Monday, July 22 through Friday, July 26

9 a.m. to 3 p.m.

  • Spur 601 east- and westbound between Chaffee and Loop 375 lane closed

Crews will be working on shoulder.

Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.

I-10 widening west closures

Monday, July 22, through Saturday, July 27

9 a.m. to 4 p.m.

  • I-10 will be reduced to one lane between Vinton Road and Transmountain Road.

Crews will be constructing retaining walls.

Monday, July 22, through Wednesday, July 24

9 a.m. to 4 p.m.

  • I-10 East will be reduced to one lane between Redd Road and North Mesa Street.

Crews will be widening the shoulder.

Tuesday, July 23

9 a.m. to 4 p.m.

  • Exit 6A (Loop 375/Spur 16/Transmountain Road) from I-10 West will be closed.

DETOUR: Take Exit 8 (SH 178 /Artcraft Road/Paseo del Norte), continue on North Desert Boulevard.

Crews will be working on the foundation for an overhead sign bridge.

Thursday, July 25, through Saturday, July 27

9 a.m. to 4 p.m.

  • I-10 West will be reduced to one lane between North Mesa Street and Redd Road.

Crews will be widening the shoulder.

Montana Frontage Road Project

Monday, July 08 through Saturday, July 27

Daily, from 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street

Crews will be exporting material.

Monday, July 18 through Saturday, August 03

Continuous closure until further notice

  • Alba Lane full closure access to Montana Avenue (US 62/180)
  • Smoke Signal full closure access to Montana Avenue (US 62/180)

Crews will be working on concrete pavement at intersections.

Purple Heart Loop 375 Widening

Monday, July 15 through Friday, August 09

Daily, from 9 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be working on placing asphalt in the median.

Continuous closure until further notice

  • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601.

Crews will be widening main lanes and constructing north- and southbound frontage road.

Loop 375 Widening Project

Monday, July 22 through Thursday, July 25

Nightly, 9 p.m. until 5 a.m.

  • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Bridge Overpass and Zaragoza (P.O.E) Bridge Overpass
  • Americas Avenue (frontage road) North Loop Road underpass at intersection with full closure

Crews will be working on installing bridge and roadway structures.

SH 20 Raised Medians Project

Saturday, July 21 through Sunday, July 27

Daily, 8 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east- and westbound inside lane closures between Rio Vista Boulevard and Passmore Road

Crews will be installing concrete medians and finishing electrical conduits.

SL 375 Mill and Inlay Project

Sunday, July 21 through Thursday, July 25

Nightly, 9 p.m. to 6 a.m.

  • SL 375 (Joe Battle Boulevard) north- and southbound alternating right and left lane closures between Pellicano Drive and Montana Avenue

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

IH10 Widening East

Monday, July 22 through Friday, July 26

Daily from 9 a.m. to 3:30 p.m.

  • IH10 east alternating left and right shoulder closures between Eastlake Boulevard and Horizon Boulevard
  • Gateway east alternating left and right shoulder closures between Eastlake Boulevard and Horizon Boulevard

Daily, from 9 a.m. to 4 p.m.

  • IH10 west alternating left and right shoulder closure between Eastlake Boulevard and Horizon Boulevard
  • Gateway west alternating left and right lane closures between Eastlake Boulevard and Horizon Boulevard

Crews will be working on replacing signs and repairing guardrail.

The post Road closures in El Paso County, Las Cruces for the week of July 22 to 26 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/07/22/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-22-to-26/feed/ 0 ]]>
Juarez authorities secured dozens of cars during “Operation Fast and Furious” https://kvia.com/news/border/2024/07/15/juarez-authorities-secured-dozens-of-cars-during-operation-fast-and-furious/ https://kvia.com/news/border/2024/07/15/juarez-authorities-secured-dozens-of-cars-during-operation-fast-and-furious/#respond Mon, 15 Jul 2024 17:58:59 +0000 https://kvia.com/?p=1259397

JUAREZ, Chihuahua (KVIA) -- Juárez Road Safety Coordination agents carried out “Operation Fast and Furious” on 4 Siglos and Costa Rica Boulevard, in the El Chamizal area, as well as Margarito Herrera and Ramón Rayón, in Plaza Sendero Las Torres. The objective was to stop street racing in Juarez. They secured 108 cars, 35 in

The post Juarez authorities secured dozens of cars during “Operation Fast and Furious” appeared first on KVIA.

]]>

JUAREZ, Chihuahua (KVIA) -- Juárez Road Safety Coordination agents carried out “Operation Fast and Furious” on 4 Siglos and Costa Rica Boulevard, in the El Chamizal area, as well as Margarito Herrera and Ramón Rayón, in Plaza Sendero Las Torres. The objective was to stop street racing in Juarez.

They secured 108 cars, 35 in the Chamizal area and 73 in the Plaza Sendero las Torres.

During the operation, carried out with the support of the Juárez Secretary of Public Safety, three people were arrested, two people for obstructing police work and one more for disturbing public order.

In a statement, the City of Juárez said this operation was carried out with 41 units and 83 members from both agencies.

They want to call on all citizens to avoid street racing, describing the practice as dangerous for public safety.

Local government officials also said they are working to build “a better road culture," to reduce incidents and to create awareness and responsibility when traveling through the city.

ABC-7 reached out to the Juárez Road Safety Coordination (CGSV) to learn more about these recent trends of street racing.

The post Juarez authorities secured dozens of cars during “Operation Fast and Furious” appeared first on KVIA.

]]>
https://kvia.com/news/border/2024/07/15/juarez-authorities-secured-dozens-of-cars-during-operation-fast-and-furious/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of July 15 to 19 https://kvia.com/traffic/2024/07/15/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-15-to-19/ https://kvia.com/traffic/2024/07/15/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-15-to-19/#respond Mon, 15 Jul 2024 09:59:12 +0000 https://kvia.com/?p=1259223

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures July 15 to July 19. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click

The post Road closures in El Paso County, Las Cruces for the week of July 15 to 19 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures July 15 to July 19. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20)

Guardrail Repair

9 a.m. to 4 p.m.

Monday, July 15

  • I-10 westbound at Piedras exit closed

Tuesday, July 16

  • I-10 westbound between Chelsea and Ramp A right lane closed
  • US 54 at connector Ramp A left lane closure and Paisano on-ramp closed

Wednesday, July 17

  • Gateway West between Chelsea and Raynolds left lane and Raynolds on-ramp closed

North Mesa Street Rehabilitation Project

Sunday, July 14 through Wednesday, July 17

8 p.m. to 6 a.m. (Nightly)

  • Mesa (SH-20) northbound will be reduced to one lane from Rim Road to Glory Road / East Baltimore Drive

Thursday, July 18 through Friday, July 19

8 p.m. to 6 a.m. (Nightly)

  • Mesa (SH-20) southbound lanes will be reduced to one lane Glory Road / East Baltimore Drive to Rim Road

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential / business access locations may be temporarily shifted due to milling/paving activities.

US-62 Rehabilitation Project

Monday, July 15 through Friday, July 19

  • Montana Avenue (US-62) westbound and eastbound left lane closures Global Reach Drive/Yarbrough Drive to McRea Boulevard

Crews will be working on concrete work along the medians

North Mesa Street Lighting Improvement Project

Monday, July 15 through Thursday, July 18

9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound right lane and left lane closures Crossroads Drive to Doniphan Drive
  • Mesa (SH-20) northbound and southbound right lane closures I-10 to Crossroads Drive
  • Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Sunland Park Drive
  • Mesa (SH-20) northbound and southbound left lane closures Executive Center Boulevard to Festival Drive
  • Mesa (SH-20) northbound and southbound alternating left and right lane closures Mesita Drive/Sun Bowl Drive to Executive Center Boulevard
  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, installing new lighting poles, removing existing poles, electrical inspection, and Concrete sidewalk and landscape repairs.

Traffic Signal Improvements Project

Monday, July 15 through Friday, July 19

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures at the Resler Drive intersection
  • Montana (US-62) east and westbound right lane closures at McRae Boulevard intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Rojas Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection

Crews will be working on intersection improvements.

Monday, July 15 through Friday, July 19

6 a.m. to 6 a.m. – Continuous Closure

  • Mesa (SH-20) north and southbound alternating left lane and left turn lane closures at the Camille Drive intersection. The following turning movements will be affected (please remember southbound Mesa is toward downtown, northbound is toward the valley):
    • o Southbound Mesa to left turn to Fountain Road
    • o Southbound Mesa to northbound Mesa (U-turn) at Camille Drive intersection
    • o Southbound Mesa left turn to Maguey Place
    • o Camille Drive right turn onto northbound Mesa
    • o Northbound Mesa right turn Camille Drive
    • o Northbound Mesa to southbound Mesa (U-turn) at Camille Drive intersection
    • o Northbound Mesa to southbound (U-turn) Mesa at Maguey Place
    • o Colina Alta Dive to southbound Mesa
    • o Fountain Road to southbound Mesa
    • o Maguey Place to southbound Mesa

Crews will be working on installing a new raised median. TxDOT is working to expedite this activity and plans to open this area as soon as it is ready.

Mesa Street at Belvidere Street Improve Traffic Signals Project

Monday, July 15 through Friday, July 19

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures

Crews will be potholing and boring to line locate.

Delta/Alameda & Zaragoza/George Dieter Traffic Signal Improvement Project

Monday, July 15 through Friday, July 19

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be working on traffic signals.

Green Ribbon Project

Monday, July 15 through Friday, July 19

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be working on median improvements.

Mill/Inlay From SH-20 (Alameda) to Global Reach

Monday, July 15 through Friday, July 19

9 a.m. to 4 p.m.

  • Montana east- and westbound between Paisano and Yarbrough alternate lane closures

Crews will be milling and paving.

Maintenance

Monday, July 15 through Friday, July 19

9 a.m. to 3 p.m.

  • Spur 601 east- and westbound between Chaffee and Loop 375 lane closed

Crews will be working on shoulder.

Tuesday, July 16

9 a.m. to 3 p.m.

  • Spur 601 eastbound at Global Reach off-ramp

Crews will be working on the right shoulder.

I-10 Widening West

Monday, July 15, through Saturday, July 20

9 a.m. to 4 p.m.

  • I-10 will be reduced to one lane between Vinton Road and Transmountain Road.

Crews will be constructing retaining walls.

Monday, July 15, through Wednesday, July 17

9 a.m. to 4 p.m.

  • I-10 East will be reduced to one lane between Redd Road and North Mesa Street.

Crews will be working on drilled shafts for the new Thorn Avenue overpass.

Wednesday, July 17, through Saturday, July 20

9 a.m. to 4 p.m.

  • I-10 West will be reduced to one lane between North Mesa Street and Redd Road.
  • The on-ramp onto I-10 West after Mesa Street will be closed intermittently.

Crews will be widening the shoulder.

Montana Frontage Road Project

Monday, July 08 through Saturday, July 27

Daily, from 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street

Crews will be exporting material.

Monday, July 15 through Thursday, July 18

Daily, from 5 p.m. to 9 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road full closure between George Dieter Drive and Joe Battle Boulevard

Crews will be working on barrier arrangements.

Monday, June 17 through Wednesday, July 17

Continuous closure until further notice

  • Alba Lane full closure access to Montana Avenue (US 62/180)
  • Wooster Lane full closure access to Montana Avenue (US 62/180)
  • East Glen Drive full closure access to Montana Avenue (US 62/180)
  • Lee Boulevard full closure access to Montana Avenue (US 62/180)

Crews will be working on concrete pavement at intersections.

Monday, July 15 through Tuesday, July 16

From 9 p.m. to 5 a.m.

  • Montana Avenue (US 62/180) full closure, westbound frontage road at Lee Trevino Drive intersection.

Crews will be working on striping intersection.

Monday, July 13 through Tuesday, July 27

Daily, from 9 a.m. to 5 p.m. and 9 p.m. to 5 a.m.

  • Smoke Signal full closure access to Montana Avenue (US 62/180)

Crews will be working on prepping and pouring concrete at the intersection.

Purple Heart Loop 375 Widening

Monday, July 15 through Friday, August 09

Daily, from 9 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be working on placing asphalt in the median.

Continuous closure until further notice

  • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601.

Crews will be widening main lanes and constructing north- and southbound frontage road.

Loop 375 Widening Project

Monday, July 15 through Thursday, July 18

Nightly, 9 p.m. until 5 a.m.

  • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Bridge Overpass and Zaragoza (P.O.E) Bridge Overpass

Crews will be working on installing bridge structures.

SH 20 Raised Medians Project

Monday, July 15 through Friday, July 19

Daily, 8 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east- and westbound inside lane closures between Rio Vista Boulevard and Passmore Road

Crews will be performing boring operations and installing concrete medians and driveways.

SL 375 Mill & Inlay Project

Sunday, July 14 through Thursday, July 18

Nightly, 9 p.m. to 6 a.m.

  • SL 375 (Joe Battle Boulevard) north- and southbound alternating right and left lane closures between Pellicano Drive and Montana Avenue

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

The post Road closures in El Paso County, Las Cruces for the week of July 15 to 19 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/07/15/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-15-to-19/feed/ 0 ]]>
Power out for hundreds in East El Paso after crash knocks down light pole https://kvia.com/news/top-stories/2024/07/13/power-out-for-hundreds-in-east-el-paso-after-crash-knocks-down-light-pole/ https://kvia.com/news/top-stories/2024/07/13/power-out-for-hundreds-in-east-el-paso-after-crash-knocks-down-light-pole/#respond Sat, 13 Jul 2024 23:00:58 +0000 https://kvia.com/?p=1258635

EL PASO, Texas (KVIA) - About 630 customers in East El Paso have no power at this time after a vehicle crashed into a light pole along Montana and Lockheed. It happened about 4 p.m. Saturday. No word on any injuries. El Paso Electric says crews have been working to restore power. The outage caused

The post Power out for hundreds in East El Paso after crash knocks down light pole appeared first on KVIA.

]]>

EL PASO, Texas (KVIA) - About 630 customers in East El Paso have no power at this time after a vehicle crashed into a light pole along Montana and Lockheed.

It happened about 4 p.m. Saturday.

No word on any injuries.

El Paso Electric says crews have been working to restore power.

The outage caused street lights to go out. A second crash was reported at Montana and Hawkins.

This is a developing story and will be updated as information becomes available.

The post Power out for hundreds in East El Paso after crash knocks down light pole appeared first on KVIA.

]]>
https://kvia.com/news/top-stories/2024/07/13/power-out-for-hundreds-in-east-el-paso-after-crash-knocks-down-light-pole/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of July 8 to July 12 https://kvia.com/traffic/2024/07/08/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-8-to-july-12/ https://kvia.com/traffic/2024/07/08/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-8-to-july-12/#respond Mon, 08 Jul 2024 11:19:26 +0000 https://kvia.com/?p=1255993

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures July 8 to July 12. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information

The post Road closures in El Paso County, Las Cruces for the week of July 8 to July 12 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures July 8 to July 12. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

Guardrail Repair

Monday, July 8

  • South Desert to North Desert turnaround at Valley Chili closed

North Mesa Street Rehabilitation Project

Sunday, July 7 through Wednesday, July 10

8 p.m. to 6 a.m. (Nightly)

  • Mesa (SH-20) northbound will be reduced to one lane from Yandell Drive to Rim Road
  • Mesa (SH-20) southbound will be reduced to one lane from East Crosby Avenue to East Cliff Drive

Thursday, July 11 through Friday, July 12

8 p.m. to 6 a.m. (Nightly)

  • Mesa (SH-20) northbound and southbound lanes will be reduced to one outside lane from Yandell Drive to Rim Road

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential / business access locations may be temporarily shifted due to milling/paving activities.

North Mesa Street Lighting Improvement Project

Monday, July 8 through Friday, July 12

9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Sunland Park Drive
  • Mesa (SH-20) northbound and southbound left lane closures Castellano Drive to Executive Center Boulevard
  • Mesa (SH-20) northbound and southbound alternating left and right lane closures Executive Center Boulevard to Mesita Drive/Sun Bowl Drive
  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, and installing new lighting poles.

Traffic Signal Improvements Project

Monday, July 8 through Friday, July 12

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures at the Resler Drive intersection
  • Montana (US-62) east and westbound right lane closures at McRae Boulevard intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Rojas Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection

Monday, July 1 through Friday, July 12

6 a.m. to 6 a.m. – Continuous Closure

  • Mesa (SH-20) north and southbound alternating left lane and left turn lane closures at the Camille Drive intersection. The following turning movements will be affected (please remember southbound Mesa is toward downtown, northbound is toward the valley):
    • Southbound Mesa to left turn to Fountain Road
    • Southbound Mesa to northbound Mesa (U-turn) at Camille Drive intersection
    • Southbound Mesa left turn to Maguey Place
    • Camille Drive right turn onto northbound Mesa
    • Northbound Mesa right turn Camille Drive
    • Northbound Mesa to southbound Mesa (U-turn) at Camille Drive intersection
    • Northbound Mesa to southbound (U-turn) Mesa at Maguey Place
    • Colina Alta Dive to southbound Mesa
    • Fountain Road to southbound Mesa
    • Maguey Place to southbound Mesa

Crews will be working on installing a new raised median. TxDOT is working to expedite this activity and plans to open this area as soon as it is ready, possibly before July 12.

Delta/Alameda & Zaragoza/George Dieter Traffic Signal Improvement Project

Monday, July 1 through Friday, July 12

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda and Delta intersection alternate lane closures

Crews will be working on traffic signals.

Green Ribbon Project

Monday, July 1 through Friday, July 12

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be working on median improvements.

Mill/Inlay From SH-20 (Alameda) to Global Reach

Monday, July 1 through Friday, July 12

9 a.m. to 4 p.m.

  • Montana east- and westbound between Paisano and Yarbrough alternate lane closures

Crews will be milling and paving.

Maintenance

Monday, July 1 through Friday, July 12

9 a.m. to 3 p.m.

  • Spur 601 east- and westbound between Chaffee and Loop 375 lane closed

Crews will be working on shoulder.

Montana Frontage Road Project

Monday, July 08 through Saturday, July 27

Daily, from 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street

Crews will be exporting material.

Monday, July 15 through Thursday, July 18

Daily, from 5 p.m. to 9 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road full closure between George Dieter Drive and Joe Battle Boulevard

Crews will be working on barrier arrangements.

Monday, June 17 through Wednesday, July 17

Continuous closure until further notice

  • Alba Lane full closure access to Montana Avenue (US 62/180)
  • Wooster Lane full closure access to Montana Avenue (US 62/180)
  • East Glen Drive full closure access to Montana Avenue (US 62/180)
  • Lee Boulevard full closure access to Montana Avenue (US 62/180)

Crews will be working on concrete pavement at intersections.

Purple Heart Loop 375 Widening

Saturday, June 29 through Sunday, July 28

Daily, from 9 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be hauling out material in and out of the median.

Continuous closure until further notice

  • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601.

Crews will be widening main lanes and constructing north- and southbound frontage road.

Loop 375 Widening Project

Monday, July 08 through Thursday, July 11

Nightly, 9 p.m. until 5 a.m.

  • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Bridge Overpass and Zaragoza (P.O.E) Bridge Overpass

Crews will be working on installing bridge structures.

SH 20 Raised Medians Project

Monday, July 08 through Friday, July 12

Daily, 9 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east- and westbound inside lane closures between Horizon Boulevard and Passmore Road

Crews will be performing boring operations.

SL 375 Mill & Inlay Project

Sunday, July 07 through Thursday, July 11

Nightly, 9 p.m. to 6 a.m.

  • SL 375 (Joe Battle Boulevard) north- and southbound alternating right and left lane closures between Pellicano Drive and Montana Avenue

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

The post Road closures in El Paso County, Las Cruces for the week of July 8 to July 12 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/07/08/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-8-to-july-12/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of July 1 to 5 https://kvia.com/traffic/2024/07/01/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-1-to-5/ https://kvia.com/traffic/2024/07/01/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-1-to-5/#respond Mon, 01 Jul 2024 10:25:04 +0000 https://kvia.com/?p=1253874

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures July 1 to July 5. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information

The post Road closures in El Paso County, Las Cruces for the week of July 1 to 5 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures July 1 to July 5. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

I-10 Widening West

Monday, July 1

9 p.m. to 5 a.m.

  • South Desert Boulevard will be closed at Redd Road

DETOUR: Turn right on Redd Road, left on Doniphan Drive, left on Mesa Street and continue onto South Desert Boulevard.

Crews will be installing barriers.

Tuesday, July 2

9 p.m. to 5 a.m.

  • North Desert Boulevard will be closed at Thorn Avenue

DETOUR: Turn left on Mesa Street, right on Doniphan Drive, right on Redd Road, and continue onto North Desert Boulevard. Access to neighborhood for local traffic only.

Crews will be installing barriers.

Daily Lane Closure

Monday, July 1, through Wednesday, July 3

9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road.

Crews will be constructing retaining walls.

Guardrail Repair

9 a.m. to 4 p.m.

Monday, July 1

  • I-10 West connector to Loop 375/Juarez (Ramp F) closed
  • I-10 West connector to US-54 North (Ramp A) left lane closed

Tuesday, July 2

  • US-54 CD lanes southbound entrance ramp to US-54 South between Altura and Trowbridge ramp closed

Wednesday, July 3

  • Loop 375 (Border Highway) westbound between Yarbrough and Midway right lane closed

Friday, July 5

  • Loop 375 (Transmountain) eastbound between Main Gap and Border Patrol Museum left lane closed

Monday, July 8

  • South Desert to North Desert turnaround at Valley Chili closed

North Mesa Street Rehabilitation Project

Monday, July 1 through Tuesday, July 2

9 a.m. to 4 p.m. (Daily)

  • Mesa (SH-20) alternating northbound and southbound lane closures Camille Drive to I-10

Crews will be working on pouring manhole aprons.

North Mesa Street Lighting Improvement Project

Monday, July 1 through Wednesday, July 3

9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Sunland Park Drive
  • Mesa (SH-20) northbound and southbound left lane closures Castellano Drive to Executive Center Boulevard
  • Mesa (SH-20) northbound and southbound alternating left and right lane closures Executive Center Boulevard to Mesita Drive/Sun Bowl Drive
  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, and installing new lighting poles.

Traffic Signal Improvements Project

Monday, July 1 through Tuesday, July 2

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures at the Resler Drive intersection
  • Montana (US-62) east and westbound right lane closures at McRae Boulevard intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Rojas Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection

Crews will be working on intersection improvements.

Monday, July 1 through Friday, July 12

6 a.m. to 6 a.m. – Continuous Closure

  • Mesa (SH-20) north and southbound alternating left lane and left turn lane closures at the Camille Drive intersection. The following turning movements will be affected (please remember southbound Mesa is toward downtown, northbound is toward the valley):
    • Southbound Mesa to left turn to Fountain Road
    • Southbound Mesa to northbound Mesa (U-turn) at Camille Drive intersection
    • Southbound Mesa left turn to Maguey Place
    • Camille Drive right turn onto northbound Mesa
    • Northbound Mesa right turn Camille Drive
    • Northbound Mesa to southbound Mesa (U-turn) at Camille Drive intersection
    • Northbound Mesa to southbound (U-turn) Mesa at Maguey Place
    • Colina Alta Dive to southbound Mesa
    • Fountain Road to southbound Mesa
    • Maguey Place to southbound Mesa

Crews will be working on installing a new raised median. TxDOT is working to expedite this activity and plans to open this area as soon as it is ready, possibly before July 12.

Delta/Alameda & Zaragoza/George Dieter Traffic Signal Improvement Project

Monday, July 1 through Friday, July 12

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda and Delta intersection alternate lane closures

Crews will be working on traffic signals.

Green Ribbon Project

Monday, July 1 through Friday, July 12

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be working on median improvements.

Mill/Inlay From SH-20 (Alameda) to Global Reach

Monday, July 1 through Friday, July 12

9 a.m. to 4 p.m.

  • Montana east- and westbound between Paisano and Yarbrough alternate lane closures

Crews will be milling and paving.

Maintenance

Monday, July 1 through Friday, July 12

9 a.m. to 3 p.m.

  • Spur 601 east- and westbound between Chaffee and Loop 375 lane closed

Crews will be working on shoulder.

Monday, July 01 through Tuesday, July 02

From 9 p.m. to 5 a.m.

  • Montana Avenue (US 62/180) westbound frontage road, alternating lane closures between Lee Trevino Drive and Global Reach Drive

Crews will be working on striping.

Purple Heart Loop 375 Widening

Saturday, June 29 through Sunday, July 28

Daily, from 9 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be hauling out material in and out of the median.

Continuous closure until further notice

  • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601.

Crews will be widening main lanes and constructing north- and southbound frontage road.

Loop 375 Widening Project

Monday, July 01 through Wednesday, July 03

Nightly, 9 p.m. until 5 a.m.

  • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Bridge Overpass and Zaragoza (P.O.E) Bridge Overpass

Crews will be working on installing bridge structures.

Monday, July 08 through Thursday, July 11

Nightly, 9 p.m. until 5 a.m.

  • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Bridge Overpass and Zaragoza (P.O.E) Bridge Overpass

Crews will be working on installing bridge structures.

SH 20 Raised Medians Project

Monday, July 01 through Wednesday, July 03

Daily, 9 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east- and westbound inside lane closures between Horizon Boulevard and Passmore Road

Crews will be performing boring operations.

Monday, July 08 through Friday, July 12

Daily, 9 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east- and westbound inside lane closures between Horizon Boulevard and Passmore Road

Crews will be performing boring operations.

SL 375 Mill & Inlay Project

Sunday, June 30 through Tuesday, July 02

Nightly, 9 p.m. to 6 a.m.

  • SL 375 (Joe Battle Boulevard) north- and southbound alternating right and left lane closures between Pellicano Drive and Montana Avenue

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

Sunday, July 07 through Thursday, July 11

Nightly, 9 p.m. to 6 a.m.

  • SL 375 (Joe Battle Boulevard) north- and southbound alternating right and left lane closures between Pellicano Drive and Montana Avenue

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

US 62/180 Mill and Inlay

Monday, July 01

From 9 a.m. to 4 p.m.

  • US 62/180 (Montana Avenue) westbound frontage road, alternating lane closures from Hueco Club Road to Rich Beem Boulevard

Crews will be working on pavement operations.

The post Road closures in El Paso County, Las Cruces for the week of July 1 to 5 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/07/01/road-closures-in-el-paso-county-las-cruces-for-the-week-of-july-1-to-5/feed/ 0 ]]>
I-10 road closures may cause traffic delays https://kvia.com/news/el-paso/2024/06/28/i-10-road-closures-may-cause-a-traffic-delays/ https://kvia.com/news/el-paso/2024/06/28/i-10-road-closures-may-cause-a-traffic-delays/#respond Sat, 29 Jun 2024 04:44:14 +0000 https://kvia.com/?p=1253395

EL PASO, Texas (KVIA)-- Due to the demolition of the Thorn avenue bridge, I-10 west and eastbound will be closed from Friday at 9 p.m. until Monday at 5 a.m. During the closure drivers will have to exit using Red Rd. if they are traveling eastbound and Mesa St. if they are traveling westbound. Once

The post I-10 road closures may cause traffic delays appeared first on KVIA.

]]>

EL PASO, Texas (KVIA)-- Due to the demolition of the Thorn avenue bridge, I-10 west and eastbound will be closed from Friday at 9 p.m. until Monday at 5 a.m.

During the closure drivers will have to exit using Red Rd. if they are traveling eastbound and Mesa St. if they are traveling westbound. Once I-10 reopens, Thorn avenue will still be under construction as they build a new and improved replacement.

According to Jonathan Concha, P.E. West Area Engineer the bridge will be taller to meet new requirements on the interstate. The bridge will also be wider to accommodate additional lanes and access for pedestrians.

Many establishments along I-10 may see a decrease is foot traffic this weekend. I spoke with John Tran, manager at Lush Nail Lounge El Paso, he says the weekends are normally their busy days but they are preparing for things to be slower this weekend.

Trans says locals who know their way around the city may use Doniphan or Resler as an alternative route. Which ever route you decide to take we recommend planning ahead to assure you get to your destination on time.

The post I-10 road closures may cause traffic delays appeared first on KVIA.

]]>
https://kvia.com/news/el-paso/2024/06/28/i-10-road-closures-may-cause-a-traffic-delays/feed/ 0 ]]>
Family members of girls killed in Juarez react to car accident https://kvia.com/news/border/2024/06/27/family-members-of-girls-killed-in-juarez-react-to-car-accident/ https://kvia.com/news/border/2024/06/27/family-members-of-girls-killed-in-juarez-react-to-car-accident/#respond Fri, 28 Jun 2024 01:41:44 +0000 https://kvia.com/?p=1253026

JUAREZ, Chihuahua (KVIA) -- Today, two of the three girls killed in a car crash in Juárez were laid to rest. 45-year-old Henry Raygoza from El Paso is accused of causing the deadly crash. 13-year-old Ashley Daniela, 14-year-old Ixchel Angelica, and 16-year-old Nemesis Gisel died on Monday. Ashley and Angelica were buried today in South

The post Family members of girls killed in Juarez react to car accident appeared first on KVIA.

]]>

JUAREZ, Chihuahua (KVIA) -- Today, two of the three girls killed in a car crash in Juárez were laid to rest. 45-year-old Henry Raygoza from El Paso is accused of causing the deadly crash.

13-year-old Ashley Daniela, 14-year-old Ixchel Angelica, and 16-year-old Nemesis Gisel died on Monday.

Ashley and Angelica were buried today in South Juárez, accompanied by several family members.

Canal 44 in Juárez is reporting Nemesis' family is waiting to give the final goodbye to her because her mom remains hospitalized in Juárez's General Hospital due to the crash.

Chihuahua investigators say Raygoza was driving a black jeep that rear-ended a blue car the girls were in. It ended on the other side of the road, and a semi-truck crashed into it.

Canal 44 also reported the family traveling in the blue car was heading to buy dresses for a 'quinceañera' that was supposed to happen this Saturday. The two people who survived remain hospitalized in critical condition.

Raygoza was speeding because he was driving away from another crash while intoxicated; he tested positive for cocaine and marijuana.

Juárez Mayor Cruz Pérez Cuéllar was asked his thoughts on this fatal crash.

"I think that despite the terrible nature of the tragedy, it is good that he is being detained, I would prefer that he pays for what he did here in Mexico," Mayor Pérez Cuéllar said.

A judge in Juárez has scheduled a court hearing for Raygoza on Monday.

The post Family members of girls killed in Juarez react to car accident appeared first on KVIA.

]]>
https://kvia.com/news/border/2024/06/27/family-members-of-girls-killed-in-juarez-react-to-car-accident/feed/ 0 ]]>
ABC-7 at 4 Traffic Alert: I-10 Widening Project https://kvia.com/traffic/2024/06/24/abc-7-at-4-traffic-alert-i-10-widening-project/ https://kvia.com/traffic/2024/06/24/abc-7-at-4-traffic-alert-i-10-widening-project/#respond Mon, 24 Jun 2024 14:50:32 +0000 https://kvia.com/?p=1251848

El Paso, TX ( KVIA)- Major changes will come to I-10 West this week. A 49-hour closure will be in place beginning Monday, June 24: I-10 West will open two lanes from Redd Road to just south of Transmountain Road. The new permanent westbound Exit 6A (Loop 375/Spur 16/Transmountain Road) will open about ½ miles

The post ABC-7 at 4 Traffic Alert: I-10 Widening Project appeared first on KVIA.

]]>

El Paso, TX ( KVIA)- Major changes will come to I-10 West this week. A 49-hour closure will be in place beginning Monday, June 24:

  • I-10 West will open two lanes from Redd Road to just south of Transmountain Road.
  • The new permanent westbound Exit 6A (Loop 375/Spur 16/Transmountain Road) will open about ½ miles south of the temporary exit, which will close.
  • The current westbound Exit 9 (Redd Road) will close permanently. A new Redd Road exit will be built further south. Traffic heading to Redd Road will use SH 20/Mesa Street/Thorn Avenue (Exit 11) and North Desert Boulevard.

Rest assured, a second weekend-long closure is scheduled the following weekend to demolish the Thorn Avenue overpass. I-10 East and West will be closed at Thorn from 9 p.m. on Friday, June 28, until 5 a.m. on Monday, July 1. Eastbound traffic will take Exit 9 (Redd Road) to South Desert Boulevard and re-enter I-10 past Mesa Street. Westbound traffic will take Exit 11 (SH 20/Mesa Street/Thorn Avenue) to North Desert Boulevard and re-enter I-10 past Transmountain Road.

While I-10 will re-open to traffic the morning of July 1, Thorn Avenue between North Desert Boulevard and South Desert Boulevard will remain closed until Spring 2025. Bypass lanes will be built in each direction below the overpass, allowing traffic on North Desert Boulevard and South Desert Boulevard to avoid the traffic signals at Thorn Avenue.

About I-10 Widening West

I-10 Widening West, a project that holds promise for the future of your commute, will expand and improve Interstate 10 in West El Paso County. The project will widen I-10 from two lanes in each direction to three between North Mesa Street and the Texas-New Mexico state line. The project also reconfigures the location of onramps and offramps and add wrong way driver detection systems.

The post ABC-7 at 4 Traffic Alert: I-10 Widening Project appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/06/24/abc-7-at-4-traffic-alert-i-10-widening-project/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of June 24 to 28 https://kvia.com/traffic/2024/06/24/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-24-to-28/ https://kvia.com/traffic/2024/06/24/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-24-to-28/#respond Mon, 24 Jun 2024 09:31:00 +0000 https://kvia.com/?p=1251606

EL PASO, Texas -- Construction season is in full swing across the Borderland this week, with projects spanning from West El Paso to Southern New Mexico. Here is the list of closures for June 24 to 28, stay informed with TxDOT's latest road closures and updates here as you plan your travels. Drive safely! I-10

The post Road closures in El Paso County, Las Cruces for the week of June 24 to 28 appeared first on KVIA.

]]>

EL PASO, Texas -- Construction season is in full swing across the Borderland this week, with projects spanning from West El Paso to Southern New Mexico. Here is the list of closures for June 24 to 28, stay informed with TxDOT's latest road closures and updates here as you plan your travels. Drive safely!

I-10 Widening West Project

49-hour closure

Saturday, June 22 at 4 a.m., through Monday, June 24 at 5 a.m.

  • I-10 West will be closed from North Mesa Street to Transmountain Road

DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert Boulevard, re-enter I-10 past Transmountain Road.

Crews will be restriping the roadway to open a second westbound lane on I-10

Beginning on Monday, June 24, at 5 a.m.

  • I-10 West will be open to two lanes of traffic from North Mesa Street to south of Transmountain Road
  • I-10 West will remain open to one lane from South of Transmountain Road to Enchanted Hills Drive.

Beginning on Monday, June 24 at 5 a.m.

  • The new permanent Loop 375/Spur 16/Transmountain Road exit from I-10 West will open.
  • The old temporary exit will close permanently

NOTE: The permanent exit is approximately ½ mile before the temporary exit.

Beginning Monday, June 24, at 5 a.m.

  • The Redd Road exit from I-10 West will close permanently.

DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert Boulevard, turn left or right on Redd Road.

Crews will begin removing the existing ramp.

Daily Lane Closure

Monday, June 24, through Saturday, June 29

9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road.

Crews will be constructing retaining walls.

56-hour closure

Friday, June 28 at 9 p.m., through Monday, July 1 at 5 a.m.

  • I-10 East and West will be closed at Thorn Avenue.
  • EASTBOUND DETOUR: Take Exit 9 (Redd Road), continue on South Desert Boulevard, re-enter I-10 past Mesa Street
  • WESTBOUND DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert Boulevard, re-enter I-10 past Transmountain Road.

Crews will be demolishing the Thorn Avenue overpass. 

Beginning Friday, June 28, at 9 p.m. and continuing through Spring 2025

  • Thorn Avenue will be closed between North Desert Boulevard and South Desert Boulevard.

Crews will be construction a new Thorn Avenue overpass.

North Mesa Street Rehabilitation Project

9 p.m. to 6 a.m. (Nightly)

  • Nighttime milling and paving operations have been completed for Sunland Park Drive to Doniphan Drive. No nighttime closures are expected.

9 a.m. to 4 p.m. (Daily)

  • Monday, June 24 – Mesa (SH-20) alternating northbound and southbound right lane and left lane closures Colony Cove Court to Doniphan Drive
  • Tuesday, June 25 – Mesa (SH-20) alternating northbound and Southbound right lane and left lane closures Colony Cove Court to I-10
  • Wednesday, June 26 – Mesa (SH-20) alternating northbound and Southbound right lane and left lane closures Colony Cove Court to I-10
  • Thursday, June 27 – Mesa (SH-20) alternating northbound and Southbound right lane and left lane closures Colony Cove Court to I-10
  • Friday, June 28 – Mesa (SH-20) alternating northbound and Southbound right lane and left lane closures Colony Cove Court to I-10

Crews will be milling and paving.

North Mesa Street Lighting Improvement Project

Monday, June 24 through Friday, June 28

9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound right and left lane closures Mesa Hills Drive to Sunland Park Drive
  • Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Mesa Hills Drive
  • Mesa (SH-20) northbound and southbound left lane closures Castellano Drive to Executive Center Boulevard
  • Mesa (SH-20) northbound and southbound alternating left and right lane closures Executive Center Boulevard to Mesita Drive/Sun Bowl Drive
  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, and installing new lighting poles.

Traffic Signal Improvements Project

Monday, June 24 through Friday, June 28

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures at the Resler Drive intersection
  • Montana (US-62) east and westbound right lane closures at McRae Boulevard intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Rojas Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection

Crews will be working on intersection improvements.

Monday, June 24 through Friday, June 28

6 a.m. to 6 a.m. – Continuous Closure

  • Mesa (SH-20) north and southbound alternating left lane and left turn lane closures at the Camille Drive intersection. The following turning movements will be affected (please remember southbound Mesa is toward downtown, northbound is toward the valley):
    • Southbound Mesa to left turn to Fountain Road
    • Southbound Mesa to northbound Mesa (U-turn) at Camille Drive intersection
    • Southbound Mesa left turn to Maguey Place
    • Camille Drive right turn onto northbound Mesa
    • Northbound Mesa right turn Camille Drive
    • Northbound Mesa to southbound Mesa (U-turn) at Camille Drive intersection
    • Northbound Mesa to southbound (U-turn) Mesa at Maguey Place
    • Colina Alta Dive to southbound Mesa
    • Fountain Road to southbound Mesa
    • Maguey Place to southbound Mesa

Crews will be working on installing a new raised median.

Monday, June 24 through Friday, June 28

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda and Delta intersection alternate lane closures

Crews will be working on traffic signals.

Green Ribbon Project

Monday, June 24 through Friday, June 28

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be working on median improvements.

Mill/Inlay From SH-20 (Alameda) to Global Reach

Monday, June 24 through Friday, June 28

  • Montana east- and westbound between Hawkins and Yarbrough left lane closed

Crews will be milling and paving.

Guardrail Repair

Monday, June 24

9 a.m. to 4 p.m.

  • Loop 375 (Border Highway) westbound between Yarbrough and Midway right lane closed
  • Loop 375 (Border Highway) westbound between US-54 connector and Paisano right lane closed
  •  

Tuesday, June 25

9 a.m. to 4 p.m. 

  • I-10 eastbound between Sunland Park and Mesa Park

Crews will be repairing guardrail.

Maintenance

Sunday, June 23

4:30 a.m. to 5 p.m.

  • I-10 West between Cotton and Brown three right lanes closed

Crews will be working on spalls.

Monday, June 24 through Friday, June 28

9 a.m. to 3 p.m.

  • Loop 375 (Border Highway) westbound between Zaragoza and Midway right lane closed
  • Spur 601 eastbound between Chaffee and Constitution right lane closed

Crews will be working on shoulder.

Montana Widening Project

Monday, June 03 through Saturday, June 29

Daily, from 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street

Crews will be exporting material.

Monday, June 24 through Saturday, June 29

Daily, from 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) westbound frontage road left lane closure between Global Reach Drive and ICE Building

Crews will be working on exporting material, removing barrier and striping.

Monday, June 17 through Wednesday, July 17

Continuous closure until further notice

  • Alba Lane full closure access to Montana Avenue (US 62/180)
  • Wooster Lane full closure access to Montana Avenue (US 62/180)
  • East Glen Drive full closure access to Montana Avenue (US 62/180)
  • Lee Boulevard full closure access to Montana Avenue (US 62/180)

Crews will be working on concrete pavement at intersections.

Purple Heart Loop 375 Widening

Saturday, June 01 through Sunday, June 30

Daily, from 9 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be hauling out material in and out of the median.

Continuous closure until further notice

  • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601.

Crews will be widening main lanes and constructing north- and southbound frontage road.

Loop 375 Widening Project

Monday, June 24 through Thursday, June 27

Nightly, 9 p.m. until 5 a.m.

  • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Bridge Overpass and Zaragoza (P.O.E) Bridge Overpass

Crews will be working on installing bridge structures.

Continuous closure until 5 a.m. Sunday, June 30

  • Americas Avenue (frontage road) northbound between Joe Rodriguez Road and South Side Road, right lane

Crews will be securing roadway until required asphalt repair work is complete and drainage utilities installation.

SH 20 Raised Medians Project

Monday, June 24 through Friday, June 28

Daily, 9 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east- and westbound inside lane closures between Horizon Boulevard and Oden Drive or from Orden Drive to Bovee Road

Crews will be performing boring operations.

Loop 375 Mill & Inlay Project

Sunday, June 23 through Thursday, June 27

Nightly, 9 p.m. to 6 a.m.

  • SL 375 (Joe Battle Boulevard) north- and southbound alternating right and left lane closures between Pellicano Drive and Montana Avenue

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

I-10 Widening East

Saturday, June 22 through Saturday, June 29

Daily, 9 a.m. to 3:30 p.m.

  • I-10 East alternating left and right shoulder closure between Eastlake Boulevard and Horizon Boulevard
  • Gateway East alternating left and right lane closures between Eastlake Boulevard and Horizon Boulevard

Daily, from 9 a.m. to 4 p.m.

  • I-10 West alternating left and right shoulder between Eastlake Boulevard and Horizon Boulevard
  • Gateway West alternating left and right lane closures between Eastlake Boulevard and Horizon Boulevard

Crews will be working on replacing signs and repairing guardrail.

Horizon (FM1281)/Darrington Reconstruction Project

Monday, March 25 until further notice

  • Horizon Boulevard (FM1281) westbound lane closure from Torrey Pines to Desert Mesa Drive, lanes to be reduced to one lane
  • Horizon Boulevard (FM1281) hike/bike trail from Torrey Pines to Desert Mesa Drive will be closed indefinitely
  • Driveways on Horizon Boulevard (FM 1281) to Briarwood Townhomes, Town Hall, Starbucks, and Tacos El Charly will be re-opened

Friday, June 28 until further notice

  • Horizon Boulevard (FM 1281) and Lago Del Este intersection closure

Crews will be reconstructing driveways, constructing shared use paths, working on final subgrade, and excavating for ponding areas.

Thursday, June 27 through Friday, June 28

From 9:00 p.m. to 6:00 a.m.

  • Horizon Boulevard (FM 1281) full closure from Kenazo Avenue to Thea Smith Drive

Crews will be working on traffic switch.

The post Road closures in El Paso County, Las Cruces for the week of June 24 to 28 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/06/24/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-24-to-28/feed/ 0 ]]>
One person hospitalized after I-10 crash in El Paso https://kvia.com/traffic/2024/06/23/one-person-hospitalized-after-i-10-crash-causing-minor-backup/ https://kvia.com/traffic/2024/06/23/one-person-hospitalized-after-i-10-crash-causing-minor-backup/#respond Sun, 23 Jun 2024 08:43:48 +0000 https://kvia.com/?p=1251565

Update: All lanes have been cleared. EL PASO, Texas (KVIA) -- One person is in the hospital with minor injuries following a crash on the westbound lanes of I-10 near Paisano, according to police. The crash closed the right three lanes and the Trowbridge ramp, causing a minor backup in the area.

The post One person hospitalized after I-10 crash in El Paso appeared first on KVIA.

]]>

Update: All lanes have been cleared.


EL PASO, Texas (KVIA) -- One person is in the hospital with minor injuries following a crash on the westbound lanes of I-10 near Paisano, according to police.

The crash closed the right three lanes and the Trowbridge ramp, causing a minor backup in the area.

The post One person hospitalized after I-10 crash in El Paso appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/06/23/one-person-hospitalized-after-i-10-crash-causing-minor-backup/feed/ 0 ]]>
Police say motorcycle crash leaves one person with serious injuries https://kvia.com/news/abc-7-alert-center/2024/06/23/police-say-motorcycle-crash-leaves-one-person-with-serious-injuries/ https://kvia.com/news/abc-7-alert-center/2024/06/23/police-say-motorcycle-crash-leaves-one-person-with-serious-injuries/#respond Sun, 23 Jun 2024 07:36:12 +0000 https://kvia.com/?p=1251552

EL PASO, Texas (KVIA) - El Paso Police say a motorcycle crash in East El Paso left the driver with serious injuries Saturday evening. It happened about 7:40 p.m. Saturday at Edgemere and Sisal. Special Traffic Investigators responded to the area to investigate the cause of the crash. El Paso Police did not release the

The post Police say motorcycle crash leaves one person with serious injuries appeared first on KVIA.

]]>

EL PASO, Texas (KVIA) - El Paso Police say a motorcycle crash in East El Paso left the driver with serious injuries Saturday evening.

It happened about 7:40 p.m. Saturday at Edgemere and Sisal.

Special Traffic Investigators responded to the area to investigate the cause of the crash.

El Paso Police did not release the identity of the driver.

We will update this story on air and online as information is provided by police.

The post Police say motorcycle crash leaves one person with serious injuries appeared first on KVIA.

]]>
https://kvia.com/news/abc-7-alert-center/2024/06/23/police-say-motorcycle-crash-leaves-one-person-with-serious-injuries/feed/ 0 ]]>
Crash on Loop 375 in the Lower Valley cleared https://kvia.com/traffic/2024/06/17/crash-on-loop-375-in-the-lower-valley-causing-miles-long-traffic-jam/ https://kvia.com/traffic/2024/06/17/crash-on-loop-375-in-the-lower-valley-causing-miles-long-traffic-jam/#respond Mon, 17 Jun 2024 23:43:45 +0000 https://kvia.com/?p=1249626

Update: The crash has been cleared and the traffic backup resolved. EL PASO, Texas (KVIA) -- A crash on Loop 375 near the Balsam exit is blocking traffic and causing a backup along the highway, all the way into Downtown El Paso. The Texas Department of Transportation alert page shows the crash is blocking a

The post Crash on Loop 375 in the Lower Valley cleared appeared first on KVIA.

]]>

Update: The crash has been cleared and the traffic backup resolved.


EL PASO, Texas (KVIA) -- A crash on Loop 375 near the Balsam exit is blocking traffic and causing a backup along the highway, all the way into Downtown El Paso.

The Texas Department of Transportation alert page shows the crash is blocking a shoulder and two lanes of the highway. Two other lanes, as well as the exit ramp, remain open.

The crash happened at 4:55 PM today, according to the alert page. The clearing time is unknown.

Use an alternative route if you normally use this part of Loop 375 to get home. Use the ABC-7 Traffic Tracker to get home.

ABC-7 is working to learn more about what led up to the crash and when it will be cleared.

The post Crash on Loop 375 in the Lower Valley cleared appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/06/17/crash-on-loop-375-in-the-lower-valley-causing-miles-long-traffic-jam/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of June 17 to 21 https://kvia.com/traffic/2024/06/17/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-17-to-21/ https://kvia.com/traffic/2024/06/17/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-17-to-21/#respond Mon, 17 Jun 2024 10:35:46 +0000 https://kvia.com/?p=1249378

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures June 17 to June 21. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click

The post Road closures in El Paso County, Las Cruces for the week of June 17 to 21 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures June 17 to June 21. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

Guardrail Repair

9 a.m. to 4 p.m.

Monday, June 17

  • Loop 375 (Transmountain) westbound between Border Patrol Museum and Main Gap left lane closed.

Tuesday, June 18

  • Loop 375 (Border Highway) eastbound between Midway and Yarbrough right lane closed.
  • Loop 375 (Border Highway) westbound between I-110 and Paisano right lane closed.

Wednesday, June 19

  • I-10 westbound between Sunland Park and Resler right lane closed.
  • Desert North turnaround to Desert South at Vinton closed.

Thursday, June 20

  • I-10 East at Paisano/Chelsea exit ramp closed.
  • Gateway West at Raynolds left lane closed.

Crews will be repairing guardrail.

Miscellaneous Concrete Repair

Wednesday, June 19 through Friday, June 21

9 a.m. to 4 p.m.

· US-54 northbound at Sun Valley exit ramp closed.

Crews will be working on the concrete traffic barrier.

North Mesa Street Rehabilitation Project

9 p.m. to 6 a.m. (Overnight)

  • Sunday, June 16 – Mesa (SH-20) southbound middle lane and right lane closures Doniphan to I-10
  • Monday, June 17 – Mesa (SH-20) southbound middle lane and left lane closures Doniphan to I-10
  • Tuesday, June 18 – Mesa (SH-20) southbound middle lane and left lane closures Doniphan to I-10
  • *As Needed Wednesday, June 19 – Mesa (SH-20) alternating northbound and southbound lane closures I-10 to Doniphan

9 a.m. to 4 p.m. (Daily)

  • Monday, June 17 – Mesa (SH-20) southbound middle lane and right lane closures Doniphan to I-10
  • Tuesday, June 18 – Mesa (SH-20) southbound middle lane and left lane closures Doniphan to I-10
  • Wednesday, June 19 – Mesa (SH-20) southbound middle lane and left lane closures Doniphan to I-10
  • Thursday, June 20 – Mesa (SH-20) southbound middle lane and right lane closures Doniphan to I-10
  • Friday, June 21 – Mesa (SH-20) southbound middle lane and right lane closures Doniphan to I-10

Crews will be milling and paving.

North Mesa Street Lighting Improvement Project

Monday, June 17 through Friday, June 21

9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound right and left lane closures Festival Drive to Mesa Hills Drive
  • Mesa (SH-20) northbound and southbound left lane closures Castellano Drive to Executive Center Boulevard
  • Mesa (SH-20) north and southbound alternating left and right lane closures Executive Center Boulevard to Mesita Drive/Sun Bowl Drive
  • Mesa (SH-20) north and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, and installing new lighting poles.

North Mesa Traffic Signal Improvements Project

Monday, June 17 through Friday, June 21

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures at the Resler Drive intersection
  • Mesa (SH-20) north and southbound right lane closures at the Camille Drive intersection
  • Montana (US-62) east and westbound right lane closures at McRae Boulevard intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection
  • Zaragoza (FM 659) north and southbound right lane closures at Rojas Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection
  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection

Crews will be working on intersection improvements.

Delta/Alameda & Zaragoza/George Dieter Traffic Signal Improvement Project

Monday, June 17 through Friday, June 21

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda and Delta intersection alternate lane closures

Crews will be working on traffic signals.

Maintenance

Monday, June 17 through Friday, June 21

9 a.m. to 3 p.m.

  • Loop 375 (Border Highway) eastbound between US-54 and Midway right lane closed
  • Loop 375 (Border Highway) westbound between Zaragoza and Midway right lane closed

Crews will be working on shoulder.

  • I-10 westbound at Piedras exit closed

Crews will be milling.

Montana Frontage Road Project

Friday, June 14

From 9:00 a.m. to 4:00 p.m.

  • Lee Boulevard full closure access to Montana Ave (US 62/180)

Crews will be conducting milling operations.

Monday, June 03 through Saturday, June 29

Daily, from 9:00 a.m. to 5:00 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street

Crews will be exporting material.

Monday, June 17 through Saturday, June 29

Daily, from 9:00 a.m. to 5:00 p.m.

  • Montana Avenue (US 62/180) westbound frontage road left lane closure between Global Reach Drive and ICE Building.

Crews will be working on exporting material, removing barrier and striping.

Purple Heart Loop 375 Widening

Thru Sunday, June 30

Daily, 9:00 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be hauling out material in and out of the median.

 Continuous closure until further notice

  • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601.

Crews will be widening main lanes and constructing north- and southbound frontage road.

Loop 375 Widening Project

Monday, June 17

Nightly, 8:00 p.m. until 5:00 a.m.

  • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Bridge Overpass and Zaragoza (P.O.E) Bridge Overpass

Tuesday, June 18 through Thursday, June 20

Nightly, 9:00 p.m. to 5:00 a.m.

  • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Overpass and Zaragoza (P.O.E) Bridge Overpass

Crews will be working on installing bridge structures and bridge pour.

Monday, June 17, through Friday, June 21

Daily, 9:00 a.m. until 4:00 p.m.

  • Americas Avenue (frontage road) closure south- and northbound between A&M circle and North Loop Road, left lane

Crews will be working on installing digital message sign structures.

SH 20 Raised Medians Project

Monday, June 17 through Friday, June 21

Daily, 8:00 a.m. to 4:00 p.m.

  • SH 20 (Alameda Avenue) east- and westbound inside lane closures between Rio Vista Road and Horizon Boulevard

Crews will be performing boring operations.

SL 375 Mill & Inlay Project

Monday, June 17 through Thursday, June 20

Nightly, 9:00 p.m. to 6:00 a.m.

  • SL 375 (Joe Battle Boulevard) north- and southbound alternating right and left lane closures between Pellicano Drive and Montana Avenue

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

FM 76 Drainage Study

Tuesday, June 18

Daily, 9:00 a.m. to 4:00 p.m.

  • FM 76 (North Loop Drive) east- and westbound left lane closure between Hunter Drive and Hawkins Boulevard

TxDOT will be conducting a drainage study on the existing storm sewer system.

Closure Links:

The post Road closures in El Paso County, Las Cruces for the week of June 17 to 21 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/06/17/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-17-to-21/feed/ 0 ]]>
Socorro man charged with intoxicated manslaughter in deadly crash https://kvia.com/news/abc-7-alert-center/2024/06/09/traffic-alert-lanes-closed-at-americas-south-and-zaragoza/ https://kvia.com/news/abc-7-alert-center/2024/06/09/traffic-alert-lanes-closed-at-americas-south-and-zaragoza/#respond Sun, 09 Jun 2024 20:48:27 +0000 https://kvia.com/?p=1247064

Update (July 22, 2024): Parada was released from jail on bond on June 14, 2024. Parada is scheduled to be arraigned September 11, 2024 at 8:30 AM. Update (June 12, 2024): Court documents state that officers believed Parada was drunk at the time of the crash due to alleged slurred speech, swaying, blurry and watery

The post Socorro man charged with intoxicated manslaughter in deadly crash appeared first on KVIA.

]]>

Update (July 22, 2024): Parada was released from jail on bond on June 14, 2024.

Parada is scheduled to be arraigned September 11, 2024 at 8:30 AM.


Update (June 12, 2024): Court documents state that officers believed Parada was drunk at the time of the crash due to alleged slurred speech, swaying, blurry and watery eyes, and an unknown alcohol odor coming off his body.

Court documents report that Parada told officers the following: "yes, me and my friend were at the Speaking Rock Casino. I was driving and my friend was in the passenger seat."

Officers report that Parada told them he had consumed multiple tequila shots and multiple beers. Court documents state that Parada has a prior DWI conviction from 2019.

Tribal Officers patrolling Zaragoza had gotten an alert from Speaking Rock Casino about people who caused a disturbance inside. When the officer saw Parada's car, described by casino staff, he or she tried to stop Parada. Parada's car crashed into a pole soon after, court documents state.


Update (June 10, 2024): El Paso Police arrested and charged 36-year-old Socorro resident Ramon Jaime Parada with intoxication manslaughter. They booked him on a $110,000 bond.

Courtesy: EPPD

Police say the passenger, 25-year-old Socorro resident Rey Leonardo Mendez died in the crash.

Special Traffic Investigators are still looking into the collision. They say Parada was "speeding" south on Zaragoza when he drove head-on into a metal pole near the Zaragoza and Americas intersection.

"Parada was found to be intoxicated and was taken into custody," police officials explained. "The investigation revealed Parada had fled from Tribal Police before the crash."


Update: Special Traffic Investigators with the El Paso Police Department are responding to a crash in lower valley.

Police confirm one person has died as a result of the single vehicle crash and another was taken to an area hospital with life-threatening injuries.

Southbound Americas Avenue is closed to traffic at Zaragoza as police investigate the crash.

TxDOT reports traffic is being detoured on the turnaround and access to the Zaragoza Port of Entry is not currently affected.


EL PASO, Texas (KVIA) -- El Paso Police say all lanes at Americas South and Zaragoza have been shut down after a crash.

It happened before 1 p.m. Sunday.

El Paso Fire say two people were transported to an area hospital with life threatening injuries.

Police are asking drivers to observe the detour.

This is a developing story and will be updated as information becomes available.

The post Socorro man charged with intoxicated manslaughter in deadly crash appeared first on KVIA.

]]>
https://kvia.com/news/abc-7-alert-center/2024/06/09/traffic-alert-lanes-closed-at-americas-south-and-zaragoza/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of June 10 to 14 https://kvia.com/traffic/2024/06/10/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-10-to-14/ https://kvia.com/traffic/2024/06/10/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-10-to-14/#respond Mon, 10 Jun 2024 10:48:42 +0000 https://kvia.com/?p=1247201

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures June 10 to June 14. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information

The post Road closures in El Paso County, Las Cruces for the week of June 10 to 14 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures June 10 to June 14. For updates in El Paso, click here.  (https://twitter.com/txdotelp)

For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

Guardrail Repair

Monday, June 10

9 a.m. to 4 p.m.

  • Spur 601 westbound exit 20A complete closure
  • US-54 southbound between Broaddus and Cassidy right lane closed

Tuesday, June 11

9 a.m. to 4 p.m.

  • Paisano entrance ramp to I-10 West closed
  • I-10 eastbound between Mesa Park and Executive right lane closed

Wednesday, June 12

9 a.m. to 4 p.m.

  • Loop 375 (Border Highway) westbound between I-110 and Paisano right lane closed

Thursday, June 13

9 a.m. to 4 p.m.

  • Loop 375 (Border Highway) eastbound at Midway exit 53 closed

Friday, June 14

9 a.m. to 4 p.m.

  • US-54 northbound between Ramp O (Loop 375 West and US-54 North) right lane closed
  • I-10 eastbound between New Mexico state line and Antonio left lane closed

Crews will be repairing guardrail.

Spall Repair

Sunday, June 9 and Monday, June 10

9 p.m. to 5 a.m. (Night)

  • Direct connector ramp between southbound US-54 and Loop 375 (Border Highway) West (Ramp P) will be closed

Tuesday, June 11

9 p.m. to 5 a.m. (Night)

  • I-10 eastbound between Raynolds and Geronimo alternate lane closures

Wednesday, June 12

9 p.m. to 5 a.m. (Night)

  • I-10 westbound between McRae and Viscount right three lanes and McRae on-ramp to I-10 West closed

Thursday, June 13

9 p.m. to 5 a.m. (Night)

  • US-54 southbound between Trowbridge and Loop 375 complete closure to Loop 375 eastbound traffic will be routed to I-10 eastbound

Crews will be repairing spall.

North Mesa Street Rehabilitation Project

9 p.m. to 6 a.m. (Overnight)

  • Sunday, June 09 - Mesa northbound middle lane and right lane closures I-10 to Doniphan
  • Monday, June 10 - Mesa northbound middle lane and right lane closures I-10 to Doniphan
  • Tuesday, June 11 – Mesa northbound middle lane and left lane closures I-10 to Doniphan
  • Wednesday, June 12 - Mesa northbound left lane and turning lane closures I-10 to Doniphan
  • Thursday, June 13 – Mesa southbound middle lane and right lane closures Doniphan to I-10

9 a.m. to 4 p.m. (Daily)

·        Monday, June 10 - Mesa northbound middle lane and right lane closures I-10 to Doniphan

·        Tuesday, June 11 – Mesa northbound middle lane and right lane closures I-10 to Doniphan

·        Wednesday, June 12 - Mesa northbound middle lane and left lane closures I-10 to Doniphan

·        Thursday, June 13 - Mesa northbound left lane and turning lane closures I-10 to Doniphan

·        Friday, June 14 - Mesa northbound left lane and turning lane closures I-10 to Doniphan

Crews will be milling and paving.

North Mesa Street Lighting Improvement Project

Monday, June 10 through Friday, June 14

9 a.m. to 4 p.m.

·        Mesa northbound right lane closure between Festival to Mesa Hills Dr

·        Mesa alternating north and southbound alternating left and right lane closure between Executive Center and Mesita Drive/Sun Bowl Drive

·        Mesa alternating north and southbound alternating left lane closure between Glory Road/East Baltimore Drive and Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, and installing new lighting poles.

Traffic Signal Improvements

Monday, June 10 through Friday, June 14

9 a.m. to 4 p.m.

·        Mesa north- and southbound right lane closures at the Resler Drive intersection

·        Mesa north- and southbound right lane closures at the Camille Drive intersection

·        Montana (US-62) east- and westbound right lane closures at McRae Boulevard intersection

·        Zaragoza (FM 659) north- and southbound right lane closures at Escobar Drive intersection

·        Gateway N Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection

Crews will be working on intersection improvements

Monday, June 10 through Friday, June 14

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda and Delta intersection alternate lane closures

Crews will be working on traffic signals.

Monday, June 10 through Friday, June 14

7 a.m. to 7 p.m.

  • Intersection of Paisano and Gateway West- and Gateway East alternate lane closures

Crews will be working on traffic signal improvements.

Maintenance

Monday, June 10 to Friday, June 14

9 p.m. to 6 a.m.

  • Alternating lane closures on Talbot Avenue from Doniphan Drive to Spur 16

Crews will be performing mill and inlay work.

Monday, June 10 through Friday, June 14

9 a.m. to 3 p.m.

  • Loop 375 (Border Highway) eastbound between US-54 and Midway right lane closed
  • Loop 375 (Border Highway) westbound between Zaragoza and Midway right lane closed

Crews will be working on shoulder.

  • Loop 375 (Woodrow Bean) between Bomarc and Railroad alternate lane closures

Crews will be working on bridge.

Montana Widening Project

Monday, June 03 through Saturday, June 29

Daily, from 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street

Crews will be exporting material.

Monday, June 10 through Tuesday, June 11

Daily, from 9 p.m. to 5 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road full closure between Joe Battle Boulevard and Tierra Este Road

Crews will be working on traffic switch.

Purple Heart Loop 375 Widening

Through Sunday, June 30

Daily, from 9 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be hauling out material in and out of the median.

Loop 375 Widening Project

Monday, June 10 through Thursday, June 13

Nightly, from 9 p.m. to 5 a.m.

  • Loop 375 south- and northbound main lane closure between North Loop Overpass and Zaragoza (P.O.E) Overpass

Crews will be working on installing bridge structures.

Continuous closure until 4 p.m. Sunday, June 16

  • Americas Avenue (frontage road) right lane northbound between Joe Rodriguez Road and South Side Road closed

Crews will be securing roadway until required asphalt repair work is complete.

Districtwide Metal Beam Guard Fence Project

Monday, June 10 through Friday, June 14

Daily, 6:30 a.m. to 5 p.m.

  • I-10 westbound alternating shoulder, and lane closures between Horizon Boulevard bridge to Tornillo bridge

Crews will be working on replacing metal beam guard fence.

SH 20 Raised Medians Project

Monday, June 10 through Friday,  June 14

9 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east- and westbound closure inside lane closures between Rio Vista Road and Horizon Boulevard.

Crews will be preparing locations to bore and begin boring.

The post Road closures in El Paso County, Las Cruces for the week of June 10 to 14 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/06/10/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-10-to-14/feed/ 0 ]]>
Road closure scheduled at Foothills and Lohman in Las Cruces https://kvia.com/news/2024/06/09/road-closure-scheduled-at-foothills-and-lohman-in-las-cruces/ https://kvia.com/news/2024/06/09/road-closure-scheduled-at-foothills-and-lohman-in-las-cruces/#respond Sun, 09 Jun 2024 15:26:51 +0000 https://kvia.com/?p=1247030

LAS CRUCES, New Mexico (KVIA) -- Motorists driving on and around Foothills at Lohman Ave. will see a road closure this week. The closure will happen Monday and Tuesday this week, between 9 a.m. and 3 p.m. Volt, Inc. will be installing conduit for upgrades to their facilities.   For more information, you can call

The post Road closure scheduled at Foothills and Lohman in Las Cruces appeared first on KVIA.

]]>

LAS CRUCES, New Mexico (KVIA) -- Motorists driving on and around Foothills at Lohman Ave. will see a road closure this week.

The closure will happen Monday and Tuesday this week, between 9 a.m. and 3 p.m.

Volt, Inc. will be installing conduit for upgrades to their facilities.  

For more information, you can call the Public Works Department's Construction Management team at 575-528-3098. The TTY number is 575-541-2182.

The post Road closure scheduled at Foothills and Lohman in Las Cruces appeared first on KVIA.

]]>
https://kvia.com/news/2024/06/09/road-closure-scheduled-at-foothills-and-lohman-in-las-cruces/feed/ 0 ]]>
ABC-7 at 4: New safety rest area opens in Van Horn, Texas https://kvia.com/traffic/2024/06/07/abc-7-at-4-new-safety-rest-area-opens-in-van-horn-texas/ https://kvia.com/traffic/2024/06/07/abc-7-at-4-new-safety-rest-area-opens-in-van-horn-texas/#respond Fri, 07 Jun 2024 23:21:34 +0000 https://kvia.com/?p=1246728

El Paso, TX( KVIA-TV)- People who enjoy road trips quickly find out how big a state Texas actually is. And driving to any other city can mean hours in the car, which can bring about the dangerous condition of driver fatigue. TX Dot has safety rest areas in various locations across the state. A new

The post ABC-7 at 4: New safety rest area opens in Van Horn, Texas appeared first on KVIA.

]]>

El Paso, TX( KVIA-TV)- People who enjoy road trips quickly find out how big a state Texas actually is. And driving to any other city can mean hours in the car, which can bring about the dangerous condition of driver fatigue. TX Dot has safety rest areas in various locations across the state. A new rest area just opened in the El Paso district is TX Dot's Jennifer Wright explains.

Closures:

I-10 Widening West

Monday, June 10, through Saturday, June 15

9 a.m. to 4 p.m.

  • I-10 East and West will be intermittently reduced to one lane between Vinton Road and Transmountain Road.

Crews will be constructing retaining walls.

49-hour closure to open lane

Saturday, June 22 at 4 a.m., through Monday, June 24 at 5 a.m.

  • I-10 West will be closed from North Mesa Street to Transmountain Road

DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert Boulevard, re-enter I-10 past Transmountain Road.

Crews will be restriping the roadway to open a second westbound lane on I-10

Beginning on Monday, June 24, at 5 a.m.

  • I-10 West will be open to two lanes of traffic from North Mesa Street to south of Transmountain Road
  • I-10 West will remain at one lane from South of Transmountain Road to Enchanted Hills Drive.

Beginning on Monday, June 24 at 5 a.m.

  • The new permanent Loop 375/Spur 16/Transmountain Road exit from I-10 West will open.
  • The old temporary exit will close permanently

NOTE: The permanent exit is approximately ½ mile before the temporary exit.

Beginning Monday, June 24, at 5 a.m.

  • The Redd Road exit from I-10 West will close permanently.

DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert Boulevard, turn left or right on Redd Road.

Crews will begin removing the existing ramp.

56-hour closure

Friday, June 28 at 9 p.m., through Monday, July 1 at 5 a.m.

  • I-10 East and West will be closed at Thorn Avenue.

EASTBOUND DETOUR: Take Exit 9 (Redd Road), continue on South Desert Boulevard, re-enter I-10 past Mesa Street

WESTBOUND DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert Boulevard, re-enter I-10 past Transmountain Road.

Crews will be demolishing the Thorn Avenue overpass.

The following closures and detours will continue until further notice:

  • The westbound mainlanes of I-10 are detoured onto North Desert Boulevard at Los Mochis Drive.
  • The eastbound mainlanes of I-10 are detoured onto South Desert Boulevard at Los Mochis Drive.
  • South Desert Boulevard is closed to all traffic south of Spur 37 (Vinton Road).
  • Both turnarounds at Redd Road are closed.
  • The onramp from South Desert Boulevard to I-10 East at Redd Road is closed.
  • Alternating nighttime lane closures are possible on I-10 East and West between Redd Road and Anthony, Texas.
  • Alternating daytime lane closures are possible on North Desert Boulevard and South Desert Boulevard between Redd Road and Anthony, Texas.

Guardrail Repair

Monday, June 10

9 a.m. to 4 p.m.

  • Spur 601 westbound exit 20A complete closure
  • US-54 southbound between Broaddus and Cassidy right lane closed

Tuesday, June 11

9 a.m. to 4 p.m.

  • Paisano entrance ramp to I-10 West closed
  • I-10 eastbound between Mesa Park and Executive right lane closed

Wednesday, June 12

9 a.m. to 4 p.m.

  • Loop 375 (Border Highway) westbound between I-110 and Paisano right lane closed

Thursday, June 13

9 a.m. to 4 p.m.

  • Loop 375 (Border Highway) eastbound at Midway exit 53 closed

Friday, June 14

9 a.m. to 4 p.m.

  • US-54 northbound between Ramp O (Loop 375 West and US-54 North) right lane closed
  • I-10 eastbound between New Mexico state line and Antonio left lane closed

Crews will be repairing guardrail.

Spall Repair

Sunday, June 9 and Monday, June 10

9 p.m. to 5 a.m. (Night)

  • Direct connector ramp between southbound US-54 and Loop 375 (Border Highway) West (Ramp P) will be closed

Tuesday, June 11

9 p.m. to 5 a.m. (Night)

  • I-10 eastbound between Raynolds and Geronimo alternate lane closures

Wednesday, June 12

9 p.m. to 5 a.m. (Night)

  • I-10 westbound between McRae and Viscount right three lanes and McRae on-ramp to I-10 West closed

Thursday, June 13

9 p.m. to 5 a.m. (Night)

  • US-54 southbound between Trowbridge and Loop 375 complete closure to Loop 375 eastbound traffic will be routed to I-10 eastbound

Crews will be repairing spall.

North Mesa Street Rehabilitation Project

9 p.m. to 6 a.m. (Overnight)

  • Sunday, June 09 - Mesa northbound middle lane and right lane closures I-10 to Doniphan
  • Monday, June 10 - Mesa northbound middle lane and right lane closures I-10 to Doniphan
  • Tuesday, June 11 – Mesa northbound middle lane and left lane closures I-10 to Doniphan
  • Wednesday, June 12 - Mesa northbound left lane and turning lane closures I-10 to Doniphan
  • Thursday, June 13 – Mesa southbound middle lane and right lane closures Doniphan to I-10

9 a.m. to 4 p.m. (Daily)

·        Monday, June 10 - Mesa northbound middle lane and right lane closures I-10 to Doniphan

·        Tuesday, June 11 – Mesa northbound middle lane and right lane closures I-10 to Doniphan

·        Wednesday, June 12 - Mesa northbound middle lane and left lane closures I-10 to Doniphan

·        Thursday, June 13 - Mesa northbound left lane and turning lane closures I-10 to Doniphan

·        Friday, June 14 - Mesa northbound left lane and turning lane closures I-10 to Doniphan

Crews will be milling and paving.

North Mesa Street Lighting Improvement Project

Monday, June 10 through Friday, June 14

9 a.m. to 4 p.m.

·        Mesa northbound right lane closure between Festival to Mesa Hills Dr

·        Mesa alternating north and southbound alternating left and right lane closure between Executive Center and Mesita Drive/Sun Bowl Drive

·        Mesa alternating north and southbound alternating left lane closure between Glory Road/East Baltimore Drive and Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, and installing new lighting poles.

Traffic Signal Improvements

Monday, June 10 through Friday, June 14

9 a.m. to 4 p.m.

·        Mesa north- and southbound right lane closures at the Resler Drive intersection

·        Mesa north- and southbound right lane closures at the Camille Drive intersection

·        Montana (US-62) east- and westbound right lane closures at McRae Boulevard intersection

·        Zaragoza (FM 659) north- and southbound right lane closures at Escobar Drive intersection

·        Gateway N Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection

Crews will be working on intersection improvements

Monday, June 10 through Friday, June 14

7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures
  • Alameda and Delta intersection alternate lane closures

Crews will be working on traffic signals.

Monday, June 10 through Friday, June 14

7 a.m. to 7 p.m.

  • Intersection of Paisano and Gateway West- and Gateway East alternate lane closures

Crews will be working on traffic signal improvements.

Maintenance

Monday, June 10 to Friday, June 14

9 p.m. to 6 a.m.

  • Alternating lane closures on Talbot Avenue from Doniphan Drive to Spur 16

Crews will be performing mill and inlay work.

Monday, June 10 through Friday, June 14

9 a.m. to 3 p.m.

  • Loop 375 (Border Highway) eastbound between US-54 and Midway right lane closed
  • Loop 375 (Border Highway) westbound between Zaragoza and Midway right lane closed

Crews will be working on shoulder.

  • Loop 375 (Woodrow Bean) between Bomarc and Railroad alternate lane closures

Crews will be working on bridge.

Montana Widening Project

Monday, June 03 through Saturday, June 29

Daily, from 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street

Crews will be exporting material.

Monday, June 10 through Tuesday, June 11

Daily, from 9 p.m. to 5 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road full closure between Joe Battle Boulevard and Tierra Este Road

Crews will be working on traffic switch.

Purple Heart Loop 375 Widening

Through Sunday, June 30

Daily, from 9 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be hauling out material in and out of the median.

Loop 375 Widening Project

Monday, June 10 through Thursday, June 13

Nightly, from 9 p.m. to 5 a.m.

  • Loop 375 south- and northbound main lane closure between North Loop Overpass and Zaragoza (P.O.E) Overpass

Crews will be working on installing bridge structures.

Continuous closure until 4 p.m. Sunday, June 16

  • Americas Avenue (frontage road) right lane northbound between Joe Rodriguez Road and South Side Road closed

Crews will be securing roadway until required asphalt repair work is complete.

Districtwide Metal Beam Guard Fence Project

Monday, June 10 through Friday, June 14

Daily, 6:30 a.m. to 5 p.m.

  • I-10 westbound alternating shoulder, and lane closures between Horizon Boulevard bridge to Tornillo bridge

Crews will be working on replacing metal beam guard fence.

SH 20 Raised Medians Project

Monday, June 10 through Friday,  June 14

9 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east- and westbound closure inside lane closures between Rio Vista Road and Horizon Boulevard.

Crews will be preparing locations to bore and begin boring.

Closure Links:

West Area Project Closures

I-10 Widening West Closures

East Area Project Closures 

The post ABC-7 at 4: New safety rest area opens in Van Horn, Texas appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/06/07/abc-7-at-4-new-safety-rest-area-opens-in-van-horn-texas/feed/ 0 ]]>
Northrise Drive and Rinconada Boulevard Lane Closures https://kvia.com/news/new-mexico/2024/06/03/northrise-drive-and-rinconada-boulevard-lane-closures/ https://kvia.com/news/new-mexico/2024/06/03/northrise-drive-and-rinconada-boulevard-lane-closures/#respond Mon, 03 Jun 2024 14:53:22 +0000 https://kvia.com/?p=1245153

El Paso, Texas (KVIA)-Rinconada Boulevard from Sonoma Ranch Boulevard to Northrise Drive will have a lane closure in the westbound lane. Additionally, Northrise Drive from Rinconada Boulevard to Cross Creek Road will have a lane closure in the eastbound lane.  These closures will begin Tuesday, June 4, 2024, and last approximately two weeks. Both locations will have

The post Northrise Drive and Rinconada Boulevard Lane Closures appeared first on KVIA.

]]>

El Paso, Texas (KVIA)-Rinconada Boulevard from Sonoma Ranch Boulevard to Northrise Drive will have a lane closure in the westbound lane. Additionally, Northrise Drive from Rinconada Boulevard to Cross Creek Road will have a lane closure in the eastbound lane. 

These closures will begin Tuesday, June 4, 2024, and last approximately two weeks. Both locations will have lane closures to allow for roadway work. 

Motorists follow all posted signs. The work and closure will not affect RoadRUNNER Transit or transit stops. 

For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.

The post Northrise Drive and Rinconada Boulevard Lane Closures appeared first on KVIA.

]]>
https://kvia.com/news/new-mexico/2024/06/03/northrise-drive-and-rinconada-boulevard-lane-closures/feed/ 0 ]]>
Road closures in El Paso County, Las cruces for the week of June 3 to 7 https://kvia.com/traffic/2024/06/03/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-3-to-7/ https://kvia.com/traffic/2024/06/03/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-3-to-7/#respond Mon, 03 Jun 2024 11:57:11 +0000 https://kvia.com/?p=1245104

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures June 3 to June 7. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click

The post Road closures in El Paso County, Las cruces for the week of June 3 to 7 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures June 3 to June 7. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

I-10 Widening West

Monday, June 3, through Saturday, June 8

9 a.m. to 4 p.m.

  • I-10 East and West will be intermittently reduced to one lane between Vinton Road and Transmountain Road.

Crews will be constructing retaining walls.

Tuesday, June 4, and Wednesday, June 5

9 p.m. to 5 a.m.

  • I-10 East will be closed at Redd to Mesa.
  • I-10 West will be closed at Mesa to Transmountain.

EASTBOUND DETOUR: Take the Redd Road exit, continue on South Desert Boulevard, and re-enter I-10 past Mesa Street.

WESTBOUND DETOUR: Take the Mesa Street exit, continue on North Desert Boulevard, and re-enter I-10 past Transmountain Road.

Crews will be removing light pole and sign structures.

North Mesa Street Rehabilitation Project

9 p.m. to 6 a.m. Sunday, June 2 

·        Mesa southbound middle lane and left lane closures I-10 to Colony Cove Court

9 a.m. to 4 p.m. Monday, June 3 

·        Mesa southbound middle lane and left lane closures I-10 to Colony Cove Court

9 p.m. to 6 a.m. Monday, June 3 

·        Mesa southbound middle lane and left lane closures I-10 to Colony Cove Court

9 a.m. to 4 p.m. Tuesday, June 4 

·        Mesa southbound middle lane and left lane closures I-10 to Colony Cove Court

9 p.m. to 6 a.m. Tuesday, June 4

·        Mesa southbound middle lane and left lane closures I-10 to Colony Cove Court

9 a.m. to 4 p.m. Wednesday, June 5 

·        Mesa southbound middle lane, left lane, and turning lane closures I-10 to Colony Cove Court

9 p.m. to 6 a.m. Wednesday, June 5

·        Mesa southbound left lane and turning lane closures I-10 to Colony Cove Court

9 a.m. to 4 p.m. Thursday, June 6 

·        Mesa southbound left lane and turning lane closures I-10 to Colony Cove Court

9 a.m. to 4 p.m. Friday, June 7 

·        Mesa southbound right lane and turn lane closures from I-10 to Colony Cove Court

North Mesa Street Lighting Improvement Project

Monday, June 3 through Friday, June 7

9 a.m. to 4 p.m.

·        Mesa northbound right lane closure between Festival to Mesa Hills Drive

·        Mesa alternating north- and southbound alternating right lane closure between Executive Center and Castellano Drive

·        Mesa alternating north- and southbound alternating left and right lane closure between Mesita Drive/Sun Bowl Drive and Executive Center Boulevard

·        Mesa alternating north- and southbound alternating left lane closure between Glory Road/Baltimore Drive and Mesita Drive/Sun Bowl Drive

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, and installing new lighting poles.

Traffic Signal Improvements Project

Monday, June 3 through Friday, June 7

9 a.m. to 4 p.m.

·        Mesa north- and southbound right lane closures at the Resler Dr intersection

·        Mesa north- and southbound right lane closures at the Camille Dr intersection

·        Montana (US-62) east- and westbound right lane closures at McRae Blvd intersection

Crews will be working on intersection improvements.

Monday, June 3 through Friday, June 4

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be potholing and boring to line locate.

Monday, June 3 through Friday, June 7

7 a.m. to 7 p.m.

  • Intersection of Paisano and Gateway West- and Gateway East alternate lane closures
  • I-10 West at Exit Ramp 23B (Paisano / Chelsea) closed
  • North Lee Trevino between Trawood and Montwood alternate lane closures

Crews will be working on traffic signal improvements.

Guardrail Repair

Monday, June 3

9 a.m. to 4 p.m.

  • I-10 eastbound between Santa Fe and Dallas right lane and Franklin on-ramp closed

Tuesday, June 4

9 a.m. to 4 p.m.

  • Loop 375 eastbound between Yarbrough and Padres right lane closed

Wednesday, June 5

9 a.m. to 4 p.m.

  • I-10 eastbound between Mesa and Sunland Park right lane closed
  • I-10 westbound between Mesa Park and Sunland Park left lane closed

Thursday, June 6

9 a.m. to 4 p.m.

  • I-10 westbound between Hawkins to Airway right lane closed

Friday, June 7

9 a.m. to 4 p.m.

  • US-54 northbound between Trowbridge and Pershing right lane closed

Spall Repair

Sunday, June 2

9 p.m. to 5 a.m. (Night)

  • Direct connector ramp from southbound US-54 to Loop 375 (Border Highway) West (Ramp P) will be closed

Monday, June 3

9 p.m. to 5 a.m. (Night)

  • I-10 eastbound between Raynolds and Geronimo alternate lane closures

Tuesday, June 4

9 p.m. to 5 a.m. (Night)

  • I-10 westbound between McRae and Viscount right three lanes and McRae on-ramp to I-10 West closed

Wednesday, June 5 and Thursday, June 6

9 p.m. to 5 a.m. (Night)

  • I-10 westbound between Viscount and Airway alternate lane closures

Crews will be repairing spall.

Green Ribbon Project

Monday, June 3 through Friday, June 7

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be installing new landscape.

Future US-54 Extension Project

Monday through Friday, June 3 through 7 & June 10 through 14

9 a.m. to 4 p.m.

  • US-54 between Kenworthy and 0.75 miles north of McCombs

Crews will be conducting soil drilling operations.

Maintenance

Sunday, June 2

5 a.m. to 5 p.m.

  • I-10 West at Geronimo complete freeway closure
  • Airway entrance ramp to I-10 West closed

Crews will be working on bridge joints.

Monday, June 3 through Friday, June 7

9 a.m. to 3 p.m.

  • Loop 375 (Border Highway) eastbound between US-54 and Midway right lane closed
  • Loop 375 (Border Highway) westbound between Zaragoza and Midway right lane closed
  • Spur 601 eastbound between Airport and Global Reach right lane closed
  • Loop 375 (Border Highway) westbound at Midway exit closed

Crews will be working on shoulder.

Montana Widening Project

Thursday, May 30 through Friday, May 31

From 8:30 p.m. to 6:00 a.m.

  • Montana Avenue (US 62/180) complete westbound frontage road closure between Tierra Este Road and Joe Battle Boulevard
  • SL 375 (Purple Heart Highway) north- and southbound, on and off ramp complete closure

Crews will be working on traffic switch at the westbound frontage road.

Monday, June 03 through Saturday, June 29

Daily, from 9:00 a.m. to 5:00 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street

Crews will be exporting material.

Monday, June 03 through Saturday, June 08

Daily, from 9:00 a.m. to 5:00 p.m.

  • Montana Avenue (US 62/180) westbound frontage road center and left lane closure from the ICE building to Global Reach Drive

Crews will be removing concrete barrier.

Thursday, May 30 through Saturday, June 08

Daily, from 9:00 a.m. to 5:00 p.m.

  • Montana Avenue (US 62/180) west- and eastbound frontage road shoulder closure between Tierra Este Road and Joe Battle Boulevard

Crews will be removing cable barrier.

Purple Heart Loop 375 Widening

Monday, May 01 through Friday, May 31

Daily, from 9:00 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be hauling out material in and out of the median.

Continuous closure until further notice

  • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601.

Crews will be widening main lanes and constructing north- and southbound frontage road.

Loop 375 Widening Project

Monday, June 03 through Thursday, June 06

Nightly, from 9:00 p.m. to 5:00 a.m.

  • Loop 375 south- and northbound main lane closure between North Loop Overpass and Zaragoza (P.O.E) Overpass

Crews will be working on installing bridge structures.

Monday, June 03 through Friday, June 07

Daily, from 9:00 a.m. to 4:00 p.m.

  • Americas Avenue (frontage road) southbound closure at South American Underpass, south- to north turnarounds
  • Americas Avenue (frontage road) east- to west median closure at Zaragoza Underpass alternating left lanes

Crews will be working on installing under bridge lighting and grading activities.

Continuous closure until 4:00 p.m. Friday, June 07

  • Americas Avenue (frontage road) northbound between Joe Rodriguez Road and South Side Road, right lane

Crews will be securing roadway until required asphalt repair work is complete.

Loop 375 Mill and Inlay

Sunday, June 03 through Thursday, June 06

Nightly, 9:00 p.m. to 6:00 a.m.

  • Joe Battle Boulevard (frontage road) northbound alternating right and left lane closures between Pellicano Drive and Montana Avenue.

Crews will be working on milling and placing asphaltic concrete pavement.

US 62/180 Mill and Inlay

Thursday, May 30 through Friday, May 31

From 3:00 a.m. to 7:00 a.m.

  • US 62/180 (Montana Avenue) eastbound closure, alternating lane closures from Joe Battle Boulevard to Tierra Este Road

Crews will be working on milling operations and asphaltic concrete pavement.

From 7:00 a.m. to 12:00 p.m.

  • US 62/180 (Montana Avenue) and Tierra Este Road intersection closure

Crews will be working on milling operations and asphaltic concrete pavement.

EP Water Projects

Montana Avenue Cured-in-Place Pipeline Project

24/7 until further notice

  • US 62/180 West (Montana Avenue) will be reduced to one lane between Airport Road and Paisano Drive.
  • Magruder Street, Geronimo Drive, and Airport Road are open at Montana.
  • All other median crossovers between Paisano and Airport are closed.

Crews are preparing to rehabilitate an existing 12-inch waterline.

Gateway Boulevard West and Yarbrough Drive Sanitary Sewer Improvements

24/7 until further notice

  • Lane closures on Gateway Boulevard West between Vista de Oro Drive and North Yarbrough Drive.
  • Right turn onto North Yarbrough Drive remains open.
  • Business access along Gateway Boulevard West will be maintained.

Crews are replacing a sewer main with a new PVC line.

The post Road closures in El Paso County, Las cruces for the week of June 3 to 7 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/06/03/road-closures-in-el-paso-county-las-cruces-for-the-week-of-june-3-to-7/feed/ 0 ]]>
New Safety Rest Areas Open in Van Horn https://kvia.com/traffic/2024/05/30/new-safety-rest-areas-open-in-van-horn/ https://kvia.com/traffic/2024/05/30/new-safety-rest-areas-open-in-van-horn/#respond Thu, 30 May 2024 15:06:25 +0000 https://kvia.com/?p=1243952

El Paso, TX (KVIA-TV)-Two new safety rest areas in Culberson County will open on Saturday, June 1. The facilities on I-10, both east and west, are nine miles from Van Horn and will replace current rest area locations four miles outside Van Horn. Careful consideration went into location, design, context, and construction. In addition to

The post New Safety Rest Areas Open in Van Horn appeared first on KVIA.

]]>

El Paso, TX (KVIA-TV)-Two new safety rest areas in Culberson County will open on Saturday, June 1. The facilities on I-10, both east and west, are nine miles from Van Horn and will replace current rest area locations four miles outside Van Horn. Careful consideration went into location, design, context, and construction. In addition to being the newest of the 76 safety rest areas in the state, the facilities are two of the largest, with 58 trucks and 27 car parking spaces on each side. In the near future, the safety rest areas will form part of the I-10 Truck Parking Availability System, which will provide truck drivers with real-time information on public truck parking sites along I-10. While there are walking paths around the facilities, visitors are reminded of the natural desert environment and should watch for wildlife.

A ceremonial ribbon cutting, a significant event scheduled for Friday, May 31, at 10 a.m. CST at the eastbound facility nine miles east of Van Horn (milepost 150).

The post New Safety Rest Areas Open in Van Horn appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/05/30/new-safety-rest-areas-open-in-van-horn/feed/ 0 ]]>
Road closures in El Paso County, Las Cruces for the week of May 27 to May 31 https://kvia.com/traffic/2024/05/27/road-closures-in-el-paso-county-las-cruces-for-the-week-of-may-27-to-may-31/ https://kvia.com/traffic/2024/05/27/road-closures-in-el-paso-county-las-cruces-for-the-week-of-may-27-to-may-31/#respond Mon, 27 May 2024 11:13:29 +0000 https://kvia.com/?p=1242976

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures May 27 to May 31. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information

The post Road closures in El Paso County, Las Cruces for the week of May 27 to May 31 appeared first on KVIA.

]]>

EL PASO, Texas -- From west to east El Paso, to Southern New Mexico there's a construction project in almost every part of the Borderland. Here's a complete list of TxDOT's and Las Cruces road closures May 27 to May 31. For updates in El Paso, click here.  (https://twitter.com/txdotelp) For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20) 

I-10 Widening West

Tuesday, May 28, through Saturday, June 1

9 a.m. to 4 p.m.

  • I-10 East and West will be intermittently reduced to one lane between Vinton Road and Transmountain Road.

Crews will be constructing retaining walls.

Wednesday, May 29, and Thursday, May 30

9 p.m. to 5 a.m.

  • I-10 East will be reduced to one lane between Los Mochis Drive and Montoya Lane.
  • The direct connector ramp from westbound Transmountain Road to I-10 East will be closed.
  • Exit to Redd Road from I-10 East will be closed.

DETOUR: Continue on South Desert Boulevard to reach Redd Road.

Crews will be installing an overhead sign bridge.

The following closures and detours will continue until further notice:

  • The westbound mainlanes of I-10 are detoured onto North Desert Boulevard at Los Mochis Drive.
  • The eastbound mainlanes of I-10 are detoured onto South Desert Boulevard at Los Mochis Drive.
  • South Desert Boulevard is closed to all traffic south of Spur 37 (Vinton Road).
  • I-10 West is reduced to one land from Redd Road to north of Transmountain Road.
  • Both turnarounds at Redd Road are closed.
  • The onramp from South Desert Boulevard to I-10 East at Redd Road is closed.
  • Alternating nighttime lane closures are possible on I-10 East and West between Redd Road and Anthony, Texas.
  • Alternating daytime lane closures are possible on North Desert Boulevard and South Desert Boulevard between Redd Road and Anthony, Texas.

McCombs Mill & Inlay Project

Tuesday, May 28 through Thursday, May 30

9 p.m. to 5 a.m. (Night)

  • FM-2529 (McCombs) between US-54 and Dyer alternate lane closures

Crews will be working on mill and inlay.

North Mesa Street Rehabilitation Project

Monday, May 27

9 p.m. to 6 a.m.

  • Mesa southbound turning lane and right lane closures IH-10 to Colony Cove Ct

Tuesday, May 28

9 a.m. to 4 p.m.  

  • Mesa southbound turning lane and right lane closures Colony Cove Ct to IH-10

Tuesday, May 28

9 p.m. to 6 a.m.

  • Mesa southbound turning lane and right lane closures IH-10 to Colony Cove Ct

Wednesday, May 29

9 a.m. to 4 p.m.

  • Mesa southbound turning lane and right lane closures Colony Cove Ct to IH-10

Wednesday, May 29

9 p.m. to 6 a.m.

  • Mesa southbound middle and left lane closures IH-10 to Colony Cove Ct

Thursday, May 30

9 a.m. to 4 p.m.

  • Mesa southbound middle and left lane closures IH-10 to Colony Cove Ct

Thursday, May 30

9 p.m. to 6 a.m.

  • Mesa southbound middle and left lane closures IH-10 to Colony Cove Ct

Friday, May 31

9 a.m. to 4 p.m.

  • Mesa southbound middle and left lane closures IH-10 to Colony Cove Ct

North Mesa Street Lighting Improvement Project

Tuesday, May 28 through Friday, May 31

9 a.m. to 4 p.m.

  • As Needed - Mesa (SH-20) northbound right lane closure between Festival Dr and Sunland Park Dr
  • Mesa alternating north- and southbound alternating right lane closure between Executive Center and Festival Dr
  • Mesa alternating north- and southbound alternating left and right lane closure between Mesita Dr/Sun Bowl Dr and Executive Center
  • Mesa alternating north- and southbound alternating left lane closure between Glory Rd / E Baltimore Dr and Mesita Dr/Sun Bowl Dr

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, and installing new lighting poles.

Traffic Signal Improvements Project

Tuesday, May 28 through Friday, May 31

9 a.m. to 4 p.m.

  • Mesa north- and southbound right lane closures at the Resler Dr intersection
  • Mesa north- and southbound right lane closures at the Camille Dr intersection
  • Montana east- and westbound right lane closures at McRae Blvd intersection

Crews will be working on intersection improvements.

Tuesday, May 28 through Friday, May 31

9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures
  • Alameda north- and southbound at Delta intersection alternate lane closures

Crews will be potholing and boring to line locate.

Tuesday, May 28 through Friday, May 31

7 a.m. to 7 p.m.

  • Intersection of Paisano and Gateway West- and Gateway East alternate lane closures
  • I-10 West at Exit Ramp 23B (Paisano/Chelsea) closed
  • North Lee Trevino between Trawood and Montwood alternate lane closures

Crews will be working on traffic signal improvements.

Guardrail Repair

Tuesday, May 28

9 a.m. to 4 p.m.

  • US-54 northbound between Pershing and Fred Wilson complete closure at Spur 601 entrance ramp eastbound

Wednesday, May 29

9 a.m. to 4 p.m.

  • I-10 eastbound between Santa Fe and Schuster right lane and Schuster exit ramp closed

Thursday, May 30

9 a.m. to 4 p.m.

  • FM-2529 northbound between Blackhawk and Palomino left lane closed

Friday, May 31

9 a.m. to 4 p.m.

  • I-10 westbound between Mesa Park and Sunland Park exit left lane and complete Resler exit ramp closed

Crews will be repairing guardrail.

Spall Repair

Tuesday, May 28

9 p.m. to 5 a.m. (Night)

  • I-10 eastbound at Geronimo right three lanes and Trowbridge on-ramp closed

Wednesday, May 29

9 p.m. to 5 a.m. (Night)

  • I-10 eastbound at Magruder right two lanes and Trowbridge exit ramp closed

Thursday, May 30

9 p.m. to 5 a.m. (Night)

  • I-10 eastbound at Piedras left three lanes closed

Crews will be repairing spall.

Green Ribbon Project

Tuesday, May 28 through Friday, May 31

9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed
  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed

Crews will be installing new landscape.

Maintenance

Tuesday, May 28 through Friday, May 31

9 a.m. to 3 p.m.

  • Loop 375 eastbound Border Highway between US-54 and Midway right lane closed
  • Loop 375 westbound between Zaragoza and Midway right lane closed

Crews will be working on shoulder.

Montana Widening Project

Tuesday, May 28 through Saturday, June 1

Daily, from 9:00 a.m. to 5:00 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street

Crews will be exporting material.

Tuesday, May 28 through Saturday, June 01

Daily, from 9:00 a.m. to 5:00 p.m.

  • Montana Avenue (US 62/180) westbound frontage road center and left lane closure from the ICE building to Global Reach Drive

Crews will be removing concrete barrier.

Thursday, May 28 through Wednesday, May 29

Daily, from 9:00 a.m. to 5:00 p.m.

  • Montana Avenue (US 62/180) west- and eastbound frontage road shoulder closure between Tierra Este Road and Joe Battle Boulevard

Crews will be removing cable barrier.

Wednesday, May 29 through Thursday, May 30

Daily, from 9:00 p.m. to 5:00 a.m.

  • Montana Avenue (US 62/180) complete westbound frontage road closure from Tierra Esta to Joe Battle Boulevard
  • SL 375 (Purple Heart Highway) north- and southbound, on and off ramp complete closure.

Crews will be working on traffic switch at the westbound frontage road.

Purple Heart Loop 375 Widening

Through Friday, May 31

Daily, from 9:00 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be hauling out material in and out of the median.

Wednesday, May 29

From 9:00 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) southbound inside left lane closure between Montana Avenue and Spur 601, between mile marker 25 and 22.

Crews will be working on removing graffiti.

Continuous closure until further notice

  • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601.

Crews will be widening main lanes and constructing north- and southbound frontage road.

Loop 375 Widening Project

Tuesday, May 28 through Thursday, May 30

Nightly, from 9:00 p.m. to 5:00 a.m.

  • Loop 375 south- and northbound main lane closure between North Loop Overpass and Zaragoza (P.O.E) Overpass

Crews will be working on installing bridge structures, and grading activities.

Tuesday, May 28 through Friday, May 31

Daily, from 9:00 a.m. to 4:00 p.m.

  • Americas Avenue (frontage road) southbound closure at South American Underpass, south- to north turnarounds
  • Americas Avenue (frontage road) east- to west median closure at Zaragoza Underpass alternating left lanes

Crews will be working on installing under bridge lighting.

Continuous closure until 4:00 p.m. Friday, May 31

  • Americas Avenue (frontage road) northbound between Joe Rodriguez Road and South Side Road, right lane

Crews will be securing roadway until required asphalt repair work is complete.

US 62/180 Mill and Inlay

Tuesday, May 28

From 8:30 p.m. to 5:00 a.m.

  • US 62/180 (Montana Avenue) eastbound closure, alternating lane closures

Crews will be milling existing pavement.

Wednesday, May 29

From 8:30 p.m. to 5:00 a.m.

  • US 62/180 (Montana Avenue) eastbound closure, alternating lane closures

Crews will be placing pavement.

Thursday, May 30

From 8:30 p.m. to 5:00 a.m.

  • US 62/180 (Montana Avenue) eastbound closure, alternating lane closures

Crews will be placing final striping.

EL PASO WATER PROJECT

Montana Avenue Cured-in-Place Pipeline Project

24/7 until further notice

  • US 62/180 West (Montana Avenue) will be reduced to one lane between Airport Road and Paisano Drive.
  • Magruder Street, Geronimo Drive, and Airport Road are open at Montana.
  • All other median crossovers between Paisano and Airport are closed.

Crews are preparing to rehabilitate an existing 12-inch waterline.

Wednesday, May 29, and Thursday, May 30

9 p.m. to 5 a.m.

  • Lane closures on Magruder Street north and south of US 62/180 (Montana Avenue).

Crews are preparing to rehabilitate an existing 12-inch waterline.

Please follow the detour signs in place on all projects.  All work is dependent upon weather conditions.

The post Road closures in El Paso County, Las Cruces for the week of May 27 to May 31 appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/05/27/road-closures-in-el-paso-county-las-cruces-for-the-week-of-may-27-to-may-31/feed/ 0 ]]>
Borderland drivers to be fined if they cut lines to cross to El Paso https://kvia.com/news/border/2024/05/22/borderland-drivers-to-be-fined-if-they-cut-lines-to-cross-to-el-paso/ https://kvia.com/news/border/2024/05/22/borderland-drivers-to-be-fined-if-they-cut-lines-to-cross-to-el-paso/#respond Wed, 22 May 2024 16:59:46 +0000 https://kvia.com/?p=1241534

JUÁREZ, Chihuahua (KVIA) -- This week, long lines to cross from Juárez to El Paso have been reported by Borderland drivers on social media. The Juárez's Road Safety Department (Coordinación General de Seguridad Vial) removed 60 drivers on Monday for cutting the line at various Ports of Entry. Weeks ago, Road Safety officers were placed

The post Borderland drivers to be fined if they cut lines to cross to El Paso appeared first on KVIA.

]]>

JUÁREZ, Chihuahua (KVIA) -- This week, long lines to cross from Juárez to El Paso have been reported by Borderland drivers on social media.

The Juárez's Road Safety Department (Coordinación General de Seguridad Vial) removed 60 drivers on Monday for cutting the line at various Ports of Entry.

Weeks ago, Road Safety officers were placed to assist the new Juárez Bus program and assigned to the different routes of the new public transportation program.

These officers were now sent back to the international bridges to alleviate traffic and prevent people from abusing and cutting the line.

Reports also say drivers are now also reporting to road agents the vehicle type, color, and plates by recording or taking pictures of them.

Juárez Road Safety Department General Coordinator César Tapia told ABC-7 that since December they've been conducting operations at the Bridge of the Americas, Ysleta-Zaragoza, and Paso del Norte bridge.

Since then, nearly 400 drivers have received traffic tickets for cutting the line and not obeying officers telling them to leave the line.

"Having officers at the bridges conducting these operations is causing discomfort to citizens and residents," Tapia said.

Coordinator Tapia also said they want drivers cutting the line to respect other people's time.

If you cut the line, officers will ask you to leave and if you don't obey you could face fines going from $60 to nearly $500; if you have pending traffic tickets in Juárez.

The post Borderland drivers to be fined if they cut lines to cross to El Paso appeared first on KVIA.

]]>
https://kvia.com/news/border/2024/05/22/borderland-drivers-to-be-fined-if-they-cut-lines-to-cross-to-el-paso/feed/ 0 ]]>
National Travel and Tourism Week https://kvia.com/traffic/2024/05/21/national-travel-and-tourism-week/ https://kvia.com/traffic/2024/05/21/national-travel-and-tourism-week/#respond Tue, 21 May 2024 14:27:52 +0000 https://kvia.com/?p=1241106 MGN ONLINE

El Paso, TX (KVIA)—The Travel Information Center in Anthony will celebrate National Travel and Tourism Week. The center is one of 12 located near the Texas-New Mexico state line.  It is manned by professional travel counselors who will welcome you to Texas, assist with directions, and provide information on points of interest, events, and road

The post National Travel and Tourism Week appeared first on KVIA.

]]>
MGN ONLINE

El Paso, TX (KVIA)—The Travel Information Center in Anthony will celebrate National Travel and Tourism Week. The center is one of 12 located near the Texas-New Mexico state line. 

It is manned by professional travel counselors who will welcome you to Texas, assist with directions, and provide information on points of interest, events, and road conditions. Plus, we offer 24/7 access to restrooms, vending machines, and Wi-Fi, ensuring your comfort and convenience.

TxDOT also helps connect travelers with resources through travel publications, bicycle trail maps, EV charging stations, ferryboat schedules, and more at https://www.txdot.gov/discover.html.

For more information, a fair will be held on May 21, 2024, from 9:30 a.m. to noon at the TIC at 8799 S. Desert Blvd. 

The post National Travel and Tourism Week appeared first on KVIA.

]]>
https://kvia.com/traffic/2024/05/21/national-travel-and-tourism-week/feed/ 0 ]]>